Sara Ríos

Prof. Sara Ríos

Faculty of Electrical and Computer Engineering, ESPOL Polytechnic University, Campus Gustavo Galindo, Guayaquil 09-01-5863, Ecuador
orcid

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
13 January 2021 in Energies
Verified
Journal Article
Open access
PDF file
Sara RíosSara Ríos
Sara Ríos
DPDaniel Pagano
Daniel Pagano
Kevin LucasKevin Lucas
Kevin Lucas
Currently, high-performance power conversion requirements are of increasing interest in microgrid applications. In fact, isolated bidirectional dc-dc converters are widely used in modern dc distribution systems. The dual active bridge (DAB) dc-dc converter is identified as one of the most promising converter topology for the mentioned applications, due to its benefits of high power density, electrical isolation, bidirectional power flow, zero-voltage switching, and symmetrical structure. This study presents a power management control scheme in order to ensure the power balance of a dc microgrid in stand-alone operation, where the renewable energy source (RES) and the battery energy storage (BES) unit are interfaced by DAB converters. The power management algorithm, as introduced in this work, selects the proper operation of the RES system and BES system, based on load/generation power and state-of-charge of the battery conditions. Moreover, a nonlinear robust control strategy is proposed when the DAB converters are in voltage-mode-control in order to enhance the dynamic performance and robustness of the common dc-bus voltage, in addition to overcoming the instability problems that are caused by constant power loads and the dynamic interactions of power electronic converters. The simulation platform is developed in MATLAB/Simulink, where a photovoltaic system and battery system are selected as the typical RES and BES, respectively. Assessments on the performance of the proposed control scheme are conducted. Comparisons with the other control method are also provided.

25 August 2020 in IEEE Transactions on Power Electronics
Verified
Journal Article
Closed access
Kevin LucasKevin Lucas
Kevin Lucas
DPDaniel Pagano
Daniel Pagano
David Alejandro Vaca-BenavidesDavid Alejandro Vaca-Benavides
David Alejandro Vaca-Benavides
RGRonald Garcia-Arcos
Ronald Garcia-Arcos
ERErick Melo Rocha
Erick Melo Rocha
Sara RíosSara Ríos
Sara Ríos
This study presents the design and evaluation of robust controllers, based on linear programming, Kharitonov's theorem and Chebyshev's theorem, in order to enhance the performance of a typical structure of multi-stage converters present in direct current (dc) systems. In such electric power distribution systems, point-of-load converters act as a constant power load (CPL), which introduces a destabilizing nonlinear effects to their supply bus voltage. The multi-stage converter system uses a simplified scheme based on cascaded converter, which is comprised of two dc-dc buck converter in series connection. The robust controllers evaluated overcome the negative incremental impedance instability problem due to CPL, which causes a high risk of instability in interconnected converters. Thereby, the robust controllers evaluated ensure robust control performance and stability with a minor performance degradation compared to a conventional controller when the cascaded converter system is subjected to parametric uncertainties. The control methodologies evaluated are applied in both dc-dc buck converters. Assessments on the performance of the control methodologies evaluated are conducted. Experimental validations on a 150-W dc-dc cascaded converter system test board are carried out to verify the theoretical claims.

1 January 2020 in IFAC-PapersOnLine
Verified
Journal Article
Closed access
Kevin LucasKevin Lucas
Kevin Lucas
DPDaniel Pagano
Daniel Pagano
DPDouglas Plaza
Douglas Plaza
DVDavid Alejandro Vaca—Benavides
David Alejandro Vaca—Benavides
Sara RíosSara Ríos
Sara Ríos

1 January 2020 in IFAC-PapersOnLine
Verified
Journal Article
Closed access
Kevin LucasKevin Lucas
Kevin Lucas
DPDaniel Pagano
Daniel Pagano
DPDouglas Plaza
Douglas Plaza
DVDavid Alejandro Vaca—Benavides
David Alejandro Vaca—Benavides
Sara RíosSara Ríos
Sara Ríos

6 October 2021
Verified
Conference Paper
Closed access
SESanchez G. Elio
Sanchez G. Elio
Sara RíosSara Ríos
Sara Ríos
The demand and acceptance of photovoltaic (PV) plants have increased steadily in remote agricultural areas of Ecuador, and the design of solar-powered microgrids (MG) provides a solution on these remote sites. The present paper explains the design of a control system used in an MG, based on classical and advanced automatic control techniques, applied to a three-phase inverter connected to a solar array with an irradiance study of the area for its installation. In the first instance, mathematical modeling of the MG inverter is presented. Also, including the design of other electronic components, such as grid filters and a direct current voltage boost converter, to tune two types of controllers, based on digital control and model based predictive control (MBPC), to regulate the alternating voltage given by the MG. A comparative analysis of the performance of both controllers was done, using MATLAB/SIMULINK®, and it was shown that the advanced controller gave a faster response, a lower overvoltage in the MG, and a stabilization of voltage.

2 June 2026 in Solar
Verified
Journal Article
Open access
PDF file
ESElio Sánchez-Gutiérrez
Elio Sánchez-Gutiérrez
Sara RíosSara Ríos
Sara Ríos
Hydropower-dependent electricity systems, such as Ecuador’s, face critical supply disruptions during droughts: a vulnerability exemplified by the 2024 power outages. This study assesses the technical, economic and environmental feasibility of a 200.84 MWp grid-connected solar photovoltaic (PV) plant proposed for the Pacific Refinery site in Manabi, Ecuador, as a strategy to diversify the energy matrix and reduce hydrological risk. Using site-specific solar resource data (4.65 kWh/m2/day) and PVSyst simulations, the plant achieves an annual energy production of 295 GWh with a performance ratio (PR) of 85.3%. A discounted cash flow analysis over 25 years, assuming a 7% discount rate and an electricity price of 60 USD/MWh, yields a net present value (NPV) of 104.9 MUSD, an internal rate of return (IRR) of 62.2%, and a levelized cost of energy (LCOE) of 14.5 USD/MWh, well below current industrial tariffs in Ecuador. Sensitivity analysis confirms project viability under ±15% variations in investment cost, energy price, and solar resource. Over its lifetime, the plant avoids 1.83 Mt of CO2 emissions, supporting national decarbonization goals. The results demonstrate that large-scale PV deployment in high-radiation, low-latitude regions can be highly profitable and contribute to energy sovereignty in hydropower-dependent systems. Furthermore, this study provides a replicable model for repurposing unused industrial land for renewable energy generation, offering actionable insights for policymakers and investors in developing economies.