Rashid Mehmood

Dr. Rashid Mehmood


Research Focus & Metrics

Academic Career Length

15Years (2012-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
27 November 2017 in Journal of Statistical Computation and Simulation
Verified
Journal Article
Closed access
RMRashid Mehmood
Rashid Mehmood
SQSara Qazi
Sara Qazi
MRMuhammad Riaz
Muhammad Riaz
In this study two design structures of X¯ control chart are proposed for known and unknown process parameters, under the variety of runs rules and process distributions. The proposed structures are developed by taking into account certain margin of enhancements and limitations in existing studies as the subjects of current article. Outcomes of the study are obtained through two most commonly used performance measures, generally known as false alarm rate and power curve. Based on these measures, conclusion of the study shows that proposed structures perform outstandingly as compared to various existing counterparts. In continuation to, design structure for unknown parameters has capability to overcome the issue of existing runs rules, which generally occur when parameters are unknown.

29 March 2012 in Computational Statistics
Verified
Journal Article
Open access
PDF file
RMRashid Mehmood
Rashid Mehmood
MRMuhammad Riaz
Muhammad Riaz
RDRonald J.M.M. Does
Ronald J.M.M. Does
In this article we develop a power computation code in the R language which provides an easy to use tool to researchers in designing Shewhart control charts. It enables researchers to use different existing and newly introduced sensitizing rules and runs rules schemes designed for Shewhart-type control charts for location and spread. The code provides researchers to compute the power for different options of r out of m rules/schemes. The code is flexible to apply for any sample size, false alarm rate, type of control limits (one- or two-sided), amount of shift in the process parameters and a variety of popular distributions for commonly used Shewhart-type control charts (i.e. ${\bar{{X}} ,R ,S}$ and S 2 charts). These mentioned benefits of the developed functional code are only partially found in features of the existing software packages and these programs may be enhanced by adding the features of the developed code as a function in their libraries dealing with quality control charting.

11 June 2022 in Mathematics
Verified
Journal Article
Open access
PDF file
MRMuhammad Riaz
Muhammad Riaz
BZBabar Zaman
Babar Zaman
IRIshaq Adeyanju Raji
Ishaq Adeyanju Raji
MOM. Hafidz Omar
M. Hafidz Omar
RMRashid Mehmood
Rashid Mehmood
NANasir Abbas
Nasir Abbas
The special causes of variations, which is also known as a shift, can occur in a single or more than one related process characteristics. Statistical process control tools such as control charts are useful to monitor shifts in the process parameters (location and/or dispersion). In real-life situation, the shift is emerging in different sizes, and it is hard to identify it with classical control charts. Moreover, more than one process of characteristics required special attention because they must monitor jointly due to the association among them. This study offers two adaptive control charts to monitor the different sizes of a shift in the process mean vector. The novelty behind this study is to use dimensionally reduction techniques such as principal component analysis (PCA) and an adaptive method such as Huber and Bi-square functions. In brief, the multivariate cumulative sum control chart based on PCA is designed, and its plotting statistic is utilized as an input in the classical exponentially weighted moving average (EWMA) control chart. The run length (RL) properties of the proposed and other control charts are obtained by designing algorithms in MATLAB through a Monte Carlo simulation. For a single shift, the performance of the control charts is assessed through an average of RL, standard deviation of RL, and standard error of RL. Likewise, overall performance measures such as extra quadratic loss, relative ARL, and the performance comparison index are also used. The comparison reveals the superiority over other control charts. Furthermore, to emphasize the application process and benefits of the proposed control charts, a real-life example of the wind turbine process is included.

22 May 2018 in Iranian Journal of Science and Technology, Transactions A: Science
Verified
Journal Article
Closed access
PDF file
SHShahid Hussain
Shahid Hussain
LSLixin Song
Lixin Song
RMRashid Mehmood
Rashid Mehmood
MRMuhammad Riaz
Muhammad Riaz

4 February 2021 in Hacettepe Journal of Mathematics and Statistics
Verified
Journal Article
Closed access
PDF file
RMRashid Mehmood
Rashid Mehmood
MLMuhammad Lee
Muhammad Lee
IAIftikhar Ali
Iftikhar Ali
MRMuhammad Riaz
Muhammad Riaz
In this study, we have conducted comparative analysis between false alarm rate (FAR) and average run length (ARL) based control charts with runs rules. In this regard, we have considered various univariate and multivariate control charts which include mean, standard deviation, variance, Hotelling, and generalized variance. For evaluation purpose, we have used actual false alarm rate, power, in-control actual average run length, and out-of-control average run length as performance indicators. Furthermore, the performance indicators are calculated through Monte Carlo simulation procedures. Results revealed that performance order of runs rules with FAR based control charts are persistent whereas, performance order of runs rules with ARL based control charts are dependent on the circumstances, that is, sample size, size of shift, type of control chart, and side of control limit (upper-sided and lower-sided). Besides, we have provided a real life example using the data on electrical resistance of insulation. In this approach, we have determined that behaviour of FAR and ARL based control charts using the real data is recorded similar to the behavior using the statistical performance indicators.

19 April 2022 in Arabian Journal for Science and Engineering
Verified
Journal Article
Closed access
PDF file
BZBabar Zaman
Babar Zaman
MLMuhammad Lee
Muhammad Lee
MRMuhammad Riaz
Muhammad Riaz
MAMUAZU ABUJIYA
MUAZU ABUJIYA
RMRashid Mehmood
Rashid Mehmood
NANasir Abbas
Nasir Abbas