The construction industry has mainly relied on financially focused performance measurements, and studies on performance measurement systems (PMSs) have been carried out at the project level. However, recently, the demand for performance evaluation and management at the company level has increased. A few previous efforts have aimed to develop a conceptual framework for company performance, but there have been few follow-up studies. From this perspective, we have developed an implementation model and practical methodology to measure and compare the performance of construction companies. First, our thorough qualitative and quantitative analysis was used to develop a set of indicators for performance measurement, and an analysis of the relative weightings of the indicators was carried out. Second, we calculated the performance score of construction companies using a study of 34 Korean construction companies. Finally, we carried out a performance evaluation and system analysis using the calculated performance ...
In modular construction—a type of industrialized construction—production planning is very important, as it is closely related to the project’s duration, quality, and sustainability. The constraints (production area, delivery due date) often differ for each project, yet production planning in modular construction has failed to change with the project characteristics. As a result, bottlenecks and construction delays are common problems seen in modular construction, which, in turn, decreases the production ratio, causing the production to be inefficient. To this end, this paper applied a prefabricated component in the modular production process. The paper developed a process analysis model considering constraint factors (production period, production area) to derive the optimal configuration of the prefabricated components in various alternatives. The developed analysis model was then applied to a virtual case to analyze the productivity improvement and select the optimal process. The optimal production process was derived by simulating the possible production planning within a limited production area and production timeline. The result of a simulation indicates that the production period has been halved by optimizing the process. Furthermore, by applying prefabricated components, the production efficiency was further increased because the existing linear production process’s bottleneck disappeared. The model is deemed to have the potential to optimize various production methods across production facilities or modular factories that simultaneously perform multiple projects.
1 November 2005 in Journal of Construction Engineering and Management
The most common cause of construction claims is delay. Moreover, delay claims are often extremely complex and difficult to resolve. For this reason, the construction industry requires an effective and reliable method for analyzing the causes and effects of construction delay. Presently, the methods of analysis in common use do not adequately account for several commonly encountered situations. As a result, project time extensions are often considered without rigorous analysis. Therefore the objective of this study is to propose and describe an effective and logical method for evaluating construction delays that adequately accounts for commonly encountered situations. To achieve this objective, the writers propose a new methodology called “delay analysis method using delay section” (DAMUDS) as a means of overcoming two limitations of existing methods: (1) inadequate accounting of concurrent delay and (2) inadequate accounting of time-shortened activities. The DAMUDS method builds upon the widely used method of contemporaneous period analysis. The writers’ points are illustrated through the use of an example case.
1 July 2004 in Journal of Computing in Civil Engineering
YEYoungsoo Jung, A.M.ASCE1; Sangyoon Chin, M.ASCE2; and Kyungrai Kim, A.M.ASCE31Associate Professor, College of Architecture, CAUD, Myongji Univ., Yongin 449-728, South Korea.2Associate Professor, Dept. of Architecture, Landscape Architecture, and Civil Eng
Youngsoo Jung, A.M.ASCE1; Sangyoon Chin, M.ASCE2; and Kyungrai Kim, A.M.ASCE31Associate Professor, College of Architecture, CAUD, Myongji Univ., Yongin 449-728, South Korea.2Associate Professor, Dept. of Architecture, Landscape Architecture, and Civil Eng
A.A.M.Asce
A.M.Asce
M.M.Asce
M.Asce
It is normally recognized that information systems (IS) in the construction industry have not been sufficiently used in the era of information. However, so far no serious comprehensive effort has been made to measure the degree of informatization at the industry level. In order to address this problem, in this paper we propose an informatization assessment methodology for the construction industry. An informatization index for the construction industry (IICI) is developed based on specifics of the construction industry. A survey using IICI was conducted among general contractors in Korea, and the results are analyzed in terms of the measure of assessment, IS phases, construction business functions, and size of the firm. It is found that the proposed methodology can provide meaningful indicators that can be used in quantitative comparative assessment from many different perspectives. Details and implications of the case study are briefly presented.
30 November 2011 in Korean Journal of Construction Engineering and Management