Žanesa Ljevo

Dr. Žanesa Ljevo


Research Focus & Metrics

Academic Career Length

16Years (2011-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
11 December 2020 in Sustainability
Verified
Journal Article
Open access
PDF file
Sławomir WawakSławomir Wawak
Sławomir Wawak
ŽLŽanesa Ljevo
Žanesa Ljevo
Mladen VukomanovicMladen Vukomanovic
Mladen Vukomanovic
Project management frameworks describe the preferred approaches to project quality management, as well as applicable methods and tools. Despite this, quality problems in the construction project are still widespread. This study aimed to identify crucial quality-related factors in construction project management and find relations between them, to help researchers and project managers better respond to quality issues. A systematic literature review (SLR) was used to identify previous studies on quality-related factors. Literature review and further quantitative analysis revealed that quality-related factors are related to three categories: Quality of project process, quality of organisational processes, and quality of results (products), which together create the quality of the whole construction project. The results highlight quality-related factors (14 related to the quality of processes, 6 to quality of an organisation, and 13 to quality of products) that should be taken into account in further research, as well as planning and executing construction projects. Their inclusion at the planning stage should help project managers, sponsors, and steering committees avoid or minimise quality-related problems. Moreover, this study sheds an interesting light on quality. We found that the quality of processes and quality of an organisation has precedence over the final product quality. Based on the results of the study, structural equation modelling (SEM) was used to create a null model that will be the starting point for further research in the construction enterprises.

15 March 2023 in Sustainability
Verified
Journal Article
Open access
PDF file
AŠAmmar Šarić
Ammar Šarić
Suada SulejmanovicSuada Sulejmanovic
Suada Sulejmanovic
SASanjin Albinović
Sanjin Albinović
MPMirza Pozder
Mirza Pozder
ŽLŽanesa Ljevo
Žanesa Ljevo
Air pollution represents one of the most complex problems of humanity. Traffic contributes significantly to this by emitting large amounts of harmful gases. This problem is particularly pronounced at urban intersections due to frequent changes in vehicle movement dynamics. This paper primarily presents the influence of intersection geometry on pollutant emissions levels. In addition, the influence of various traffic policies promoting greater use of public transport and zero-emission vehicles is also examined. The research combines the field part of recording existing intersections in Sarajevo, Bosnia and Herzegovina with traffic microsimulation. Detailed data on vehicles’ movements were obtained by advanced video processing using the DataFromSky tool, while the PTV Vissim 2022 and Bosch ESTM (2022) software were used to simulate traffic and estimate emissions at geometrically different intersections. The results showed that, in saturated traffic conditions, signalized intersections cause up to 50% lower emissions compared with two-lane and turbo roundabouts and that the impact of the geometric change is more significant than the impact of zero-emission vehicles. In unsaturated conditions, the differences in emissions at different intersections are negligible, with the highest reductions in pollution achieved by using zero-emission vehicles.

1 June 2017 in Journal of the Croatian Association of Civil Engineers
Verified
Journal Article
Open access
PDF file
ŽLŽanesa Ljevo
Žanesa Ljevo
MVMladen Vukomanović
Mladen Vukomanović
NRNerman Rustempašić
Nerman Rustempašić
The study of key quality factors relating to construction project processes in Bosnia and Herzegovina and Croatia has revealed that these factors are not accepted similarly by investors, contractors/subcontractors and project managers/consultants/designers. The first four ranked factors are: coordination of participants, communication, expertise/ knowledge, and planning and control, with various priorities among the mentioned participants. The study has also revealed that the significance of individual quality factors differs during various phases of construction projects depending on differing management standpoints.

31 January 2018
Verified
Book Chapter
Closed access
PDF file
SDSaša Džumhur
Saša Džumhur
ŽLŽanesa Ljevo
Žanesa Ljevo
JMJasmina Marić
Jasmina Marić


17 May 2018
Verified
Conference Paper
Open access
SDSuada Džebo
Suada Džebo
ŽLŽanesa Ljevo
Žanesa Ljevo
Suada SulejmanovicSuada Sulejmanovic
Suada Sulejmanovic
CETRA 2018 - 5th International Conference on Road and Rail Infrastructure