Craig Langston

Prof. Craig Langston

Faculty of Society and Design, Bond University, Gold Coast 4229, Australia
orcid

Research Focus & Metrics

Academic Career Length

17Years (2010-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 July 2019 in Energy and Buildings
Verified
Journal Article
Closed access
Ting LuoTing Luo
Ting Luo
YTYongtao Tan
Yongtao Tan
Craig LangstonCraig Langston
Craig Langston
XXXiaolong Xue
Xiaolong Xue

17 August 2021 in Sustainability
Verified
Journal Article
Open access
PDF file
Craig LangstonCraig Langston
Craig Langston
WZWeiwei Zhang
Weiwei Zhang
Design for manufacture and assembly (DfMA) is an important part of the future of the construction industry due to the promise of speed of project delivery, quality control, worker safety, and waste minimization onsite via the purposeful design for manufacture and assembly offsite. However, the adoption of DfMA in Australia has been slow. This paper investigates the barriers prohibiting widespread uptake and how digital construction will be a catalyst for improving use on commercial-scale projects. A total of six leading experts were interviewed to elicit their opinions, and seven recent case studies of high-rise modular apartment and hotel buildings constructed by Hickory were cross-referenced as evidence of DfMA capability. The experts suggested that the reasons for slow adoption in Australia were community mindset, government regulations and incentives, planning and building codes, unionization and business politics, finance, and supply chain management. The case studies suggest that compatible building type and transportation distance are also factors. These barriers can be addressed by the clever integration of building information modelling tools with lean construction processes as part of a proposed strategy leading to smarter (more productive) and better (more sustainable) outcomes predicated on growth in digital construction practices. The paper concludes with a proposed framework for change that conceptualizes the ‘ecosystem’ needed to support widespread DfMA in the Australian context, including the paradigm shift from building to manufacturing/assembly, the displacement of workers from onsite to offsite activity, and the expansion of interdisciplinary design and construct collaboration.

24 February 2012 in Facilities
Verified
Journal Article
Open access
PDF file
Craig LangstonCraig Langston
Craig Langston
Purpose: This paper aims to focus on the adaptive reuse of existing buildings that have become obsolete, an important strategy for sustainable development and a pertinent response to excessive resource usage resulting from typical destruction and redevelopment.Design/methodology/approach: This paper looks at the validity of earlier work to model adaptive reuse potential (ARP) using a new multiple criteria decision analysis tool called iconCUR. Based on a review of 12 case studies, the paper determines the extent of agreement between ARP and iconCUR evaluations that both claim to be useful in making decisions about reuse.Findings: The results show a high correlation between these approaches, whether based on raw scores or on relative ranking, and match expert opinion concerning appropriate actions. This work represents the culmination of a three‐year study into the strategic assessment of building adaptive reuse opportunities.Originality/value: The paper provides confidence in the modelling of future interventions to revitalise existing built assets using a triple bottom line perspective.

8 December 2016 in Construction Economics and Building
Verified
Journal Article
Open access
PDF file
Craig LangstonCraig Langston
Craig Langston
Amir GhanbaripourAmir Ghanbaripour
Amir Ghanbaripour
Common sense suggests that organisations are more likely to deliver successful projects if they have systems in place that reflect a mature project environment based on a culture of continuous improvement. This paper develops and discusses a Management Maturity Model (MMM) to assess the maturity of project management organisations through a customisable, systematic, strategic and practical methodology inspired from the seminal work of Darwin, Deming, Drucker and Daniel. The model presented is relevant to organisations, such as construction and engineering companies, that prefer to use the Project Management Body of Knowledge (PMBOK™ Guide) published by the Project Management Institute (PMI), but without the disadvantages of excessive time and cost commitments and a ‘one size fits all’ approach linked to rigid increments of maturity. It offers a game-changing advance in the application of project-based organisational performance assessment compared to existing market solutions that are unnecessarily complex. The feasibility of MMM is field-tested using a medium-sized data centre infrastructure firm in Tehran.

1 October 2010 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
YTYongtao Tan
Yongtao Tan
LSLiyin Shen
Liyin Shen
Craig LangstonCraig Langston
Craig Langston
Selecting an appropriate competition strategy in bidding is the ambition of most contractors. The multiple requirements of clients encourage contractors to consider other strategies to deliver additional benefits besides offering a low-price bid. Offering low bids will reduce contractors’ profits and potentially make development less attractive. Contractors need to understand their specific resources that generate competitive advantage and accordingly develop strategies to win contracts. This paper reports the findings from a recent survey on competition strategies in the Hong Kong construction industry. Thirteen typical bidding strategies, their used frequency in bidding, and their effectiveness for winning contracts of different types and between different groups of contractors are studied. The analysis of findings is explored to provide local contractors and clients with new insights into competition strategies in bidding.