The integration of full converter-based wind power generation (FCWG, e.g. permanent magnet synchronous generator (PMSG)) not only introduces the PMSG oscillation modes (POMs) but also might excite severe resonances with electromechanical oscillation modes (EOMs) of the power system. In this paper, a two-open-loop-subsystem dynamic model is firstly established to investigate the interactions between the PMSG and the rest of the power system. On this basis, a modal shift evaluation (MSE) method by using bilateral damping torque analysis is proposed to accurately quantify the interaction effect of POMs and EOMs on each other and effectively explain their complex interaction process. Then two important concepts, i.e., modal shift sensitivity (MSS) with respect to various PMSG controller parameters and resonance excitation index (REI) according to a per unit open-loop modal distance indicating the intensity of modal interactions, are derived to dig the essential modal resonance mechanisms. Furthermore, by using MSS and REI as two tools, the modal interaction optimization (MIO) is conducted through POM tuning in order to prevent potential system modal resonance and enhance resonance mode damping for the first time. The optimized modal interaction is validated to be beneficial and effective for the improvement of power system resonance stability.
Power system scheduling mainly concerns economic optimization issues of the power system, which is also commonly known as the unit commitment (UC) problem. However, improper planning in the generation schedule may pose a negative impact on power system stability. Additionally, the trend of large-scale integration of renewable energy in the future power system brings critical challenges to power system stability. In consequence, it is necessary to integrate the stability constraints into power system scheduling. According to the classic classification of power system stability (i.e. voltage stability, frequency stability, and rotor angle stability), stability constraints can be constructed accordingly to guarantee system stability when solving UC problems, which ensures both the economic efficiency and technical feasibility of the UC solutions. This paper reviews typical stability constraints and how to apply these constraints in solving UC problems. Representative works are summarized to provide a guidance on addressing the stability constrained scheduling problems in the future power system operation.