Yu Cao

Ms. Yu Cao


Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
16 February 2021 in Acta Geodaetica et Geophysica
Verified
Journal Article
Closed access
PDF file
YCYu Cao
Yu Cao
GHGuanwen Huang
Guanwen Huang
WXWei Xie
Wei Xie
Shichao XieShichao Xie
Shichao Xie
HWHaohao Wang
Haohao Wang

4 November 2019 in Remote Sensing
Verified
Journal Article
Open access
PDF file
ZQZhiwei Qin
Zhiwei Qin
GHGuanwen Huang
Guanwen Huang
QZQin Zhang
Qin Zhang
LWLe Wang
Le Wang
XYXingyuan Yan
Xingyuan Yan
XWXiaolei Wang
Xiaolei Wang
In order to provide better service for the Asia-Pacific region, the BeiDou navigation satellite system (BDS) is designed as a constellation containing medium earth orbit (MEO), geostationary earth orbit (GEO), and inclined geosynchronous orbit (IGSO). However, the multi-orbit configuration brings great challenges for orbit determination. When orbit maneuvering, the orbital elements of the maneuvered satellites from broadcast ephemeris are unusable for several hours, which makes it difficult to estimate the initial orbit in the process of precise orbit determination. In addition, the maneuvered force information is unknown, which brings systematic orbit integral errors. In order to avoid these errors, observation data are removed from the iterative adjustment. For the above reasons, the precise orbit products of maneuvered satellites are missing from IGS (international GNSS (Global Navigation Satellite System) service) and iGMAS (international GNSS monitoring and assessment system). This study proposes a method to determine the precise orbits of maneuvered satellites for BeiDou GEO and IGSO. The initial orbits of maneuvered satellites could be backward forecasted according to the precise orbit products. The systematic errors caused by unmodeled maneuvered force are absorbed by estimated pseudo-stochastic pulses. The proposed method for determining the precise orbits of maneuvered satellites is validated by analyzing data of stations from the Multi-GNSS Experiment (MGEX). The results show that the precise orbits of maneuvered satellites can be estimated correctly when orbit maneuvering, which could supplement the precise products from the analysis centers of IGS and iGMAS. It can significantly improve the integrality and continuity of the precise products and subsequently provide better precise products for users.

14 April 2025 in Remote Sensing
Verified
Journal Article
Open access
PDF file
YCYu Cao
Yu Cao
LWLe Wang
Le Wang
ZQZhiwei Qin
Zhiwei Qin
WLWen Lai
Wen Lai
SDShi Du
Shi Du
YWYuanyuan Wang
Yuanyuan Wang
High-precision clock offset products directly affect the performance and reliability of precise point positioning (PPP) applications. Currently, real-time clock offset products offered by institutions such as the Centre national d’études spatiales (CNES) rely on ultra-rapid predicted orbits. However, these orbits have limited accuracy and exhibit jumps during updates, constraining the accuracy of real-time clock estimation. To address this issue, we propose an undifferenced ambiguity resolution (UD AR) technique for clock offset estimation based on epoch-wise updated orbits. Clock estimation experiments were performed using both predicted and epoch-wise updated orbits, with square root information filtering (SRIF) applied in three schemes: double-differenced (DD), UD, and float solutions. Compared with predicted orbits, epoch-wise updated orbits provided smoother sequences with higher accuracy, significantly improving clock offset estimation accuracy in all schemes. Moreover, the UD AR solution significantly enhanced clock offset estimation accuracy, and the high-precision epoch-wise updated orbit products increased the narrow-lane fixing rate of the UD solutions. The clock accuracies of BDS-3, Galileo, and GPS reached 0.032 ns, 0.023 ns, and 0.026 ns, respectively, representing improvements of 36%, 34%, and 41% compared with the float solutions and 41%, 30%, 26% compared with the UD solution based on 1 h predicted orbits. Finally, the positioning performance of the proposed method was validated via PPP using 25 stations, showing improvements of 50%, 48%, and 41% in the north, east, and up directions compared with CNES products. Therefore, by combining epoch-wise updated orbit products with the UD AR to improve clock accuracy, this method provides a new approach to generating high-precision clock products, significantly contributing to enhancing PPP services.