Savolainen Jyrki

Dr. Savolainen Jyrki

orcid

Research Focus & Metrics

Academic Career Length

11Years (2016-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
22 February 2021 in Journal of Intelligent Manufacturing
Verified
Journal Article
Open access
PDF file
SJSavolainen Jyrki
Savolainen Jyrki
MUMichele Urbani
Michele Urbani
Optimization of operations and maintenance (O&M) in the industry is a topic that has been largely studied in the literature. Many authors focused on reliability-based approaches to optimize O&M, but little attention has been given to study the influence of macroeconomic variables on the long-term maintenance policy. This work aims to optimize time-based maintenance (TBM) policy in the mining industry. The mine environment is reproduced employing a virtual model that resembles a digital twin (DT) of the system. The effect of maintenance decisions is replicated by a discrete event simulation (DES), whereas a model of the financial operability of the mine is realized through System Dynamics (SD). The simultaneous use of DES and the SD allows us to reproduce the environment with high-fidelity and to minimize the cost of O&M. The selected illustrative case example demonstrates that the proposed approach is feasible. The issues of using high dimensional simulation data from DT-models in managerial decision making is identified and discussed.

3 September 2021 in International Journal of Computer Integrated Manufacturing
Verified
Journal Article
Closed access
SJSavolainen Jyrki
Savolainen Jyrki
MKMikkel Stein Knudsen
Mikkel Stein Knudsen
This paper discusses the value proposition of a system-level Digital Twin (DT) in the context of complex manufacturing processes from the managerial perspective. The central promise of DT-technology is to use and iterate the available real-time process information in a simulation setting transforming it instantly to operational or managerial-level decision-making implications. Despite the clear potential of this emerging technology, a gap of knowledge exists on how such DT could be implemented and what would be its defining features. The key contribution of this research is to lay out the central discrepancies between the promise of digital twin technology vision versus what is possible within the limits of current industrial infrastructure in the short- and mid-term. This research builds on the currently existing scientific literature which we use to point out ten foundational issues of system-level digital twins that are analyzed and discussed in detail. As a conclusion, we propose that large system-level DT-projects have a managerial rationale only when several preliminary conditions are met and fulfilled.

10 November 2020 in Axioms
Verified
Journal Article
Open access
PDF file
Tommi HuotariTommi Huotari
Tommi Huotari
SJSavolainen Jyrki
Savolainen Jyrki
MCMikael Collan
Mikael Collan
This study investigated the performance of a trading agent based on a convolutional neural network model in portfolio management. The results showed that with real-world data the agent could produce relevant trading results, while the agent’s behavior corresponded to that of a high-risk taker. The data used were wide in comparison with earlier reported research and was based on the full set of the S&P 500 stock data for twenty-one years supplemented with selected financial ratios. The results presented are new in terms of the size of the data set used and with regards to the model used. The results provide direction and offer insight into how deep learning methods may be used in constructing automatic trading systems.

31 March 2016 in The Engineering Economist
Verified
Journal Article
Closed access
SJSavolainen Jyrki
Savolainen Jyrki
MCMikael Collan
Mikael Collan
PLPasi Luukka
Pasi Luukka
This article presents a detailed system dynamic (SD) model of a metal mining investment that is usable in ex-ante profitability and operations management analysis. We show how the SD model can be used to analyze the profitability effect of three operational real options: the option to temporarily close production, the option to abandon production, and the option to increase production through cutoff grade change. The SD model allows for intuitive modeling of the multiple interactive real options and arriving at results that are difficult, or impossible, to reach with commonly used spreadsheet software. We also analyze the effect of mining project debt ratio to the project value and show that correctly choosing the debt ratio affects project profitability. The effect on the project value of using three different future metal price scenarios with two different stochastic processes is illustrated to highlight the importance of correct process selection in modeling future metal price paths. A realistic case of a high-cost nickel (Ni) metal mine is used as a basis for the presented numerical illustration of the model.

11 January 2022 in Mineral Economics
Verified
Journal Article
Open access
PDF file
SJSavolainen Jyrki
Savolainen Jyrki
RRRamin Rakhsha
Ramin Rakhsha
RDRichard Durham
Richard Durham
Price uncertainty is one of the major uncertainties in the life of mine (LOM) planning process which can have a decisive effect on the overall profitability. Today’s mine planning software tools provide block-sequencing optimisation for a given static price assumption that is then used as a basis of managerial decision-making process. This paper proposes a complementary approach to this by introducing a simulation-based decision-making tool that, with the help of simulation, seeks for the optimal mine plan when a managerially estimated price development with minimum and maximum boundaries is used as a data input for the given period. To demonstrate the approach, a realistic gold mine case study is presented with five alternative and technically feasible mine plans calculated in a static optimiser from a commercial mine planning software package. These mine planning scenarios are then subjected to price uncertainty in simulation with and without a price trend assumption to highlight the effect of price on the mine’s expected performance. Based on the results, we derive and demonstrate a simulation-based system that automates the matching of optimal mine plan with the managerial insight of long-term price development.

7 December 2021 in Sustainability
Verified
Journal Article
Open access
PDF file
MLMaria Luts
Maria Luts
SJSavolainen Jyrki
Savolainen Jyrki
MCMikael Collan
Mikael Collan
The fight against a climate crisis has urged nations and the global community to cut emissions and to define ambitious environmental goals. This has highlighted the importance of the renewable energy (RE) industry. Germany has been one of the most active countries in RE adoption. In this vein, the purpose of this research is to study and identify key profitability determinants of unlisted German electricity-producing RE-companies, many of which have been supported by the German Feed-in Tariff (FIT). A multi-year analysis based on panel data from 783 companies for the years 2010–2018 is used. The results show that both company- and industry-specific profitability determinants are statistically significant, but the company-specific determinants seem to be more important. The results shed new light on what drives the profitability of private German RE companies during the period of financial aid from the government and are of use to managers, regulators and investors alike, e.g., when the effects of different regulatory climates and industry environments, as well as states of business life cycle are considered. Furthermore, the implications of this study have wider environmental and economic importance as the performance of the RE companies is critical in achieving the emission targets of the energy industry and ensuring a more sustainable energy production for the future.