Straightforward implementations of elastic reverse time migration (ERTM) often produce imaging artifacts associated with incorrectly imaged mode conversions, crosstalk, and back-scattered energies. To address these issues, we introduced three approaches: (1) vector-based normalized crosscorrelation imaging conditions (VBNICs), (2) directional separation of wavefields to remove low-wavenumber noise, and (3) postimaging filtering of the dip-angle gathers to eliminate the artifacts caused by nonphysical wave modes. These approaches are combined to create an effective ERTM workflow that can produce high-quality images. Numerical examples demonstrate that, first, VBNICs can produce correct polarities for PP/PS images and can compute migrated dip-angle gathers efficiently by using P/S decomposed Poynting vectors. Second, they achieve improved signal-to-noise and higher resolution when performing up/down decomposition before applying VBNICs, and left/right decomposition enhances steep dips imaging at the computational cost of adding the Hilbert transform to a spatial direction. Third, dip filtering using slope-consistency analysis attenuates the remaining artifacts effectively. An application of the SEG advanced modeling program (SEAM) model demonstrates that our ERTM workflow reduces noise and improves imaging ability for complex geologic areas.
The finite-difference (FD) scheme is extensively applied in seismic modelling, imaging and inversion due to its advantages of large-scale parallel computing and programming. However, numerical dispersion caused by using a difference operator in substitution for the differential operator is non-negligible, which reduces the accuracy of the modelling and can lead to some misinterpretations. In addition, the computing resources required by the FD scheme is highly demanding when dealing with large models, which limits its applicability. In this paper, a new optimised FD scheme is proposed, which is based on an improved particle swarm optimisation (PSO) algorithm. We improve the conventional PSO algorithm by introducing strategies related to local learning and global learning, which contribute to accelerating the convergence rate and effectively avoiding getting trapped in local extrema. Then, the improved PSO algorithm is used to improve the conventional FD scheme. Dispersion analysis and numerical modelling demonstrate that the low-order optimised FD scheme can achieve higher accuracy than a high-order conventional operator. Compared with the conventional FD scheme and a FD scheme based on the Remez exchange algorithm, the optimised FD scheme based on the improved PSO algorithm can more efficiently suppress numerical dispersion and increase computational efficiency.
In this work, we simplify a moving high-speed train as combination of a series of the axe loads from the front and rear bogies of cars. We build a simplified bridge pier model, as a result, train source expressions with cars moving on land and bridges are given respectively. Considering that the piers are inserted into the ground at a depth of a few tens meters and reach the bedrock. When the high-speed train passes the piers, the piers will appear oscillating motion which is subjugated by the ground, and this oscillating motion is relative to the microstructure interactions of subsoil and bedrock in the frame of the generalized continuum mechanics theory. Hence, we derive the elastic wave equations based on the modified couple stress theory to perform numerical modelling for a simplified bridge pier model under high-speed train passage over the bridge. Based on the wave equation and the train source expressions, a theoretical seismogram of a moving high-speed train with 16 cars on the bridge are obtained. Compared with the real data recorded when a high-speed train passed the piers in Dingxing County, some conclusions are drawn.