Chi Zhang

Chi Zhang


Research Focus & Metrics

Academic Career Length

12Years (2015-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 April 2015 in European Journal of Operational Research
Verified
Journal Article
Closed access
CZChi Zhang
Chi Zhang
JRJosé Emmanuel Ramirez-Marquez
José Emmanuel Ramirez-Marquez
JWJianhui Wang
Jianhui Wang

1 November 2019 in Reliability Engineering & System Safety
Verified
Journal Article
Closed access
YLYulong Li
Yulong Li
CZChi Zhang
Chi Zhang
CJChuanzhou Jia
Chuanzhou Jia
XLXiaodong Li
Xiaodong Li
YZYimin Zhu
Yimin Zhu

5 December 2022 in Reliability Engineering & System Safety
Verified
Journal Article
Closed access
CJChuanzhou Jia
Chuanzhou Jia
CZChi Zhang
Chi Zhang
YLYan-Fu Li
Yan-Fu Li
QLQuan-Lin Li
Quan-Lin Li

5 September 2019 in IISE Transactions
Verified
Journal Article
Closed access
CJChuanzhou Jia
Chuanzhou Jia
CZChi Zhang
Chi Zhang
It is paramount to perform timely and appropriate maintenance actions on networked infrastructures, such as power transmission, transportation, telecommunications, and so forth, in order to ensure their reliability in satisfying the prescribed demand required by the economic development and social well-being of a society. For this purpose, the time of travelling between the components to be maintained needs to be considered, as the components of a real-world infrastructure are usually geographically widely distributed. To address this problem, we propose a holistic bi-objective optimization approach for the joint optimization of maintenance planning and workforce routing for a networked infrastructure, in order to determine a practical maintenance plan that can simultaneously maximize its reliability and minimize the incurred cost. To deal with the complexity of the proposed problem, we develop a Two-level Pareto Simulated Annealing algorithm to approximate the Pareto-optimal solutions of the proposed problem. Finally, two numerical examples are employed to illustrate the ability of the proposed approach in dealing with the maintenance optimization problem of a geographically distributed networked infrastructure.

1 August 2019 in Reliability Engineering & System Safety
Verified
Journal Article
Closed access
Huaxing ZhuHuaxing Zhu
Huaxing Zhu
CZChi Zhang
Chi Zhang

17 April 2019 in IEEE Transactions on Engineering Management
Verified
Journal Article
Closed access
KCKam Fu Cheong
Kam Fu Cheong
CZChi Zhang
Chi Zhang
YZYang Zhang
Yang Zhang
This paper studies the joint optimization of price and two-dimensional (2-D) warranty policy with limits of both warranty length and usage. For this purpose, in this paper, we first propose a new sales function to characterize the joint influence of price, warranty length, and usage limit on the sales rate while considering the influence of the heterogeneous customer usage rate. Then, we model the joint dynamic optimization of price and 2-D warranty policy as a nonlinear optimal control problem, and solve it via a numerical approach based on Pontryagin's maximum principle. We show that the proposed dynamic 2-D warranty policy can help achieve higher profits than the existing one-dimensional policies and static 2-D policy.