Considering the controllability and high responsiveness of an energy storage system (ESS) to changes in frequency, the inertial response (IR) and primary frequency response (PFR) enable its application in frequency regulation (FR) when system contingency occurs. This paper presents a coordinated control of an ESS with a generator for analyzing and stabilizing a power plant by controlling the grid frequency deviation, ESS output power response, equipment active power, and state of charge (SoC) limitation of the ESS in a power plant. The conventional generator and FR-ESS controllers were investigated and compared. To obtain the optimal frequency and power response, an ESS-based adaptive droop control method was proposed. The proposed control strategy was developed and implemented considering the changes and limitations of the dynamic characteristics of the system, FR requirements, and an ESS using the PSCAD/EMTDC software. The simulation results showed that the proposed method was more effective than the conventional droop-control-based FR-ESS, and the effectiveness of this method was validated.
The aim of this work is to analyze and stabilize the power system when connecting an energy storage system (ESS) to replace the traditional power reserve of a power plant. Thus, it is necessary to validate and simulate the power facility protection system using a relay coordination approach. The input feasibility of the generator for the frequency regulation (FR) of the operational ESS is also validated through detailed analysis studies including power flow, short circuit and relay coordination analysis. The case scenarios for ESS installation are categorized based on its operation mode and location in the power system. These studies are carried out on the power system at the peak load condition specified for both grids. With the electrical transient analyzer program (ETAP), an analysis is performed to study the implementation of the ESS in a large, integrated power system to determine which location best fits the installation of ESS considering the load flow, short circuit and relay coordination results in each case scenario. Cost evaluation was performed for the choice of locations under study.