The loss of tropical forests has continued in recent decades despite wide recognition of their importance to maintaining biodiversity. Here, we examine the conversion of forests to pastures and coca crops (illicit activity) on the San Lucas Mountain Range, Colombia for 2002–2007 and 2007–2010. Land use maps and biophysical variables were used as inputs to generate land use and cover change (LUCC) models using the DINAMICA EGO software. These analyses revealed a dramatic acceleration of the pace of deforestation in the region, with rates of conversion from forest to pasture doubling from the first to the second period. Altitude, distance to other crops, and distance to rivers were the primary drivers of deforestation. The influence of these drivers, however, differed markedly depending on whether coca cultivation or pastures replaced forest. Conversion to coca was more probable farther from other crops and from settlements. In contrast, proximity to other crops and to settlements increased conversion to pasture. These relationships highlight the different roles of coca and pastures in forest loss, with coca tending to open up new forest frontiers, and pastures tending to consolidate agricultural expansion and urban influence. Large differences between LUCC processes for each period suggest highly dynamic changes, likely associated with shifting underlying causes of deforestation. These changes may relate to shifts in demand for illicit crops, land, or mining products; however, the data to test these hypotheses are currently lacking. More frequent and detailed monitoring is required to guide actions to decrease the loss of forest in this highly vulnerable biodiversity hotspot in the Northern Andes.
1 September 2016 in Journal of Loss Prevention in the Process Industries
Pillar replacement in mining works is a technique of using the pillars that are part of the support structures having a high degree of mineralization, which attracts economic interest. The technique consists of replacing the support pillars of the mineral matrix that contain appreciable and beneficial quantities of mineral by artificial pillars that provide geomechanical structure to the operations, generating support and safety benefits greater than or equal to those provided by the original pillars and thus maximizing the intrinsic economic value of the available rock in the operation. Based on the literature regarding design techniques for the assembly of pillars used in underground gold mining, daily and continuous field inspections were conducted for two months, taking the necessary data for the proposed design following ISRM standards for data collection. The proposed pillars must consider a set of operational economic requirements and meet the geomechanical performance required to guarantee the safety and stability of the site. The design consisted of a combination of two types of pillars, one of concrete and one of mesh, cables and sterile material (granodiorite and dyke). The measurements consisted of RMR determination, the dimensions of the current pillars, and the geomechanical condition using detailed scanlines. Subsequently, the information was refined and correlated, and the degree of fracture and safety factor of the original pillars versus those proposed in the new designs were calculated. As a result, the optimal design for the construction of the replacement pillars should have dimensions of 2 x 1.7 x 1.7 meters, achieving a safety factor of 1.36, complying with the geomechanical requirements of safety and stability and yielding a profit of 405 % as a cost-benefit ratio in replacing the original pillars by those proposed in the design; the sterile material and mesh pillars would have dimensions of 2 x 2 x 2 meters.