Farouk Yalaoui

Prof. Farouk Yalaoui

Logistics and Industrial Systems Optimization Laboratory (LOSI); Holder of Connected Innovation Chair; University of Technology of Troyes; Troyes, France

Research Focus & Metrics

Academic Career Length

24Years (2003-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
21 March 2012 in Journal of Intelligent Manufacturing
Verified
Journal Article
Closed access
PDF file
FBFarah Belmecheri
Farah Belmecheri
CPChristian Prins
Christian Prins
FYFarouk Yalaoui
Farouk Yalaoui
LALionel Amodeo
Lionel Amodeo

1 February 2003 in IIE Transactions
Verified
Journal Article
Closed access
FYFarouk Yalaoui
Farouk Yalaoui
CCChengbin Chu
Chengbin Chu
In this paper, we consider a simplified real-life identical parallel machine scheduling problem with sequence-dependent setup times and job splitting to minimize makespan. We propose a heuristic to solve this problem. Our method is composed of two parts. The problem is first reduced into a single machine scheduling problem with sequence-dependent setup times. This reduced problem can be transformed into a Traveling Salesman Problem (TSP), which can be efficiently solved using Little's method. In the second part, a feasible initial solution to the original problem is obtained by exploiting the results of the first part. This initial solution is then improved in a step by step manner, taking into account the setup times and job splitting. We develop a lower bound and evaluate the performances of our heuristic on a large number of randomly generated instances. The solution given by our heuristic is less than 4.88% from the lower bound.

1 March 2013 in The International Journal of Advanced Manufacturing Technology
Verified
Journal Article
Closed access
PDF file
ABAli Berrichi
Ali Berrichi
FYFarouk Yalaoui
Farouk Yalaoui

10 March 2023 in Energies
Verified
Journal Article
Open access
PDF file
HGHamza GRIBISS
Hamza GRIBISS
MAMehdi Aghelinejad
Mehdi Aghelinejad
FYFarouk Yalaoui
Farouk Yalaoui
By 2050, the European Union plans to make Europe the first carbon-neutral continent and a global leader in climate-green industries. Recently, many decisions have been taken in the world to ensure the energy transition from fossil fuel to renewable energy. The creation of renewable energy communities (REC) is among the solutions used to increase this transition. This study presents 16 different configurations for energy self-consumption in RECs containing different industrial factories. One mathematical model is proposed for each configuration, and they have been solved according to different criteria. The comparisons are made between these configurations according to economic, environmental, technical, and social criteria. Then, four multi-criteria decision-making (MCDM) methods are used to choose the best configurations considering all the criteria. For this purpose, the achieved results from the mathematical models are used as input for the MCDM methods. The findings demonstrate that the most effective configurations combine both individual and collective self-consumption. Furthermore, the inclusion of collective production results in multiple advantages, including a 64.71% rise in economic gains, a 26.95% decrease in CO2 emissions, a 21.39% improvement in self-sufficiency, and a significant increase in job creation by 175.24%. In addition, incorporating storage enables a substantial rise in the degree of self-sufficiency, leading to reduced reliance on the power grid and consequent reduction in CO2 emissions.

1 January 2014 in International Journal of Computational Intelligence Systems
Verified
Journal Article
Open access
PDF file
YOYassine Ouazene
Yassine Ouazene
FYFarouk Yalaoui
Farouk Yalaoui
HCHicham Chehade
Hicham Chehade
AYAlice Yalaoui
Alice Yalaoui
This paper addresses the workload balancing problem in identical parallel machines context. The problem consists of assigning n different jobs to m identical parallel machines in order to minimize the workload imbalance among the different machines. This problem is formulated as a linear mixed integer program to minimize the difference between the greatest and smallest workload assigned to each machine. Based on some numerical examples reported in the literature, we establish that the classical formulation which consists of minimizing the greatest machine completion time does not provide the optimal workload repartition. That is why we consider a new mathematical formulation based on the minimization of the difference between the workload of the bottleneck machine and the workload of the fastest machine. The proposed programming method is also used to provide optimal solutions in reasonable computational times for different test problems presented in the literature by Raghavendra and Murthy 10 to test their genetic algorithm.

19 November 2010 in Journal of Intelligent Manufacturing
Verified
Journal Article
Closed access
PDF file
YMY. Massim
Y. Massim
FYFarouk Yalaoui
Farouk Yalaoui
ECEric Chatelet
Eric Chatelet
AYAlice Yalaoui
Alice Yalaoui
AZA. Zeblah
A. Zeblah