Afshar Shokri

Dr. Afshar Shokri

PhD candidate
orcid

Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
15 July 2023 in Energy
Verified
Journal Article
Closed access
SASadegh Afzal
Sadegh Afzal
BZBehrooz M. Ziapour
Behrooz M. Ziapour
ASAfshar Shokri
Afshar Shokri
HSHamid Shakibi
Hamid Shakibi
BSBehnam Sobhani
Behnam Sobhani

1 March 2019 in Energy Conversion and Management
Verified
Journal Article
Closed access
HRHadi Rostamzadeh
Hadi Rostamzadeh
MEMohammad Ebadollahi
Mohammad Ebadollahi
HGHadi Ghaebi
Hadi Ghaebi
ASAfshar Shokri
Afshar Shokri

1 November 2019 in Energy
Verified
Journal Article
Closed access
SASamareh Ahmadi
Samareh Ahmadi
HGHadi Ghaebi
Hadi Ghaebi
ASAfshar Shokri
Afshar Shokri

27 September 2020 in Sustainability
Verified
Journal Article
Open access
PDF file
Farzad HamrangFarzad Hamrang
Farzad Hamrang
ASAfshar Shokri
Afshar Shokri
SMS. M. S. Mahmoudi
S. M. S. Mahmoudi
BEBiuk Ehghaghi
Biuk Ehghaghi
Marc RosenMarc Rosen
Marc Rosen
Integrated biomass gasification combined cycles can be advantageous for providing multiple products simultaneously. A new electricity and freshwater generation system is proposed based on the integrated gasification and gas turbine cycle as the main system, and a steam Rankine cycle and multi-effect desalination system as the waste heat recovery units. To evaluate the performance of the system, energy, exergy, and economic analyses were performed. Also, a parametric analysis was performed to assess the effects of various parameters on the system’s performance criteria. The economic feasibility of the plant was analyzed in terms of net present value. For the base case, the performance metrics are evaluated as W.net=8.347 MW, ε=46.22%, SUCP=14.07 $/GJ, and m.fw=11.7 kg/s. Among all components of the system, the combustion chamber is the greatest contributor to the exergy destruction rate, at 3250 kW. It is shown with the parametric analysis that raising the combustion temperature leads to higher electricity and freshwater production capacity. For a fuel cost of 2 $/GJ and an electricity price of 0.07 $/kWh, the total net present value at the end of plant’s lifespan is 6.547×106 $, and the payback period is 6.75 years. Thus, the plant is feasible from an economic perspective.
1

1 September 2019 in Energy Conversion and Management
Verified
Journal Article
Closed access
TPTowhid Parikhani
Towhid Parikhani
JJJavad Jannatkhah
Javad Jannatkhah
ASAfshar Shokri
Afshar Shokri
HGHadi Ghaebi
Hadi Ghaebi

4 April 2022 in Journal of Energy Storage
Verified
Journal Article
Closed access
HSHamid Shakibi
Hamid Shakibi
SASadegh Afzal
Sadegh Afzal
ASAfshar Shokri
Afshar Shokri
BSBehnam Sobhani
Behnam Sobhani