Allen Tadayon

Dr. Allen Tadayon


Research Focus & Metrics

Academic Career Length

4Years (2023-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
16 March 2024 in Journal of Cleaner Production
Verified
Journal Article
Open access
ABAlessia Bellini
Alessia Bellini
Bjørn AndersenBjørn Andersen
Bjørn Andersen
NKNora Johanne Klungseth
Nora Johanne Klungseth
ATAllen Tadayon
Allen Tadayon

15 April 2024 in Cleaner Environmental Systems
Verified
Journal Article
Open access
ABAlessia Bellini
Alessia Bellini
ATAllen Tadayon
Allen Tadayon
Bjørn AndersenBjørn Andersen
Bjørn Andersen
NKNora Johanne Klungseth
Nora Johanne Klungseth

11 October 2023 in Buildings
Verified
Journal Article
Open access
PDF file
NMNadina Memic
Nadina Memic
ATAllen Tadayon
Allen Tadayon
Nils OlssonNils Olsson
Nils Olsson
PWPaulos A. Wondimu
Paulos A. Wondimu
Tausif Ahmed IshtiaqueTausif Ahmed Ishtiaque
Tausif Ahmed Ishtiaque
OLOla Lædre
Ola Lædre
The pre-construction phase of public infrastructure projects is characterized by significant uncertainty as crucial decisions are made with limited information. This early stage of project development is influenced by a multitude of factors and input from various stakeholders. While early contractor involvement (ECI) offers potential benefits for both clients and projects, the timing and selection of tasks for involving the contractor are critical to achieving these benefits. This study seeks to identify key pre-construction activities in public infrastructure projects and pinpoint the activities that stand to gain the most from ECI. The research methodology involved conducting semi-structured interviews, organizing seven workshops, and conducting the literature and document studies. Through these efforts, the study identified a total of 20 pre-construction activities, among which 5 activities emerged as the most favorable candidates for ECI, while 5 others were deemed less suitable. The findings underscore a consensus that involving contractor expertise during the Brief Development sub-phase holds significant promise. Notably, activities associated with planning, environmental considerations, and technical aspects related to the scope clarification, were found to be highly amenable to ECI. Activities addressing uncertainty management received particular attention, with clients valuing contractors’ practical experience in risk assessment and mitigation. Additionally, contractors’ insights into planning, activity dependencies, and their contributions to health, safety, and environmental plans were highly regarded. However, activities, categorized under the more technical sub-phases of Concept Development and Detailed Engineering yielded mixed results, while those falling within the predominantly social and political domain and involving political processes and societal impact, were viewed as less suitable for early contractor involvement. These findings emphasize the need to adopt a systematic and consistent approach to pre-construction activities, highlighting that ECI should not be applied as a one-size-fits-all solution. The interview results somewhat contrast with the literature findings, which indicate that the early conceptual phase is most beneficial as the contractor impact is highest. To some extent, the client, contractor, and consultant still see their benefit and strategy before the good of the project.

9 January 2025
Verified
Book Chapter
Open access
PDF file
IAIzma Ahmad
Izma Ahmad
KLKristine Lilleløkken
Kristine Lilleløkken
ZSZdravka Savcheva
Zdravka Savcheva
MSMakarena Saavedra
Makarena Saavedra
ATAllen Tadayon
Allen Tadayon
This study investigates the perspectives of engineers on sustainability. The intention is to get an insight on the position of sustainability in the construction industry in Norway. The method involved interviewing ten engineers within different fields of engineering and with varying levels of experience. The questions were regarding their understanding of sustainability, attitudes toward sustainable projects, and their views on sustainability in the construction industry. A diverse individual perspective, with a predominant focus on environmental aspects, was observed. Economic factors and government incentives played an important role in the individual’s sustainable choices. The participants emphasized reducing carbon footprint, energy-efficient buildings, and reuse of materials as important for a sustainable development. In order to achieve a more sustainable development, this report suggests stricter regulations and government incentives, in addition to clearer definitions and collaborative responsibility distributions.

19 December 2024 in Engineering, Construction and Architectural Management
Verified
Journal Article
Closed access
NMNadina Memić
Nadina Memić
ATAllen Tadayon
Allen Tadayon
TITausif Ahmed Ishtiaque
Tausif Ahmed Ishtiaque
OKOle Jonny Klakegg
Ole Jonny Klakegg
PWPaulos Abebe Wondimu
Paulos Abebe Wondimu
OLOla Lædre
Ola Lædre
Purpose: There is a general assumption that the early involvement of the contractor contributes to value in construction projects. While early contractor involvement (ECI) may improve the value, some studies identify challenges with ECI. This paper aims to identify the main parameters that can be used to determine the optimal time for contractor involvement and examine how these parameters can be used by clients to develop a systematic method for finding the optimal timing for involvement. Design/methodology/approach: Literature studies, interviews, workshops and focus-group meetings identified six main parameters essential for developing a method to determine the ideal timing for ECI. Findings: The six identified parameters are activity, complexity, criticality, technical competencies, relational competencies and uncertainty. These parameters can be used to identify the gap between the available competency in the project team and the needed competency to perform an activity. Originality/value: Although clients have ways to identify the optimal time for contractor involvement, these ways are mainly subjective and based on in-house practice. By evaluating these six parameters, a more systematic and objective method for early involvement can be developed.