Sung Ki Kim

Prof. Sung Ki Kim


Research Focus & Metrics

Academic Career Length

18Years (2009-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
18 August 2015 in Energies
Verified
Journal Article
Open access
PDF file
SKSung Ki Kim
Sung Ki Kim
WKWonil Ko
Wonil Ko
SBSungsig Bang
Sungsig Bang
Pyroprocessing, which is a dry recycling method, converts spent nuclear fuel into U (Uranium)/TRU (TRansUranium) metal ingots in a high-temperature molten salt phase. This paper provides the unit process cost of a pyroprocess facility that can process up to 10 tons of pyroprocessing product per year by utilizing the process costing method. Toward this end, the pyroprocess was classified into four kinds of unit processes: pretreatment, electrochemical reduction, electrorefining and electrowinning. The unit process cost was calculated by classifying the cost consumed at each process into raw material and conversion costs. The unit process costs of the pretreatment, electrochemical reduction, electrorefining and electrowinning were calculated as 195 US$/kgU-TRU, 310 US$/kgU-TRU, 215 US$/kgU-TRU and 231 US$/kgU-TRU, respectively. Finally the total pyroprocess cost was calculated as 951 US$/kgU-TRU. In addition, the cost driver for the raw material cost was identified as the cost for Li3PO4, needed for the LiCl-KCl purification process, and platinum as an anode electrode in the electrochemical reduction process.

25 August 2017 in Sustainability
Verified
Journal Article
Open access
PDF file
SKSung Ki Kim
Sung Ki Kim
HJHong Jang
Hong Jang
RGRuxing Gao
Ruxing Gao
CKChul Min Kim
Chul Min Kim
YCYanghon Chung
Yanghon Chung
SBSungsig Bang
Sungsig Bang
The purpose of this paper is to recommend a break-even point for the capital investment cost for a Sodium-cooled Fast Reactor (SFR) when choosing between a Pyro-SFR nuclear fuel cycle (recycling option via Pyro-processing) and a direct disposal option. This is because the selection of an alternative cannot be justified without a guarantee of economic feasibility. The calculation of a break-even point is necessary because SFR capital investment cost makes up the largest share of the cost for electricity generation. In other words, the cost of capital investment is an important cost driver, and the one that exerts the greatest effect on Pyro-SFR nuclear fuel cycle economics. In the end, the break-even point of the SFR capital investment cost between the Pyro-SFR nuclear fuel cycle and the direct disposal was calculated to be 4284 US$/kWe. In other words, it is possible to claim that the potential for the economic viability of the Pyro-SFR nuclear fuel cycle is greater (compared to investing in direct disposal) when the SFR capital investment cost is 4284 US$/kWe or less. In addition, Pyro-SFR technology will enable sustainable nuclear power generation.

12 July 2021 in Sustainability
Verified
Journal Article
Open access
PDF file
SKSung Ki Kim
Sung Ki Kim
JKJin-Seop Kim
Jin-Seop Kim
DCDongkeun Cho
Dongkeun Cho
SBSungsig Bang
Sungsig Bang
The purpose of this study is to compare the economic viability of direct disposal and pyroprocessing. This is because the selection of an alternative cannot be justified without a guarantee of economic feasibility. This paper sets the KRS (Korea Reference System) spent fuel repository and KAPF+ (Korea Advanced Pyroprocess Facility plus) as the cost objects, administers a cost-benefit analysis, and presents the results on the net cost. The results of the calculation demonstrate that the net costs of direct disposal and pyroprocessing are USD 17,719,319,040 and USD 19,329,252,755, respectively. The difference in the net cost for the two alternatives is thus not insignificant. However, the economic viability of direct disposal was found to be superior compared to that of pyroprocessing. In the end, it was found that the operating and maintenance cost of a pyroprocessing facility is comparatively high. Accordingly, direct disposal costs less than pyroprocessing. The direct disposal option is advantageous in terms of economical nuclear power sustainability.

1 January 2013 in Science and Technology of Nuclear Installations
Verified
Journal Article
Open access
PDF file
SKSung Ki Kim
Sung Ki Kim
WKW. I. Ko
W. I. Ko
YLYoon Hee Lee
Yoon Hee Lee
This paper evaluates whether SFR metallic nuclear fuel can be economical. To make this determination, the cost of SFCF (SFR fuel cycle facilities) was estimated, and the break-even point of the manufacturing cost of SFR metallic nuclear fuel for direct disposal option was then calculated. As a result of the cost estimation, the levelized unit cost (LUC) for SFCF was calculated to be 5,311 $/kgHM, and the break-even point was calculated to be $5,267/kgHM. Therefore, the cost difference between LUC and the break-even point is not only small but is also within the relevant range of the uncertainty level of Class 3 in accordance with a generic cost estimate classification matrix of AACE (the Association for the Advancement of Cost Engineering). This means it is very difficult to judge the economical feasibility of SFR metallic nuclear fuel because as of today there are no commercial facilities in Korea or the world. The economic feasibility of SFR metallic nuclear fuel, however, will be enhanced if the mass production of SFCF becomes possible in the future.

30 September 2009 in Progress in Nuclear Energy
Verified
Journal Article
Closed access
SKSung Ki Kim
Sung Ki Kim
MLM.S. Lee
M.S. Lee
HCH.J. Choi
H.J. Choi
JCJ.W. Choi
J.W. Choi
SRShripad T. Revankar
Shripad T. Revankar

16 June 2021 in Energies
Verified
Journal Article
Open access
PDF file
SKSung Ki Kim
Sung Ki Kim
JKJin-Seop Kim
Jin-Seop Kim
DCDong-Keun Cho
Dong-Keun Cho
The Korean government is currently evaluating two alternatives, direct disposal and pyroprocessing, for the disposal of spent nuclear fuel. This paper presents the ranking results of comparing and evaluating direct disposal and pyro-SFR fuel cycle alternatives using multi-criteria decision-making methods such as AHP, TOPSIS, and PROMETHEE. In considering the various evaluation criteria involved in these two alternatives, we aimed to determine the optimal choice in terms of the economic and social conditions of Korea. The evaluation criteria considered were safety, resource availability, environmental impact, economics, nuclear proliferation resistance, and public acceptance. The results show that the pyro-SFR fuel cycle alternative is more advantageous than direct disposal in the AHP and TOPSIS methods, whereas direct disposal is more advantageous in the PROMETHEE method because the ranking is reversed. TOPSIS assigns the ideal value and the most negative value among the input values to each criterion as a parameter reflecting the concept of distance between the best alternative and the worst alternative. In contrast, the PROMETHEE method first selects the preference function including the preference threshold, and calculates the preferred outflow and the preferred inflow for the detailed evaluation indicators. Therefore, differences exist in the methodologies of multi-criteria decision making. Nonetheless, the analysis results of the back-end fuel cycle option can greatly contribute to establishing a nuclear policy for the back-end nuclear fuel cycle, and these efforts will enable sustainable nuclear power generation.