Yaowu Wu

Dr. Yaowu Wu

Huazhong University of Science and Technology, Wuhan, China

Research Focus & Metrics

Academic Career Length

13Years (2014-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
11 September 2019 in IEEE Transactions on Power Systems
Verified
Journal Article
Closed access
YWYongcan Wang
Yongcan Wang
SLSuhua Lou
Suhua Lou
Yaowu WuYaowu Wu
Yaowu Wu
SWShaorong Wang
Shaorong Wang
The rapid expansion of wind power has triggered significant wind curtailment because the power system lacks flexibility to deal with the uncertainty and variability of wind power. The operational flexibility of coal-fired power plants is limited by the minimum stable firing rate in the boiler. Steam extraction and thermal energy storage could enable power output adjustment without changing the firing rate in the boiler. Thus, retrofitting existing coal-fired power plants with steam extraction and thermal energy storage is a promising option to accommodate the high penetration of wind power in the power system, especially in coal-dominated power system. This study investigated the operational flexibility of coal-fired power plants retrofitted with steam extraction and thermal energy storage. First, a linear operation model is proposed for retrofitted coal-fired power plants considering new characteristics and technical constraints. Second, a simulation framework based on stochastic unit commitment and rolling economic dispatch is developed to explore the benefits of steam extraction and thermal energy storage in wind-integrated power systems. The simulation results on the modified IEEE 24-bus system demonstrate the effectiveness of retrofitting coal-fired power plants with steam extraction and thermal energy storage for mitigating wind curtailment.

12 August 2014 in IEEE Transactions on Power Systems
Verified
Journal Article
Closed access
SLSuhua Lou
Suhua Lou
SLSiyu Lu
Siyu Lu
Yaowu WuYaowu Wu
Yaowu Wu
DKDaniel S. Kirschen
Daniel S. Kirschen
Spinning reserve (SR) is one of the most important resources used by system operators to respond to unforeseen events. In a low-carbon economy mode, carbon capture plant is an important CO $_{2}$ abatement option and might constitute a significant proportion of the generation mix. Due to their potential flexibility, such plants might affect the requirement for SR. This paper describes a multi-period optimization model for coordinating the generation, carbon capture and SR provision. In turn, this model is used to optimize the SR requirements, with the objective of minimizing the overall cost. Since this objective function combines the generation production cost, the expected energy not supplied (EENS) cost, SR provision cost and the carbon emission cost, it is better suited to evaluate the SR requirements of power system with carbon capture plants. Numerical results based on a 26-unit test system show that the proposed model is effective and practical.

10 October 2019 in IET Generation, Transmission & Distribution
Verified
Journal Article
Open access
PDF file
YWYongcan Wang
Yongcan Wang
SLSuhua Lou
Suhua Lou
Yaowu WuYaowu Wu
Yaowu Wu
MLMengxuan Lv
Mengxuan Lv
SWShaorong Wang
Shaorong Wang
As one of the promising renewable energy technologies, wind power generation has developed rapidly over the last decade. However, the rapid growth of wind power resulted in significant wind curtailment due to transmission congestion and lack of flexible resources. Although energy storage is the most efficient way to increase the flexibility of the power system, large capacities of cost‐effective energy storage are not yet available today. Considering that coal‐fired power plants are still the dominant suppliers of electricity in many countries, it has a great potential to increase large amounts of flexibility by retrofitting the existing coal‐fired power plants. In this study, the coordinated planning model for transmission expansion and coal‐fired power plants flexibility retrofits is proposed to accommodate high penetration of wind power. Robust optimisation is employed to handle the uncertainties of peak load demand and wind power capacity, and the robust planning model is solved by nested column‐and‐constraint generation method. The validity of the proposed planning model is demonstrated using the modified IEEE 24‐bus test system and modified IEEE 118‐bus test system.

18 September 2019 in Energies
Verified
Journal Article
Open access
PDF file
QCQuanhui Che
Quanhui Che
SLSuhua Lou
Suhua Lou
Yaowu WuYaowu Wu
Yaowu Wu
XZXiangcheng Zhang
Xiangcheng Zhang
XWXuebin Wang
Xuebin Wang
With the grid-connected operation of large-scale wind farms, the contradiction between supply and demand of power systems is becoming more and more prominent. The introduction of multiple types of flexible resources provides a new technical means for improving the supply–demand matching relationship of system flexibility and promoting wind power consumption. In this paper, multi-type flexible resources made up of deep peak regulation of thermal units, demand response, and energy storage were utilized to alleviate the peak regulation pressure caused by large-scale wind power integration. Based on current thermal plant deep peak regulation technology, a three-phase peak regulation cost model of thermal power generation considering the low load fatigue life loss and oil injection cost of the unit was proposed. Additionally, from the perspective of supply–demand balance of power system flexibility, the flexibility margin index of a power system containing source-load-storage flexible resources was put forward to assess the contribution from each flexibility provider to system flexibility. Moreover, an optimal dispatching model of a multi-energy power system with large-scale wind power and multi-flexible resources was constructed, aimed at the lowest total dispatching cost of the whole scheduling period. Finally, the model proposed in this paper was validated by a modified RTS96 system, and the effects of different flexibility resources and wind power capacity on the optimal scheduling results were discussed.

11 October 2016 in Energies
Verified
Journal Article
Open access
PDF file
HLHui Li
Hui Li
GLGengyin Li
Gengyin Li
Yaowu WuYaowu Wu
Yaowu Wu
WZWang Zhidong
Wang Zhidong
JWJiaming Wang
Jiaming Wang
In the most current methods of probabilistic power system production simulation, the output characteristics of new energy power generation (NEPG) has not been comprehensively considered. In this paper, the power output characteristics of wind power generation and photovoltaic power generation are firstly analyzed based on statistical methods according to their historical operating data. Then the characteristic indexes and the filtering principle of the NEPG historical output scenarios are introduced with the confidence level, and the calculation model of NEPG’s credible capacity is proposed. Based on this, taking the minimum production costs or the best energy-saving and emission-reduction effect as the optimization objective, the power system operation model with large-scale integration of new energy power generation (NEPG) is established considering the power balance, the electricity balance and the peak balance. Besides, the constraints of the operating characteristics of different power generation types, the maintenance schedule, the load reservation, the emergency reservation, the water abandonment and the transmitting capacity between different areas are also considered. With the proposed power system operation model, the operation simulations are carried out based on the actual Northwest power grid of China, which resolves the new energy power accommodations considering different system operating conditions. The simulation results well verify the validity of the proposed power system operation model in the accommodation analysis for the power system which is penetrated with large scale NEPG.

20 July 2018 in Energies
Verified
Journal Article
Open access
PDF file
MLMengxuan Lv
Mengxuan Lv
SLSuhua Lou
Suhua Lou
Yaowu WuYaowu Wu
Yaowu Wu
MMMiao Miao
Miao Miao
Battery swap stations (BSSs) are of great importance as an energy supplement for electric vehicles (EVs). The batteries in these stations not only charge instantaneous energy from the grid (G2B) but also discharge stored energy to the grid (B2G). This bidirectional energy consuming scheme provides more flexibility to the grid operation options, and henceforth, may bring in new challenges to the systems as well. In the meanwhile, the carbon trading mechanisms for the low-carbon economy can also have impacts on the generation scheduling of the power system. Therefore, a unit commitment (UC) model of the power system with BSSs in the low-carbon economic background is proposed to coordinate the G2B/B2G process of BSSs. Our model weighted the carbon dioxide emission in the cost function and tightened the constraint set with BSSs limits and the carbon trading mechanism. Case studies on a 10-unit test system demonstrate the effectiveness of the proposed model.