Song Guo

Dr. Song Guo

China University of Mining & Technology
orcid

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
16 May 2021 in Energy Sources, Part A: Recovery, Utilization, and Environmental Effects
Verified
Journal Article
Closed access
SGSong Guo
Song Guo
GGGuang Li Guo
Guang Li Guo
HLHuaizhan Li
Huaizhan Li
XYXiangsheng Yang
Xiangsheng Yang
Mining subsidence, as one of the most common geological hazards, bringing a massive threat to the new infrastructure in such a post-mining area. To evaluate the stability of a post-mining area transforming into an expressway site, a hybrid model based on the kernel principal components analysis (KPCA) and the fuzzy C-means clustering algorithm (FCM) was proposed by multi-attribute geo-mining variables. This study attempt to cover the inaccuracy clustering gap of conventional approaches with geo-mining stability influencing factors (SIFs), the model was established to cluster the status of a post-mining area with 9 geo-mining SIFs through 134 mined-out working panels of 6 collieries underneath the proposed Jining expressway site in Shandong province, eastern China. Taking the results of ground residual deformation calculated by the probability integration method (PIM) as a validation set, the prediction accuracy of the proposed KPCA-FCM model and conventional clustering approaches was compared. The major experimental results indicate that the maximum residual subsidence in the study area is 96 mm, after KPCA dimensionality reduction, the first four principal components of cumulative contribution rate were 83.83%, the external performance indicator Rand Index (RI) of the KPCA-FCM algorithm is 0.86, consistent with the actual status of the stability in the post-mining area. Overall, the performance of the proposed approach demonstrates the effectiveness of the stability evaluation in the post-mining area with multi-geo-mining SIFs and it is feasible to transform the post-mining area into the proposed expressway site.

30 October 2020
Verified
Conference Paper
Closed access
QCQiyuan Cai
Qiyuan Cai
YLYinan LI
Yinan LI
CLChangyong Lin
Changyong Lin
YLYuanfei Li
Yuanfei Li
KXKangli Xiang
Kangli Xiang
SGSong Guo
Song Guo
The security verification of distribution network is of great significance for the planning and operation of distribution network. The security region has higher advantages than the traditional N-1 check. Because the existing security region method only considers the medium voltage distribution system, this paper proposes a full voltage level distribution network security region model. Firstly, the definition of full voltage level security region and simulation verification method are introduced; secondly, the security region and security boundary models of three-level network and four-level network are established respectively; finally, the security region boundary is calculated and analyzed for an actual example, and the simulation image is compared with the theoretical image to verify the effectiveness of the method.

20 January 2021 in Sustainability
Verified
Journal Article
Open access
PDF file
SGSong Guo
Song Guo
GGGuangli Guo
Guangli Guo
XYXiangsheng Yang
Xiangsheng Yang
QDQiu Du
Qiu Du
To guarantee the stability of a building complex above a planned mining district with ultrasoft strata, strip mining technology (SMT) was applied to control the displacement and deformation caused by underground exploitation. This study attempts to design a reasonable pillar width to establish a stable pillar-support (PS) system composed of ground buildings with coal pillars underneath. Based on the stratigraphic structure of ultrasoft strata and in situ measurement data of mining subsidence monitoring, this study takes an ultrasoft strata colliery in western Henan province, central China, as an example to examine the technical and economical feasibility of the proposed PSsyst under two mining scenarios. The major results indicated that the initial design of pillar width would be 120 m under scenario 1, with expected damage of only 450 mm maximum subsidence predicted by probability integration method (PIM); while under scenario 2, the cost of compensation for buildings’ mining-induced damage would increase to CNY 61.31 million with an expected output of 7.629 million tons of raw coal. Moreover, the protection rate of the residential area in the proposed postmining area of scenario 1 can reach as much as 6.91% comparing to the fully mechanized coal winning technology in scenario 2. Overall, the proposed PSsyst will bring good benefits both economically and environmentally and should be worth promoting as a reference for similar geological and mining conditions in the future.