Jose Ildefonso Rubrico

Dr. Jose Ildefonso Rubrico

University of the Philippines Mindanao
orcid

Research Focus & Metrics

Academic Career Length

21Years (2006-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 February 2011 in Robotics and Computer-Integrated Manufacturing
Verified
Journal Article
Closed access
JRJose Ildefonso Rubrico
Jose Ildefonso Rubrico
THToshimitu Higashi
Toshimitu Higashi
HTHirofumi Tamura
Hirofumi Tamura
JOJun Ota
Jun Ota

11 January 2008 in Industrial Robot: the international journal of robotics research and application
Verified
Journal Article
Closed access
PDF file
JRJose Ildefonso Rubrico
Jose Ildefonso Rubrico
JOJun Ota
Jun Ota
THT. Higashi
T. Higashi
HTH. Tamura
H. Tamura
Purpose – This paper aims to develop a scheduler for multiple picking agents in a warehouse that takes into account distance and loading queue delay minimization within the context of minimizing makespan (i.e. picking time). Design/methodology/approach – The paper uses tabu search to solve the scheduling problem in a more global sense. Each search iteration is enhanced by a custom local search (LS) procedure that hastens convergence by driving a given schedule configuration quickly to a local minimum. In particular, basic operators transfer demand among agents to balance load and minimize makespan. The new load distribution is further improved by considering a vehicle-routing problem on the picking assignments of the agents with relocated demands. Loading queue delays that may arise from the reassignments are systematically minimized using a fast scheduling heuristic. Findings – The proposed tabu scheduler greatly improves over a widely practiced scheduling procedure for the given problem. Variants of the tabu scheduler produce solutions that are roughly of the same quality but exhibit considerable differences in computational time. Research limitations/implications – The proposed methodology is applicable only to the static scheduling problem where all inputs are known beforehand. Furthermore, of the possible delays during picking, only loading queues are explicitly addressed (although this is justifiable, given that these delays are dominant in the problem). Practical implications – The proposed approach can significantly increase through-put and productivity in picking systems that utilize multiple intelligent agents (human pickers included), e.g. in warehouses/distribution centers. Originality/value – The paper addresses a practical scheduling problem with a high degree of complexity, i.e. scheduler explicitly deals with delays while trying to minimize makespan (generally, delays are ignored in the literature to simplify things). In the tabu implementation, an LS procedure is introduced in the metaheuristic loop that enhances the search process by minimizing non-productive time of picking agents (travel time and delays).

9 April 2019 in International Journal of Computer Integrated Manufacturing
Verified
Journal Article
Closed access
AJArent W. De Jong
Arent W. De Jong
JRJose Ildefonso Rubrico
Jose Ildefonso Rubrico
MAMasaru Adachi
Masaru Adachi
TNTakayuki Nakamura
Takayuki Nakamura
JOJun Ota
Jun Ota
In Shop Scheduling problems, minimising total processing time (makespan) by means of heuristic methods is one of the main goals for throughput optimisation. Furthermore, reliably estimating makespan is critical for new order acceptance and for heuristic method selection. However, heuristic methods solutions either come without estimates or with very slow ones. Current estimation approaches are limited to either the number of heuristic methods accounted for, or to specific Shop Scheduling subproblems. They are especially limited in generalising over shop layout configurations and limited to non-visual data input. In order to overcome these two hurdles, a convolutional neural network algorithm for quick and accurate makespan regression is proposed, applicable to a wide variety of Shop Scheduling Problems. This algorithm allows for an information-rich, visual representation of the problem, that generalises over shop layout configuration. This has not been tried by prior studies, and the authors argue that this is a main contribution of this work. Results are compared to prior approaches in terms of the R2 value. It is shown that, without compromising on estimation performance, the proposed algorithm improves upon prior research by allowing for visual input and for a wider variety of problems in terms of Shop Scheduling layout.

11 July 2019 in IEEE Access
Verified
Journal Article
Open access
SGSixiao Gao
Sixiao Gao
JRJose Ildefonso Rubrico
Jose Ildefonso Rubrico
THToshimitsu Higashi
Toshimitsu Higashi
TKToyokazu Kobayashi
Toyokazu Kobayashi
KTKosuke Taneda
Kosuke Taneda
JOJun Ota
Jun Ota
Analyzing throughput is very important for the design, optimization, and management of production lines. In this paper, we present an efficient throughput analysis approach for production lines with merging, splitting, and recirculating topologies. In particular, we define a decomposition regulation based on queue modules for the decomposition of the various topologies, and we improve an iterative approximation method for calculating and iterating the queue module state probabilities until the throughput of the production line is obtained. To decrease the computation time and automate the calculation process of the queue module state probabilities, we build a queue module database that includes the solution equations of common queue module state probabilities. The numerical examples show that our approach calculates the throughput of production lines with merging, splitting, and recirculating topologies with high accuracy (≥90%) and efficiency (completed in ten min). Our contribution is an efficient throughput evaluation methodology that can be used to rapidly estimate the performance and the cost of production lines with various topologies in the conceptual design phase of production lines in the industry.

10 July 2006
Verified
Conference Paper
Closed access
JRJose Ildefonso Rubrico
Jose Ildefonso Rubrico
JOJun Ota
Jun Ota
THT. Higashi
T. Higashi
HTH. Tamura
H. Tamura
The picking problem is a complex, NP-Hard problem wherein orders from a warehouse must be efficiently picked by agents that begin and end their picking sequences (trips/routes) from a common shed. The objectives are to minimize the total number of trips the agents make and the total operation time (makespan). We have proposed to breakdown the picking problem into sequential stages to reduce its overall complexity as shown in Fig.1. The Route Generation (RG) stage creates a set of trips from the orders made on the warehouse - it does this with the aim of minimizing both the number of trips and the total distance covered by the trips. The Route Assignment (RA) stage then assigns the generated trips to a given number of agents that are tasked with picking the products. The aim of RA is to assign the trips such that there is maximal equity of tasks among the agents, i.e. it tries to minimize the difference between the longest and shortest operation times. By ensuring load balancing, the maximum agent operation time is also minimized. The final Dispatching stage, which is our main interest here, is concerned with a) the sequence in which agents are dispatched one after the other and b) the order by which routes assigned to a given agent are traversed. We formulate a model for the dispatching problem and show that it has a non-polynomial complexity with respect to the number of agents and number of routes. We then propose an effective simulation-based scheduling procedure to solve the problem with the aim of reducing agent interactions such as collisions or queues. We simulate a real warehouse environment (Fig.2) and show that the said dispatching procedure is able to keep delays caused by collisions and queues significantly low, and that it makes large improvements over the case when no dispatching policy is applied to the agents (Fig.3).

30 November 2020 in Applied Sciences
Verified
Journal Article
Open access
PDF file
SGSixiao Gao
Sixiao Gao
THToshimitsu Higashi
Toshimitsu Higashi
TKToyokazu Kobayashi
Toyokazu Kobayashi
KTKosuke Taneda
Kosuke Taneda
JRJose Ildefonso Rubrico
Jose Ildefonso Rubrico
JOJun Ota
Jun Ota
This study addresses the challenging problem of efficient buffer allocation in production lines. Suitable locations for buffer allocation are determined to satisfy the desired throughput, while a suitable balance between solution quality and computation time is achieved. A throughput calculation approach that yields the state probability of production lines is adopted to evaluate the effectiveness of candidate buffer allocation solutions. To generate candidate buffer allocation solutions, an active probability index based on state probability is proposed to rapidly detect suitable locations of buffer allocations. A variable neighborhood search algorithm is used to maintain acceptable solution quality; an additional neighborhood structure is used in the case where no satisfactory solution is generated in the initial neighborhood structure. Extensive numerical experiments demonstrate the efficacy of the proposed approach. The proposed approach can facilitate agile design of production lines in industry by rapidly estimating production line topologies.