Huaiyuan Wang

Dr. Huaiyuan Wang

orcid

Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
14 March 2019 in IEEE Access
Verified
Journal Article
Open access
JLJin Li
Jin Li
BWBuying Wen
Buying Wen
HWHuaiyuan Wang
Huaiyuan Wang

21 June 2022 in IEEE Transactions on Power Systems
Verified
Journal Article
Closed access
QCQifan Chen
Qifan Chen
NLNan Lin
Nan Lin
Siqi BuSiqi Bu
Siqi Bu
HWHuaiyuan Wang
Huaiyuan Wang
BZBaohui Zhang
Baohui Zhang
Fast and reliable transient stability assessment (TSA) is significant for safe and stable power system operation. Deep learning provides a new tool for TSA. However, it is difficult to apply the TSA models based on deep learning practically because of their inexplicability. Therefore, an interpretable time-adaptive model based on a dual-stage attention mechanism and gated recurrent unit (GRU) is proposed for TSA. A feature attention block and a time attention block are included in the dual-stage mechanism to explain the TSA rules learned by the proposed TSA model. Meanwhile, interpretability is utilized to guide the optimization of the TSA model. Firstly, the measurements are input into the feature attention block to calculate feature attention factors. Then, the measurements weighted by the feature attention factors are input into a GRU block for further abstracting. The abstracted features are input into the time attention block to obtain time attention factors. Finally, the abstracted features weighted by the time attention factors are sent into fully connected layers for TSA. To achieve time-adaptive TSA, multiple channels are constructed to process the features at different decision moments. The performance of the proposed model is verified in the IEEE-39 bus system and a realistic regional system.

17 April 2020 in IET Generation, Transmission & Distribution
Verified
Journal Article
Open access
PDF file
HWHuaiyuan Wang
Huaiyuan Wang
QCQifan Chen
Qifan Chen
BZBaohui Zhang
Baohui Zhang
The real‐time transient stability assessment (TSA) is critical for emergency control of power systems. Accurate and fast TSA can provide an important basis for post‐fault control of power systems. At present, the accuracy of the evaluation model based on machine learning is very high, but there are still some misjudgements in the results. In order to build a high‐accuracy evaluation model, a novel frame based on the cost‐sensitive method is proposed. Firstly, a deep belief network (DBN) is applied to build a TSA frame. The DBN is effectively trained by means of pre‐training and fine tuning. Secondly, two models with the opposite preference are constructed based on the cost‐sensitive method. Based on the output results of the two models, the deterministic or uncertain evaluation results are obtained. The samples that may be misclassified are divided into uncertain evaluation results. Thus, the accuracy of the deterministic evaluation results can be improved greatly. Through this design, the practicability of the evaluation model based on machine learning is greatly improved. The effectiveness of the proposed scheme is verified by the simulation results in the IEEE‐39 bus system and a realistic regional system.

31 December 2024 in IEEE Transactions on Power Systems
Verified
Journal Article
Closed access
QCQifan Chen
Qifan Chen
Siqi BuSiqi Bu
Siqi Bu
HWHuaiyuan Wang
Huaiyuan Wang
CLChao Lei
Chao Lei
Multi-stability risk assessment (MSRA) is more practical than singular stability risk assessment in power system operation considering increasing uncertainties, e.g., renewable power generation and system faults. In this paper, a real-time MSRA method based on a graph neural network (GNN) is proposed to effectively address multiple stability problems, including (small-disturbance and transient) rotor angle, (short-term and long-term) voltage, frequency, and converter-driven stability. An operating graph and a disturbance graph are developed as input features of GNN to completely characterize complex operating conditions and disturbances. In the GNN, the topology correlations in the inputs can be learned by graph convolutional layers via initial residual identity mapping, resulting in informative high-order features for MSRA. A GraphNorm method is employed in the GNN to tackle over-smoothing problems and improve generalizability effectively. Then, based on real-time data, the risks of the multiple types of stability can be simultaneously and continuously predicted by the GNN, and the stable and unstable operation regions (SURs) can be visualized based on alpha shapes. The effectiveness of the proposed method is verified in the IEEE 39-bus system, the 179-bus western electricity coordinating council (WECC) system, and the Great Britain (GB) system. The comparison results of SURs associated with multi-stability are demonstrated and discussed to prioritize major types of stability problems.

3 November 2022 in ISA Transactions
Verified
Journal Article
Closed access
HWHuaiyuan Wang
Huaiyuan Wang
LHLitao Hu
Litao Hu
YZYang Zhang
Yang Zhang

17 April 2019 in IEEE Access
Verified
Journal Article
Open access
PHPeican He
Peican He
BWBuying Wen
Buying Wen
HWHuaiyuan Wang
Huaiyuan Wang
The inertia of the power system changes when the generators in the system are disturbed or tripped. However, in some systems there is no control center or communication device falling behind. It makes real-time inertia difficult to obtain and affects the adaptive under frequency load shedding (UFLS) scheme. This paper proposes an adaptive decentralized UFLS scheme based on load information to overcome this problem. Firstly, a calculation method is derived according to the load information after the disturbance to identify the real-time of load equivalent virtual inertia. Then, the power deficit of load is estimated and the optimal adaptive load shedding scheme is obtained. Finally, compared with conventional UFLS schemes, the proposed scheme can be performed merely by load information. Hence, the requirement of communication conditions and the dependence on the control center are reduced. The simulation is carried out on the island utilizing the IEEE39-bus system. Furthermore, the accuracy of real-time identification of load equivalent virtual inertia and the validity of the load shedding scheme are verified.