Sang Luo

Sang Luo


Research Focus & Metrics

Academic Career Length

12Years (2015-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 February 2015 in Construction and Building Materials
Verified
Journal Article
Closed access
SLSang Luo
Sang Luo
Qing LuQing Lu
Qing Lu
ZQZhendong Qian
Zhendong Qian

1 September 2015 in Construction and Building Materials
Verified
Journal Article
Closed access
SLSang Luo
Sang Luo
XYXu Yang
Xu Yang

1 February 2019 in Construction and Building Materials
Verified
Journal Article
Closed access
ZLZiming Liu
Ziming Liu
XYXu Yang
Xu Yang
YWYongdan Wang
Yongdan Wang
SLSang Luo
Sang Luo

1 January 2021 in Advances in Civil Engineering
Verified
Journal Article
Open access
PDF file
JTJiahao Tian
Jiahao Tian
SLSang Luo
Sang Luo
XWXinming Wang
Xinming Wang
Jing HuJing Hu
Jing Hu
JYJun Yin
Jun Yin
Modular construction methods are adopted in many spatial and temporal limited projects. As the major equipment used in modular construction, the mobile crane affects the safety and efficiency of construction significantly. Currently, building information modeling (BIM) is widely adopted to improve the lifting operation planning of cranes. However, the inaccurate simulation of the dynamic construction environment makes those BIM‐based lifting operation planning methods unsuitable for land mobile cranes operation planning, such as in the overpass bridge construction project, which may cause several safety risks during the lifting process. Based on an overpass steel bridge construction project, this paper attempted to integrate the BIM and unmanned aerial vehicles (UAVs) to streamline lifting operation planning and construction monitoring. Specifically, in the preliminary stage, a level of development (LOD) 400 steel superstructure model was built and then divided into eighty sections. In addition, a three‐dimensional (3D) geology model of the as‐is construction site was modeled by UAV‐captured images. Then, a fusion model which contains the lifting modules models, the as‐is site model, and the crane model was gathered, based on which the collision detection was conducted by 4D crane operating path simulation. According to the results, three potential collisions were found and eliminated by lengthening the jib of the crane from 43.5 m to 46.5 m. Furthermore, the optimum crane location for lifting each steel structure was determined based on the 3D geology model. The study shows that the UAV is able to acquire geological information and then 3D simulates the real construction environment quickly and accurately. Furthermore, BIM and UAV have the potential to optimize the design and construction as well as the monitoring of bridge projects.

1 July 2017 in Construction and Building Materials
Verified
Journal Article
Closed access
SLSang Luo
Sang Luo
Qing LuQing Lu
Qing Lu
ZQZhendong Qian
Zhendong Qian
HWHui Wang
Hui Wang
YHYueyue Huang
Yueyue Huang

6 May 2022 in IEEE Transactions on Intelligent Transportation Systems
Verified
Journal Article
Closed access
SLSang Luo
Sang Luo
JYJinyue Yao
Jinyue Yao
JHJing Hu
Jing Hu
YWYaozheng Wang
Yaozheng Wang
SCShengdi Chen
Shengdi Chen
Efficient distress detection and identification analysis are of great significances for long-span steel bridge deck pavement maintenance. This paper proposes a pavement distress recognition method based on road quality detection equipment and deep learning. Firstly, the sub-block image is used as the processing unit, and the three-dimensional image is divided into fracture surface element and background surface element. A pavement crack recognition network (PDRNet) based on convolutional neural network is proposed, which is used for automatic recognition of pavement background element and pavement crack element. Then, considering the pixel-level neighborhood characteristics of cracks in 3D pavement images, the PDRNet model is used to detect and quantitatively evaluate pavement cracks, which combines the crack elevation detection method to extract the complete contour of cracks in the crack surface element. Finally, the distress database containing three-dimensional markers is integrated into the pavement maintenance management platform. Results show that the PDRNet proposed in this paper has high prediction accuracy on the verification set and shows good robustness to various distress, and the average accuracy is above 88%. The established spatial-temporal integration platform overcomes the communication bottleneck between different types of data, and is important to improve the maintenance management level and predict the long-term development of distress.