Labor productivity in construction has fallen behind other industries in most of the world and has declined continuously for decades in the United States. To change this, the construction industry needs to know where to focus. This research aims to show how important craftsmen efficiency is for national construction labor productivity (CLP) development. Statistical analysis was used to compare craftsmen efficiency and CLP data from North America (NA) in the period 1972–2010. Craftsmen efficiency data were extracted from published work that measured direct work (DW) through work sampling, and CLP data were extracted from national databases. A statistically significant relationship between DW and CLP was established. This revealed that adding 36 s of DW to every work hour could yield a yearly return of 5.4 billion USD to the NA gross domestic product (GDP). Results show that more focus on activity and project level efficiency is crucial for changing the trends of national CLP. Industry leaders and policy makers now have a solid foundation for taking corrective actions for an industry plagued by low productivity.
1 November 2020 in Journal of Construction Engineering and Management
The focus of this study is the applicability of the Last Planner System (LPS) to modular offshore wind construction. Following a design science approach, a conceptual model for LPS adapted to modular offshore wind construction was developed, then refined and evaluated in a field study. The field study investigated was an offshore wind project in the Belgian part of the North Sea. Theoretical knowledge from academics as well as practical experience from field experts allowed adjusting LPS to the context of modular offshore wind construction. The case study organization participated in artifact development and evaluated its utility through implementation. Implementation of the developed artifact reduced the project duration by 21% compared to the as-planned original critical path method (CPM) schedule. Because offshore wind projects have tended to substantially overrun their scheduled durations, 21% may understate the actual improvement. Compared to current installation time within the industry, the project made a 36% reduction, measured by average installation time per megawatt. The developed LPS artifact contributes to the body of knowledge by adaptation of LPS to modular construction, and the evaluation shows its usefulness in the context of modular offshore wind construction.
2 January 2014 in International Journal of Construction Management
Construction sites are dominated by chaos and complexity, enforcing challenging conditions for establishing reliable and robust schedules that are easy to observe. The consequence is a large amount of delayed activities that again results in an unreliable schedule. Last planner system (LPS) was introduced as a production planning and control system to increase the reliability of scheduling task. By focusing on the removal of constraints, the LPS has successfully decreased the number of delayed activities. To further decrease delays, this research investigates the causes for delays at three construction cases. In total, 5424 scheduled activities were followed, whereof 1450 were delayed. The delayed activities were, besides the unidentified ones, categorized into 11 different categories and a statistical test of means was performed. The research revealed six often-occurring causes to delay: connecting work, change in work plans, workforce, external conditions, material and construction design. Furthermore, the study revealed five seldom-occurring causes to delay: space, equipment, rework, unexpected conditions, and safety. The findings have been structured in accordance to the preconditions used in the LPS theory. Therefore, the results can directly be applied to the making-ready process and used as guidance of where to intervene in attempt to reduce future delay.
1 January 2014 in International Journal of Project Organisation and Management
Scheduling of construction projects is by nature complex. The construction process is unreliable and difficult to forecast. Last planner system (LPS) is introduced in construction in order to achieve greater reliability and productivity in the process. To ensure that implementation is successfully anchored in the organisations, differences between theory and application are investigated. To determine the theoretically correct application a literature survey is conducted. A questionnaire survey is made to collect empirical date of the practical application. Comparison between theory and application revealed that often only parts of LPS are applied. A partly applied LPS can be a main barrier to increased reliability in the scheduling process. Furthermore, the questionnaire showed that failures in the execution processes often start in the look-ahead plan. Here, lacking knowledge of the execution process is causing problems to be overlooked. To increase the level of knowledge foremen should be involved in the look-ahead planning.
Purpose: User‐driven innovation (UDI) has been proven to successfully increase the value of products and services in single companies with direct linkages to the end‐user. The construction material industry often has no direct linkages to the end‐user, due to supply networks through builder merchants. Moreover, a lack of user knowledge is common in such networks, and companies rarely have explicit knowledge on how their products and services are in fact used and valued by their end‐users. Thus, it is clear that UDI is not directly applicable to the construction material industry without further developments. Hence, the purpose of this paper is to demonstrate that a network perspective is essential when adapting and implementing UDI in the construction material industry and to let the advantages of doing so surface.Design/methodology/approach: The research design includes a number of different approaches and types of interaction between the researchers and industry. Additionally, an extensive literature review on UDI is carried out to identify variables necessary for successful adaptation to a network perspective.Findings: The conclusion of this research validates that a network approach to adapting UDI in the construction material industry is a precondition for a successful innovation journey. In addition, it was concluded that by adapting the network perspective new value‐adding potentials became visible, which could have a huge impact on innovation, effectiveness, efficiency, etc. in the construction material industry.Originality/value: The paper adds to the body of knowledge on how to implement UDI in a supply network by developing a framework for such an innovation process. The framework has its outset in any given generic new product development model with a logical sequence of steps. However, the framework is further developed into defining the networks activities, the internal activities, and the user‐oriented activities needed.
For decades construction labour productivity has been stagnated or declining. Changing this issue requires new knowledge on the labour-intensive construction production system. The work sampling method was applied to collect data from three renovation construction production systems. It quantifies observations of on-site work and enables deep analyses of how time is used. The analysis revealed that the renovation projects had a baseline of value-adding-work (VAW) time on 29.5%. It further identified five system behaviours outlining how VAW and Non-Value-Adding work (NVAW) time behaves. The new knowledge of how both VAW and NVAW time behaves advances knowledge on how time is wasted in construction projects and opens new branches of future research. The findings are furthermore of potential use to industry professionals who work with process improvement in renovation projects because they provide, among others, answers to how targets can be defined for both VAW and NVAW.