Iram Parvez

Ms. Iram Parvez


Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
7 January 2021 in Energies
Verified
Journal Article
Open access
PDF file
IPIram Parvez
Iram Parvez
Jianjian ShenJianjian Shen
Jianjian Shen
IHIshtiaq Hassan
Ishtiaq Hassan
NZNannan Zhang
Nannan Zhang
The thirst of the Earth for energy is lurching towards catastrophe in an era of increasing water shortage where most of the power plants are hydroelectric. The hydro-based power systems are facing challenges in determining day-ahead generation schedules of cascaded hydropower plants. The objective of the current study is to find a speedy and practical method for predicting and classifying the future schedules of hydropower plants in order to increase the overall efficiency of energy by utilizing the water of cascaded hydropower plants. This study is significant for water resource planners in the planning and management of reservoirs for generating energy. The proposed method consists of data mining techniques and approaches. The energy production relationship is first determined for upstream and downstream hydropower plants by using multiple linear regression. Then, a cluster analysis is used to find typical generation curves with the help of historical data. The decision tree algorithm C4.5, Iterative Dichotomiser 3-IV, improved C4.5 and Chi-Squared Automatic Interaction Detection are adopted to quickly predict generation schedules, and detailed comparison among different algorithms are made. The decision tree algorithms are solved using SIPINA software. Results show that the C4.5 algorithm is more feasible for rapidly generating the schedules of cascaded hydropower plants. This decision tree algorithm is helpful for the researchers to make fast decisions in order to enhance the energy production of cascaded hydropower plants. The major elements of this paper are challenges and solution of head sensitive hydropower plants, using the decision-making algorithms for producing the generation schedules, and comparing the generation from the proposed method with actual energy production.

6 July 2019 in Water
Verified
Journal Article
Open access
PDF file
IPIram Parvez
Iram Parvez
Jianjian ShenJianjian Shen
Jianjian Shen
Mehran KhanMehran Khan
Mehran Khan
Chuntian ChengChuntian Cheng
Chuntian Cheng
The hydro generation scheduling problem has a unit commitment sub-problem which deals with start-up/shut-down costs related hydropower units. Hydro power is the only renewable energy source for many countries, so there is a need to find better methods which give optimal hydro scheduling. In this paper, the different optimization techniques like lagrange relaxation, augmented lagrange relaxation, mixed integer programming methods, heuristic methods like genetic algorithm, fuzzy logics, nonlinear approach, stochastic programming and dynamic programming techniques are discussed. The lagrange relaxation approach deals with constraints of pumped storage hydro plants and gives efficient results. Dynamic programming handles simple constraints and it is easily adaptable but its major drawback is curse of dimensionality. However, the mixed integer nonlinear programming, mixed integer linear programming, sequential lagrange and non-linear approach deals with network constraints and head sensitive cascaded hydropower plants. The stochastic programming, fuzzy logics and simulated annealing is helpful in satisfying the ramping rate, spinning reserve and power balance constraints. Genetic algorithm has the ability to obtain the results in a short interval. Fuzzy logic never needs a mathematical formulation but it is very complex. Future work is also suggested.