This paper presents an experience in the design and implementation of the condition-monitoring system for the synchronous generators whose primary purpose is to record data for the identification of the capability limits of the P–Q diagram of three generators in hydro power-plant. Paper presents details about the monitoring system, the underlying theory of the identification of the synchronous generator model with a focus on the calculation of the capability limits in the P–Q diagram. Furthermore, a computationally efficient method for the representation of capability limits suitable for the implementation within the industrial automation and control system of the power-plant is described in detail. Finally, the capability diagrams for three generators were implemented in the power-plant supervisory control and data acquisition system (SCADA) system.
1 April 2018 in Tehnicki vjesnik - Technical Gazette
This paper presents a possibility of using enterprise resource planning (ERP) business software for alternative analysis of electrical machines, with SAP ERP as an example of such software. Method presented is valid for all kinds of...
1 August 2017 in Tehnicki vjesnik - Technical Gazette
U radu se razmatraju rizici pojave uzročnika paljenja unutar elektromotora u prostorima ugroženim eksplozivnom atmosferom. Istraživanje pojave uzročnika paljenja zbog oštećenja kaveza rotora asinkronog motora temeljni je dio ovog...
Electric vehicles, especially cars, have been in the spotlight for some time now. In the focus of environmentalists, engineers, users, media, etc. With the growth and advancement of the market for such vehicles, other electric vehicles are also focussing on. One of such vehicles is boats, particularly smaller boats up to 8–10 meters in length. Of course, the biggest problem here is charging. The general idea is to use battery modules that can be easily carried and enable hot swapping. This paper investigates scenarios and simulations of the control system for hot swapping of the battery module. Simulations of connection of two and three battery modules to parallel operation and current control are presented in this paper, as well as applied control rules.