Roque Aguado

Dr. Roque Aguado

Instituto de Ciencia y Tecnología del carbono (INCAR), CSIC, Oviedo, Asturias, Spain
orcid

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications

1 January 2020 in Renewable Energy
Verified
Journal Article
Closed access
Roque AguadoRoque Aguado
Roque Aguado
MCManuel Cuevas
Manuel Cuevas
Luis Pérez-VillarejoLuis Pérez-Villarejo
Luis Pérez-Villarejo
MCMª Lourdes Martínez Cartas
Mª Lourdes Martínez Cartas
SSSebastián Sánchez
Sebastián Sánchez

20 May 2023 in Energy Conversion and Management
Verified
Journal Article
Open access
Roque AguadoRoque Aguado
Roque Aguado
ABAndrea Baccioli
Andrea Baccioli
Angelica LiponiAngelica Liponi
Angelica Liponi
David VeraDavid Vera
David Vera

12 January 2021 in Applied Sciences
Verified
Journal Article
Open access
PDF file
Roque AguadoRoque Aguado
Roque Aguado
David VeraDavid Vera
David Vera
Diego A. López-GarcíaDiego A. López-García
Diego A. López-García
Juan P. TorreglosaJuan P. Torreglosa
Juan P. Torreglosa
Francisco JuradoFrancisco Jurado
Francisco Jurado
This research work presents a techno-economic analysis of a biomass gasification plant fueled with residues from the olive oil and almond industries for combined heat and power generation in the agrifood sector. The experimental plant consists of a downdraft fixed bed gasifier, a producer gas cleaning and cooling system and a spark-ignition engine–generator set as a power generation unit, which generates about 10–12 kW of rated electric power. With an average consumption between 13–14 kg/h of exhausted olive pomace pellets as feedstock, the producer gas volumetric flow rate was 31 Nm3/h (vol. %: 19.2 H2, 12.9 CO, 1.9 CH4, 19.2 CO2, 46.7 N2). The average cold gas efficiency was nearly 63%. This work also addresses the characterization and potential application of the carbonaceous solid residue (biochar), discharged from the gasifier at 1.7 kg/h. Finally, an economic feasibility analysis was developed, wherein the payback period ranges between 5–9 years.


24 September 2024 in Applied Energy
Verified
Journal Article
Open access
DSDaniel Sánchez-Lozano
Daniel Sánchez-Lozano
Roque AguadoRoque Aguado
Roque Aguado
AÁAntonio Escámez Álvarez
Antonio Escámez Álvarez
AAAugustine Awaafo
Augustine Awaafo
Francisco JuradoFrancisco Jurado
Francisco Jurado
DVDavid Vera
David Vera