Bjørn Andersen

Dr. Bjørn Andersen

Norwegian University of Science and Technology (NTNU)
orcid

Research Focus & Metrics

Academic Career Length

12Years (2015-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
23 April 2018 in International Journal of Managing Projects in Business
Verified
Journal Article
Closed access
Youcef J-T. ZIDANEYoucef J-T. ZIDANE
Youcef J-T. ZIDANE
Bjørn AndersenBjørn Andersen
Bjørn Andersen
Purpose: Projects often face delays and unnecessary use of time due to various factors and reasons, and hence suffer from unfavourable consequences. The purpose of this paper is to identify the universal delay factors from an intensive literature review, complemented by delay factors in major Norwegian construction projects based on empirical data.Design/methodology/approach: The study in which this paper is based includes an intensive literature review, and semi-quantitative open survey questionnaires. This paper addresses frequency and type of delay factors in construction projects, in Norway based on the survey, and worldwide based on the previous studies.Findings: From the study, the causes of delays facing the Norwegian construction industry are: poor planning and scheduling; slow/poor decision-making process; internal administrative procedures and bureaucracy within project organisations; resources shortage (human resources, machinery, equipment); poor communication and coordination between parties; slow quality inspection process of the completed work; design changes during construction/change orders; sponsor/owner/client lack of commitment and/or clear demands (goals and objectives); late/slow/incomplete/improper design; office issues; and users’ issues. And the top 10 universal delay factors are: design changes during construction/change orders; delays in payment of contractor(s); poor planning and scheduling; poor site management and supervision; incomplete or improper design; inadequate contractor experience/building methods and approaches; contractor’s financial difficulties; sponsor/owner/client’s financial difficulties; resources shortage (human resources, machinery, equipment); and poor labour productivity and shortage of skills.Research limitations/implications: When it comes to the identification of delay factors in major Norwegian projects, the research is based on a sample of 202 respondents from an open survey questionnaire. It should be noted that analysing a large population of respondents that have been asked open questions can be challenging due to the vague findings it might lead to. Also, when it comes to the identification of the universal delay factors, there were different methods used by different authors, within different context. Similar future studies in Norway based on qualitative and quantitative methods will give better verification for the findings.Practical implications: This paper has documented the critical delay factors/causes in Norway. The results of this study will help project managers, in Norway and elsewhere, to be aware and know about the potential causes of delay in their construction projects, which will help to identify the possible risks in the early phases of the project. Another practical implication is to make project managers and policy makers conscious that delays are quite universal, making it necessary to identify them as a first step.Social implications: The identification of delays factors and causes can permit projects to implement mitigation actions to avoid delays, thus allowing delivering schools, hospitals and other necessary infrastructure on schedule or ahead of schedule to society.Originality/value: This paper highlights most (almost all) of the studies in the literature, including to the study done in Norway, concerning the delay factors in construction projects and large construction projects in general. This wide review of relevant literature will save time other academicians from having to conduct similar studies. This study will assist both academic and professional experts providing more insight about the delay causes in large-scale construction projects.

16 November 2020 in Education Sciences
Verified
Journal Article
Open access
PDF file
Bertha Joseph NgerejaBertha Joseph Ngereja
Bertha Joseph Ngereja
Bassam HusseinBassam Hussein
Bassam Hussein
Bjørn AndersenBjørn Andersen
Bjørn Andersen
The purpose of the study on which this paper is based was to conduct a performance evaluation of student learning for an introductory course in project management in a higher educational institution in Norway. This was done by utilizing performance measurement philosophy to evaluate perceived student learning after a project-based assignment was applied as an instructional tool. The evaluation was conducted at the end of the semester to determine whether it facilitated learning effectiveness by providing an authentic learning experience. Relevant learning criteria were identified from existing literature and were measured by means of a questionnaire survey. Ten measurement scales were established using a 5-point Likert scale. The survey was then rolled out for the same subject for two consecutive semesters for just over 100 project management students. The results indicated that the incorporation of project-based assignments has a positive impact on student learning, motivation, and performance both in the short and long term. The study finally revealed that the incorporation of project-based assignments enables the creation of real-life experiences, which further stimulates the creation and development of real-life competencies.

16 March 2024 in Journal of Cleaner Production
Verified
Journal Article
Open access
ABAlessia Bellini
Alessia Bellini
Bjørn AndersenBjørn Andersen
Bjørn Andersen
NKNora Johanne Klungseth
Nora Johanne Klungseth
ATAllen Tadayon
Allen Tadayon

6 May 2019 in International Journal of Managing Projects in Business
Verified
Journal Article
Closed access
HHHaavard Haaskjold
Haavard Haaskjold
Bjørn AndersenBjørn Andersen
Bjørn Andersen
OLOla Lædre
Ola Lædre
WAWenche Aarseth
Wenche Aarseth
Purpose: Transaction costs in projects can be reduced through improved collaboration between contractors and clients. The purpose of this paper is to respond to the call for further research on the framework suggested by Li et al. (2015) who presented 26 factors that determine project transaction costs. The objective is to empirically test the framework to identify factors that have the greatest influence on project collaboration so that practitioners can prioritize their efforts on the most salient factors that will improve collaboration and reduce transaction costs. Design/methodology/approach: The paper employed interviews with 38 project practitioners from three different industries in Norway. The respondents had in average 20 years of professional experience. Findings: The quality of communication, project uncertainty, owner’s organizational efficiency, change orders and trust were the five most frequently found factors that influence both project transaction costs and collaboration level. When the authors compared findings between different industries the authors found that the quality of communication was important for all industries. The owner’s organizational efficiency was also highly important in oil and gas and ICT projects. Trust was particularly important in oil and gas projects while frequency of claims was particularly important in construction projects. Practical implications: This paper identifies the five most important factors for project practitioners to prioritize in order to reduce transaction costs through improved collaboration. Originality/value: The paper contributes to the conceptual theory of transaction costs and collaboration as it empirically tests and extends the framework developed by Li et al. (2015).

5 March 2018 in International Journal of Managing Projects in Business
Verified
Journal Article
Open access
GVGro Volden
Gro Volden
Bjørn AndersenBjørn Andersen
Bjørn Andersen
Purpose: The purpose of this paper is to study public project governance frameworks in various ministries and agencies in Norway, following the introduction of such a framework on the topmost level (i.e. the cabinet) which applies to the very largest projects. Design/methodology/approach: The study is methodologically designed as a qualitative assessment of project governance frameworks that apply to state-funded investment projects in selected sectors, based on data gathered through document reviews and interviews. Findings: The study finds that all of the agencies have introduced their own project governance frameworks, which are basically consistent with the recommendations from the project management literature and with the cabinet’s overall requirements in Norway. By contrast, only one ministry has taken a formalized role as a project owner. Governance tasks thus seem to be extensively delegated to the subordinate agencies. This even includes strategic tasks such as project selection and portfolio management, and implies there is a risk that public project governance has a narrow and internal focus. Originality/value: The paper is a first step toward a better understanding of public project governance as a hierarchical system and the relationship between project owners on three levels, the cabinet, the sectoral ministry, and the government agency.

15 April 2024 in Cleaner Environmental Systems
Verified
Journal Article
Open access
ABAlessia Bellini
Alessia Bellini
ATAllen Tadayon
Allen Tadayon
Bjørn AndersenBjørn Andersen
Bjørn Andersen
NKNora Johanne Klungseth
Nora Johanne Klungseth