Dawei Hu

Dawei Hu


Research Focus & Metrics

Academic Career Length

18Years (2009-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
24 August 2020 in IEEE Access
Verified
Journal Article
Open access
QSQian Sun
Qian Sun
Steven ChienSteven Chien
Steven Chien
DHDawei Hu
Dawei Hu
Gang ChenGang Chen
Gang Chen
RJRui-Sen Jiang
Rui-Sen Jiang
The customized bus (CB) transit is recognized as an effective transportation mode offering more flexible and demand-responsive service than traditional bus transit with fixed route and schedule, especially during the peak hours. The novelty of this study is the development of a mixed integer non-linear model for optimizing multi-terminal CB service in an urban setting. According to the estimated spatiotemporal passenger demand, the objective total cost, consisting of supplier’s and users’ costs, is minimized subject to capacity and time window constraints. A mixed bus fleet with various bus sizes is employed to accommodate passenger demand, which increases vehicle utilization and reduces supplier’s cost. The inconvenience of passengers caused by early arrival at the destination is treated as penalty and considered in users’ cost. The study optimization problem is combinatorial with many decision variables including trip assignment, bus routing and associated timetables, and fleet size. A hybrid genetic algorithm (HGA) which integrates the features of genetic algorithm (GA) and simulated annealing (SA) is developed to effectively search for the optimal solution. A real-world CB network is employed to demonstrate the applicability of the developed model and explore the relation between the model parameters and optimized results. It was found that the total cost can be reduced by 16.5% after employing multiple terminals and a mixed bus fleet.

29 October 2020 in Sustainability
Verified
Journal Article
Open access
PDF file
Gang ChenGang Chen
Gang Chen
DHDawei Hu
Dawei Hu
Steven ChienSteven Chien
Steven Chien
LGLei Guo
Lei Guo
MLMingzheng Liu
Mingzheng Liu
Electrifying bus transit has been deemed as an effective way to reduce the emissions of transit vehicles. However, some concerns about on-board battery hinder its further development. Recently, dynamic wireless power transfer (DWPT) technologies have been developed, which enable buses to charge in-motion and overcome the drawback (short service range) with opportunity charging. This paper proposes a mathematic model which optimizes the locations for DWPT devices deployed at stops and size of battery capacity for battery electric buses (BEB) in a multi-route network, which considers the battery’s service life, depth of discharge and weight. A tangible solution algorithm based on a genetic algorithm (GA) is developed to find the optimal solution. A case study based on the bus network from Xi’an China is conducted to investigate the relationship among optimized costs, greenhouse gas (GHG) emissions, battery service life, size of the battery capacity and the number of DWPT devices. The results demonstrated that a bus network powered by DWPT shows better performance in both costs (a 43.3% reduction) and emissions (a 14.4% reduction) compared to that with stationary charging at bus terminals.

2 April 2020 in IEEE Access
Verified
Journal Article
Open access
Gang ChenGang Chen
Gang Chen
DHDawei Hu
Dawei Hu
SCSteven Chien
Steven Chien
The technology of dynamic wireless power transfer (DWPT) has been recognized as an effective way to recharge battery electric bus and overcome some drawbacks (e.g. high battery cost and limited service range) with opportunity charging. This study develops a mixed integer non-linear model to optimize a feeder bus transit powered by DWPT. The decision variables consist of bus route networks, service frequency, locations of DWPT devices and battery capacity. The objective is to minimize total cost, including the costs of charging devices, battery, operation and travel time. A tangible nested genetic algorithm (NGA) is developed to find the optimal solution. The computational efficiency of NGA is demonstrated through numerical comparisons to the solutions founded by LINGO and GA. It was found that with NGA the solution converges to an acceptable level faster than using LINGO and GA. A real-world bus network is employed to explore the relation between the minimized costs and decision variables. The result suggested that DWPT outperforms terminal charging technology in terms of the least total cost, and that the yielded total infrastructure cost with DWPT is 16.6% less than that with terminal charging technology.

30 June 2022 in Chemosphere
Verified
Journal Article
Closed access
RJRuisen Jiang
Ruisen Jiang
Ye LiuYe Liu
Ye Liu
DHDawei Hu
Dawei Hu
LZLan Zhu
Lan Zhu

1 August 2022 in KSCE Journal of Civil Engineering
Verified
Journal Article
Open access
PDF file
XWXue Wu
Xue Wu
DHDawei Hu
Dawei Hu
BMBingshan Ma
Bingshan Ma
RJRuisen Jiang
Ruisen Jiang
Crowdshipping is a revolutionary concept of the sharing economy. In this study, two carriers are used to perform the following expedition: the truck starts from the depot to complete part of the deliveries, shares part of the load with the crowdshipper at the relay point, and the private driver selected as the crowdshipper continues from that point onward. This study proposes the two-echelon open vehicle routing problem with crowdshipping (2EOVRP-CS) and formulates a mathematical model to determine the crowdshipper, parcel relay location, truck route, and crowdsource route. A tangible nested genetic algorithm (NGA) is proposed, and its efficiency is demonstrated by comparison with CPLEX and genetic algorithm (GA). A real case study is investigated in Xi’an city to test the applicability of the proposed model. The results show that using crowdshipping instead of truck delivery alone can save approximately 14% of the total cost and 26% of truck vehicle miles traveled (VMT). Moreover, several sensitivity analyses are performed. The results show that crowdshipping is sensitive to the detour limit and the time value of carriers. For the detour limit, after the acceptable detour distance increases by 8%, the total cost can be reduced by up to 5.94%.

1 November 2013 in Procedia - Social and Behavioral Sciences
Verified
Journal Article
Open access
LCLi-Hong Chen
Li-Hong Chen
DHDawei Hu
Dawei Hu
TXTing Xu
Ting Xu
For different technical levels of highway freight terminal, you need to allocate the appropriate facilities (such as parking lots, warehouses, loading and unloading areas, roads) to complete the various operations of vehicle and goods in the stations. According to the demand of the facilities’ ratio in the current revision of “classification and construction requirement of highway freight terminal”, the paper uses the flexsim computer simulation technology combined with AutoCAD and 3dsMax design software to simulate the highway freight terminal. A simulation result is given of the area ratio of the different technical levels of highway freight terminal.Flexsim software is a typical integration between virtual reality technology and discrete object-oriented simulation. In order to make the software more suitable for the simulation model of highway freight terminal, this paper comprehensively analysis the mapping relationship of the road freight station facilities and various objects in the flexsim software. By using external drawing software to create 3D models imported into flexsim simulation software, and create highway freight terminal user object libraries in flexsim, such as: truck. This will enable more realistic simulation models of highway freight terminals. In this paper, on the basis of a comprehensive analysis of the simulation characteristics of the highway freight terminal and flexsim simulation methods, a typical road freight station is used for an example to establish the simulation models and give a simulation result of the area ratio of the different technical levels of highway freight terminal. Effective technical means to scientific decision-making for the road freight station planning and construction program are provided