YeEun Jang

Prof. Dr. YeEun Jang

orcid

Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
21 July 2022 in Buildings
Verified
Journal Article
Open access
PDF file
YJYeEun Jang
YeEun Jang
JLJae-Man Lee
Jae-Man Lee
Jeongwook SonJeongwook Son
Jeongwook Son
The off-site construction (OSC) method has attracted the interest of experts to resolve productivity stagnation and lack of skilled workforce and to reduce greenhouse gas emissions in the construction industry. Due to the unique characteristics of OSC projects, wherein building elements are produced in a factory, transported, and installed in the field, a management approach that differs from the management techniques of previous construction projects is required. Accordingly, with this study, we examined the characteristics of OSC projects and derived key management items through literature review, case analysis, and expert meetings to develop an integrated management system for OSC projects (OSC-IMS). The proposed system, OSC-IMS, integrates the entire supply chain of the OSC project. It includes the following functions: drawing management, scheduling and planning, site installation planning, production planning, production monitoring, shipping and transportation, delivery and inspection, site installation monitoring, and progress payment management. To verify the applicability and effectiveness of OSC-IMS, it was implemented in four projects. The application of the system to the case studies demonstrated the improvements in work efficiency and accuracy and decreased waste time in every work step. The findings indicate that the system can enhance project performance. This study contributes to the identification of the features and key elements of OSC management such that these factors can be linked with managing system development. This work describes the overall effect of the proposed system on real projects.

1 July 2023 in Journal of Management in Engineering
Verified
Journal Article
Closed access
SLSeungYeon Lee
SeungYeon Lee
YJYeEun Jang
YeEun Jang
JYJune-Seong Yi
June-Seong Yi
Jeongwook SonJeongwook Son
Jeongwook Son

30 September 2022 in Applied Sciences
Verified
Journal Article
Open access
PDF file
YJYeEun Jang
YeEun Jang
Jeongwook SonJeongwook Son
Jeongwook Son
JYJune-Seong Yi
June-Seong Yi
Offsite construction (OSC) is one of the alternative methods for the various challenges that the construction sector faces today. This study developed a management system based on building information modeling (BIM) to execute OSC projects successfully. Because OSC differs from the conventional onsite building method, the authors studied and analyzed several project cases and interviewed the participants and stakeholders. The OSC method has unique characteristics in the aspects of the projects’ location and time, production process, flow, method, facility, and environment. Moreover, before the system development, we analyzed the OSC project management, usability, and system requirements. These requirements were turned into a BIM-based system following a waterfall model, with six management menus: drawing, schedule, production, logistics, installation and progress monitoring, and progress payment. This study implemented each menu’s vital functions within the system more effectively due to the BIM-based technological features, such as object-oriented data processing, visualization, high interoperability, linkage, and integration. The developed system was applied to four projects. The test resulted in a streamlined work process, improved activity, and less input time and workload than in a non-BIM-based management environment. These findings indicated that the proposed BIM-based system enabled OSC project management to perform better.

1 April 2021 in Sustainability
Verified
Journal Article
Open access
PDF file
YJYeEun Jang
YeEun Jang
Jeongwook SonJeongwook Son
Jeongwook Son
JYJune-Seong Yi
June-Seong Yi
The purpose of this study is to classify the bid price volatility level with machine learning and parameters from bid documents as risk factors. To this end, we studied project-oriented risk factors affecting the bid price and pre-bid clarification document as the uncertainty of bid documents through preliminary research. The authors collected Caltrans’s bid summary and pre-bid clarification document from 2011–2018 as data samples. To train the classification model, the data were preprocessed to create a final dataset of 269 projects consisting of input and output parameters. The projects in which the bid inquiries were not resolved in the pre-bid clarification had higher bid averages and bid ranges than the risk-resolved projects. Besides this, regarding the two classification models with neural network (NN) algorithms, Model 2, which included the uncertainty in the bid documents as a parameter, predicted the bid average risk and bid range risk more accurately (52.5% and 72.5%, respectively) than Model 1 (26.4% and 23.3%, respectively). The accuracy of Model 2 was verified with 40 verification test datasets.

21 September 2022 in Buildings
Verified
Journal Article
Open access
PDF file
YJYeEun Jang
YeEun Jang
Jeongwook SonJeongwook Son
Jeongwook Son
Sungjoo HwangSungjoo Hwang
Sungjoo Hwang
There has been increasing interest in the off-site construction (OSC) method in response to issues such as stagnant labor productivity, shortage of skilled workers, challenging site management, heightened safety and health-related regulations, and the push for carbon neutrality. Although efficient performance of an OSC project requires development of management techniques, and application of a management system that reflects the characteristics of the OSC projects, related technologies remain in their infancy. In this study, targeting precast concrete (PC) construction, which is one of the representative construction types of the OSC method, we derive the characteristics of OSC project management in six aspects: production place and time, production process, production method of construction, production method, production entity and facilities, and production environment. Based on this result, we further derived the requirements for developing an OSC project management system. Furthermore, based on the derived requirements, we constructed a system development scenario for the establishment of an installation plan and shipment requests. The managerial characteristics and requirements of the OSC project, presented in this study, provide the theoretical basis for developing OSC project management techniques, as well as guidance for the development of the OSC project management system in the future.

24 December 2025 in Buildings
Verified
Journal Article
Open access
PDF file
YJYeEun Jang
YeEun Jang
JPJeongeun Park
Jeongeun Park
YKYeweon KIM
Yeweon KIM
KYKihyung Yu
Kihyung Yu
This study presents an integrated ex-post evaluation of a municipal window-retrofit program in Goyang, Republic of Korea (heating-dominated, Dwa). Using field surveys and pre- and post-utility bills for 36 dwellings, mainly pre-2000 low-rise reinforced-concrete buildings, we normalize climate with HDD and CDD and prices with CPI-deflated tariffs to isolate the intrinsic effect of window replacement. Area-normalized indicators (∆e, η, DPB, NPV, AC) were computed. Average annual savings were 30.2 kWh per m2 per year (η ≈ 16 percent), consisting of 10.6 kWh per m2 per year of gas and 19.6 kWh per m2 per year of electricity (n = 36). The median discounted payback was 7.0 years. Under a 50 percent subsidy, about 80 percent of projects recovered private investment within 15 years and showed positive NPV with a median of about USD 4944. The electricity-tariff multiplier had the largest influence on cash flows and payback. The median abatement cost was about USD 352 per tCO2-eq. A portfolio view indicates that prioritizing low-cost cases maximizes total abatement, and that higher-cost cases merit design or cost review. Using the first post-retrofit year 2023, portfolio abatement is about 623 tCO2-eq per year. The framework jointly normalizes climate and price effects and yields policy-relevant estimates for heating-dominated contexts.