Active seismic faults in the Pacific Northwest area have encouraged electric utilities in the region to deeply contemplate and proactively intervene to support grid resilience. To further this effort this research introduces Monte Carlo (MC)-based power system modeling as a means to inform the Performance Based Earthquake Engineering method and simulates 100,000 sample earthquakes of a 6.8 magnitude (M6.8) Portland Hills Fault (PHF) scenario in the Portland General Electric (PGE) service territory as a proof of concept. This paper also proposes the resilience metric Seismic Load Recovery Factor (SLRF) to quantify the recovery of a downed power system and thus can be used to quantify earthquake economic risk. Using MC results, the SLRF was evaluated to be 19.7 h and the expected economic consequence cost of a M6.8 PHF event was found to be $180 million with an annualized risk of $90,000 given the event’s 1 in 2000 year probability of occurrence. The MC results also identified the eight most consequential substations in the PGE system—i.e., those that contributed to maximum load loss. This paper concludes that retrofitting these substations reduced the expected consequence cost of a M6.8 PHF event to $117 million.
This paper provides an overview of the unique approach taken by a multi-discipline team consisting of Washington State Ferries (WSF) personnel, structural and geotechnical engineers, and economists to perform a risk assessment of a portion of WSF's aging timber trestle inventory. The intent of the assessment was to establish the cost-effectiveness of trestle replacement compared to refurbishment by quantifying risk for a range of seismic events and incorporating that risk into WSF's Asset Management Model. Failure scenarios developed using site-specific characteristics - such as trestle condition and site seismicity - were coupled with life cycle cost modeling techniques to assess the risks associated with doing nothing, refurbishing the existing trestles, or completely replacing the trestles at seven ferry terminals. This paper describes the approach developed to create an economic model and evaluate the efficacy of trestle upgrade and replacement options. A case study of the trestle at the Vashon Island terminal is included to demonstrate direct implementation of the approach and the results obtained.