Charles Kibert

Charles Kibert


Research Focus & Metrics

Academic Career Length

35Years (1992-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 October 2018 in Renewable and Sustainable Energy Reviews
Verified
Journal Article
Closed access
AFAndriel Evandro Fenner
Andriel Evandro Fenner
CKCharles Kibert
Charles Kibert
JWJunghoon Woo
Junghoon Woo
SMShirley Morque
Shirley Morque
MRMohamad Razkenari
Mohamad Razkenari
XLXiaoshu Lu
Xiaoshu Lu

1 January 1997 in Construction Management and Economics
Verified
Journal Article
Closed access
CPChun-Li Peng
Chun-Li Peng
DSDomenic E. Scorpio
Domenic E. Scorpio
CKCharles Kibert
Charles Kibert
Establishing a successful construction/demolition (C&D) waste recyling operation in the USA is a challenge today, especially because secondary materials markets have not yet matured. Increasingly, municipal solid waste (MSW) landfill operations refuse to accept C&D waste. Skyrocketing tipping fees due to the scarcity of landfill sites, and growing concerns from regulatory agencies and the public, have placed C&D waste recycling operations under intense scrutiny. The experiences of regional C&D recyclers indicate that successful recycling operations require a minimum of 0.8 ha of clear space for processing equipment, incoming waste stockpiles, recycled materials, and manoeuvring room for mobile equipment and operations. Reasonable quality, reliable equipment suitable for these operations generally costs between $300 000 and $750 000 for a 400–500 tonne/day operation. At present, operators of these facilities make a profit almost solely on tipping fees, with the recycling operation functioning mainly to maintain materials throughput. Different categories of C&D recycling machinery and waste processing strategies are presented. Strategies for converting C&D landfills into successful C&D recycling operations are also examined. C&D waste recycling economics are presented to demonstrate the essential ingredients for successful operations.


1 April 2015 in Applied Energy
Verified
Journal Article
Closed access
Xiaoshu LuXiaoshu Lu
Xiaoshu Lu
TLTao Lu
Tao Lu
CKCharles Kibert
Charles Kibert
MVMartti Viljanen
Martti Viljanen

13 September 2007 in Building Research & Information
Verified
Journal Article
Closed access
CKCharles Kibert
Charles Kibert
(2007). The next generation of sustainable construction. Building Research & Information: Vol. 35, Next Generation Sustainable Construction, pp. 595-601.

24 June 2015 in International Journal of Injury Control and Safety Promotion
Verified
Journal Article
Closed access
MFMaryam Mirhadi Fard
Maryam Mirhadi Fard
STSeyyed Amin Terouhid
Seyyed Amin Terouhid
CKCharles Kibert
Charles Kibert
HHHamed Hakim
Hamed Hakim
The US construction industry annually experiences a relatively high rate of fatalities and injuries; therefore, improving safety practices should be considered a top priority for this industry. Modular/prefabricated building construction is a construction strategy that involves manufacturing of the whole building or some of its components off-site. This research focuses on the safety performance of the modular/prefabricated building construction sector during both manufacturing and on-site processes. This safety evaluation can serve as the starting point for improving the safety performance of this sector. Research was conducted based on Occupational Safety and Health Administration investigated accidents. The study found 125 accidents related to modular/prefabricated building construction. The details of each accident were closely examined to identify the types of injury and underlying causes. Out of 125 accidents, there were 48 fatalities (38.4%), 63 hospitalized injuries (50.4%), and 14 non-hospitalized injuries (11.2%). It was found that, the most common type of injury in modular/prefabricated construction was ‘fracture’, and the most common cause of accidents was ‘fall’. The most frequent cause of cause (underlying and root cause) was ‘unstable structure’. In this research, the accidents were also examined in terms of corresponding location, occupation, equipment as well as activities during which the accidents occurred. For improving safety records of the modular/prefabricated construction sector, this study recommends that future research be conducted on stabilizing structures during their lifting, storing, and permanent installation, securing fall protection systems during on-site assembly of components while working from heights, and developing training programmes and standards focused on modular/prefabricated construction.