Bridges are special infrastructures that emit large amounts of carbon dioxide from construction. Attention should be given to the carbon cost generated by the bridge, which includes its direct economic cost; the carbon cost is the largest driving force encouraging the enterprise to implement carbon emission reduction measures. In this study, the life cycle assessment (LCA) method is applied to carbon emissions in the bridge construction stage, which include emissions from material production, transportation and on-site construction; then, a carbon emission calculation model for the construction stage is established. Next, the carbon cost calculation model for the bridge in the construction stage is determined by combining the carbon pricing mechanisms of carbon emission taxing and trading to monetize carbon emissions. Finally, by taking a bridge in Beijing as an example, the carbon emissions in the bridge construction stage are calculated, and the carbon cost is calculated. The results show that carbon emission monetization is beneficial for clarifying the environmental impact of bridge construction; these calculations should be included in cost accounting.
Active power instability during the power regulation process is a problem that affects the operation security of hydropower stations and the power grid. This paper focuses on the dynamic response to power regulation of a hydro-turbine governor in the power control mode. Firstly, the mathematical model for the hydro-turbine governing system connected to the power grid is established. Then, considering the effect of water hammer and the guide vane operating speed on power oscillation and reverse power regulation, a novel control strategy based on the S-curve acceleration and deceleration control algorithm (S-curve control algorithm) is proposed to improve power regulation. Furthermore, we carried out field tests in a real hydropower station in order to compare the regulation quality of the novel control strategy based on the S-curve control algorithm with the traditional linear control strategy. Finally, the obtained results show that the proposed optimal control strategy for the hydro-turbine governor improves the stability of power regulation by effectively suppressing reverse power regulation and overshoot. This study provides a good solution for the instability of power and reverse power regulation during the regulation process of the hydro-turbine governor in the power control mode.
With the rapid development of wind and photovoltaic power generation, hydro-turbine generator units have to operate in a challenging way, resulting in obvious vibration problems. Because of the significant impact of vibration on safety and economical operation, it is of great significance to study the causal relationship between vibration and other variables. The complexity of the hydro-turbine generator unit makes it difficult to analyze the causality of the mechanism. This paper studied the correlation based on a data-driven method, then transformed the correlation into causality based on the mechanism. In terms of correlation, traditional research only judges whether there is a correlation between all data. When the data with correlation are interfered with by the data without correlation, the traditional methods cannot accurately identify the correlation. A piecewise correlation method based on change point detection was proposed to fill this research gap. The proposed method segmented time series pairs, then analyzed the correlation between subsequences. The causality between power load and vibration of a hydro-turbine generator unit was further analyzed. It indicated that when the power load is less than 200 MW, the causality is weak, and when the power load is greater than 375 MW, the causality is strong. The results show that the causality between vibration and power load is not fixed but piecewise. Furthermore, the piecewise correlation method compensated for the limitation of high variance of the maximum information coefficient.