Chrysothemis Paraskevopoulou

Dr. Chrysothemis Paraskevopoulou

School of Earth and Environnement, University of Leeds, Leeds LS2 9JT, UK
orcid

Research Focus & Metrics

Academic Career Length

14Years (2013-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
22 August 2017 in Geotechnical and Geological Engineering
Verified
Journal Article
Closed access
PDF file
CPChrysothemis Paraskevopoulou
Chrysothemis Paraskevopoulou
MPMatthew A Perras
Matthew A Perras
MDMark Diederichs
Mark Diederichs
SLSimon Loew
Simon Loew
TLTom Lam
Tom Lam
MJMark Jensen
Mark Jensen

8 September 2020 in Infrastructures
Verified
Journal Article
Open access
PDF file
CPChrysothemis Paraskevopoulou
Chrysothemis Paraskevopoulou
GBGeorgios Boutsis
Georgios Boutsis
Tunnelling projects seldom meet the initial budget requirements. Commonly, these types of projects suffer from cost overruns, which subsequently lead to project delivery delays mainly due to unsuccessful ground investigation as specified in the literature. The presented work scrutinises the effect of ground investigation in cost overruns. More specifically, various cost figures (total cost, construction cost, tunnel cost) are analysed for two case studies i) the Channel tunnel in the UK and ii) the Olmos Tunnel in Peru. Clayton’s relation between ground investigation and the construction cost is utilised and further investigated. In the Channel tunnel, the main problems faced led to a cost overrun of 78% for the total cost, 66% for the construction cost and 77% for the tunnelling cost. In the Olmos tunnel, two main geological scenarios are analysed and the construction cost overrun is calculated at 9.6% and 6.7%. Drawing on the conclusions, this research work proves that ground investigation can be one of the major factors influencing the tunnel cost.

10 May 2022 in Energies
Verified
Journal Article
Open access
PDF file
MCMarina Christopoulou
Marina Christopoulou
Petros KoutsovitisPetros Koutsovitis
Petros Koutsovitis
NKNikolaos Kostoglou
Nikolaos Kostoglou
CPChrysothemis Paraskevopoulou
Chrysothemis Paraskevopoulou
Alkiviadis SideridisAlkiviadis Sideridis
Alkiviadis Sideridis
Nikolaos KoukouzasNikolaos Koukouzas
Nikolaos Koukouzas
This study investigates the capability of the Southeast Mesohellenic Trough (SE MHT) sandstone formations to serve as a potential reservoir for CO2 storage in response to the emerging climate change issues by promoting environmentally friendly mineral sequestration applications. Sandstone samples, for the first time, were evaluated for their petrographic characteristics, mineral chemistry, geochemical properties, as well as their petrophysical and gas adsorption properties through tests. The sandstones were tested and classified into distinct groups. The most promising site to be considered for pilot CO2 storage testing is the Pentalofos Formation locality since its sandstones display specific mineral phases with the proper modal composition to conceivably react with injected CO2, leading to the development of newly formed and stable secondary mineral phases. The gas adsorption results are also more encouraging for sandstones from this sedimentary formation. All the measured UCS (uniaxial compressive strength), Ei (bending stiffness), and ν (Poisson’s ratio) results are above those dictated by international standards to perform CO2 storage practices safely. Furthermore, the specified targeted locality from the Pentalofos Formation holds the geological advantage of being overlaid by an impermeable cap-rock formation, making it suitable for deploying CO2 mineralization practices. The demarcated area could permanently store a calculated amount of ~50 × 105 tons of CO2 within the geological reservoir by reacting with the specified mineral phases, as specified through the proposed petrographic PrP index (potential reactive phases).

31 October 2018 in Geotechnical and Geological Engineering
Verified
Journal Article
Open access
PDF file
TSTanja Sattler
Tanja Sattler
CPChrysothemis Paraskevopoulou
Chrysothemis Paraskevopoulou
In the past, engineering geology mainly focused on soil and hard rocks, with little attention paid specifically to weak/soft rocks, defined by a UCS below 25 MPa (ISRM in Int J Rock Mech Min 18:85–110, 1981 ). Weak rock is an intermediate, which is difficult to analyze, and requires application of both soil and rock mechanics principles. The Sherwood Sandstone Group (SSG) in Nottinghamshire (UK) is often characterized as weak rock, containing extremely weak members, which display a UCS between 0.6 and 1 MPa according to the definition from BS 5930:2015 (British Standards Institution 2015 ). Little research has been conducted on the locally extremely weak members of the Sherwood Sandstone Group, in particular the Nottingham Castle Sandstone Formation, and engineering projects within this unit can face major design challenges. This study aims at investigating the intact material, characterizing the SSG and analysing the stability of a slope in a quarry between two water-filled silt lagoons at the Two Oak Quarry, close to Mansfield. Laboratory testing, including UCS tests, triaxial tests, tensile tests and Slake Durability tests, is conducted on the two geological units present on site, the Nottingham Castle Sandstone Formation and the Lenton Formation. From the analysis presented herein it is observed that the strength decreases as the degree of saturation increases, which can lead to a complete disintegration of the rock. In addition, the durability of the rock is determined, ranging from very low to moderately high, which has major implications on the longterm stability of the slope. The impact of the weathering on the long-term stability is difficult to establish and an estimation of the disintegration is conducted by comparing block sizes. A structural assessment confirms that failure along discontinuities is possible and requires further investigation. The Finite Element Analysis and the Limit Equilibrium Method are used for the assessment of the stability. Since similar factor of safety (FoS) are determined, both methods are considered applicable to the project, with limitations being detected when modelling discontinuities, impacting the design and the FoS. A suitable slope geometry is proposed, based on the intact material properties, the weathering characteristics, the heterogeneity of the material and structural features.

21 June 2021 in Bulletin of Engineering Geology and the Environment
Verified
Journal Article
Open access
PDF file
SSSarah Sissins
Sarah Sissins
CPChrysothemis Paraskevopoulou
Chrysothemis Paraskevopoulou
A major challenge that TBM performance is requested to deal with for a successful and effective progress is tunnelling through lithologically and geomechanically heterogeneous rock masses. Such heterogeneous environments are common and recent tunnel examples in the UK include the Hinckley Point C offshore cooling tunnels being driven through interbedded carbonaceous mudstone/shales and argillaceous limestone and the Anglo American’s Woodsmith Mine Mineral Transport System tunnel in Redcar Mudstone with beds of ironstone. This inherent geological heterogeneity leads to difficult tunnelling conditions that initially stem from predicting a sound and representative ground model that can be used to preliminary assess the TBM performance. In this work, an exhaustive review of existing TBM Penetration Rate (PR) methods identified that no models address the issue of parameter selection for heterogeneous rock masses comprising layers with different rock strengths. Consequently, new approaches are required for estimating rock mass behaviour and machine performance in such environments. In the presented work the Blue Lias Formation (BLI), which is characterised by its layered rock mass, comprising very strong limestone, interbedded with weak mudstone and shales, is investigated. BLI formation is considered herein being a representative example of lithological heterogeneity. Based on the fieldwork carried out in three localities in the Bristol Channel Basin (S. Wales and Somerset), geological models are produced based on which a geotechnical model is developed, and four ground types are determined. Implications of the current findings for TBM performance are assessed, including faulting, groundwater inflow and excavation stability with a particular focus on both PR and advance rate. A modified approach using the existing empirical models is proposed, developed and presented in this paper that can be used as a guide to determine TBM performance in heterogeneous rock masses reducing the risk of cost and time overruns.

12 August 2023 in Geosciences
Verified
Journal Article
Open access
PDF file
JTJonathan Tyrer
Jonathan Tyrer
CPChrysothemis Paraskevopoulou
Chrysothemis Paraskevopoulou
RSRavi Shah
Ravi Shah
RMRichard Miller
Richard Miller
Michael KavvadasMichael Kavvadas
Michael Kavvadas
Urban tunnelling can be highly challenging, especially in areas where limited ground settlements and environmental disturbance is required. Mechanised tunnelling is usually preferred in such ground environments, specifically Slurry or EPBM (Earth Pressure Balance Machine), depending on the ground properties. Being able to predict the anticipated tunnel behaviour at the preliminary stages of the project can be very beneficial in optimising not only the design, but also control the construction activities and completion times. In practice, the short-term excavation response and support performance focus primarily on design, since most site characterisation inputs are focused on material properties gained from short-term testing. Although the analysis of tunnelling is a three-dimensional (3D) problem, conventional approaches and design methods employed during the design and construction of underground openings are often based on the ground’s static response in two dimensions (2D). In this paper, an initial 2D model is generated in PLAXIS2D and RS2 (Rocscience) to test advanced constitutive models and compare transverse settlement profiles; subsequently, a complete 3D FEM numerical model in RS3 (Rocscience) was used to simulate an Earth Pressure Balance (EPB) excavation sequence. The 3D numerical model simulates the relevant EPB components such as face pressure, TBM shield, backfilling of the tail void (time-dependent hardening of the grout) and gradual segmental lining erections in the longitudinal direction. The presented numerical approach can be used by tunnel designers and engineers to predict the soil response in EPBM tunnelling.