The Rędziński Bridge in Wrocław is the biggest Polish concrete cable-stayed bridge. It is equipped with a large structural health monitoring (SHM) system which has been collecting the measured data since the bridge opening in the year 2011. This paper presents a comparison between the measured data and the finite element method (FEM) calculations, while taking into account 7 years of data collection and analyses. The first part of this paper concerns the SHM application. In the next part, which contains comparisons between forces in cables and temperature changes throughout the structure, the measured data are presented. The third part includes SHM-based calculations and simulations with a complex FEM model to check the measured data and to estimate future measurements. The last part contains a durability assessment calculation for the cable stays.
2 December 2022 in Archives of Civil and Mechanical Engineering
The assessment of dynamic performance of large-scale bridges typically relies on the deployment of wired instrumentation systems requiring direct contact with the tested structures. This can obstruct their operation and create unnecessary risks to the involved personnel and equipment. These problems can be readily avoided by using non-contact instrumentation systems. However, the cost of off-the-shelf commercial products often prevents their wide adoption in engineering practice. To this end, the dynamic performance of the biggest one-pylon cable-stayed bridge in Poland is investigated based on data from a consumer-grade digital camera and open access image-processing algorithms. The quality of these data is benchmarked against data obtained from conventional wired accelerometers and a high-end commercial optical motion capture system. Operational modal analysis is conducted to extract modal damping, which has a potential to serve as an indicator of structural health. The dynamic properties of the bridge are evaluated against the results obtained during a proof loading exercise undertaken prior to the bridge opening. It is shown that a vibration monitoring system based on consumer-grade digital camera can indeed provide an economically viable alternative to monitoring the complex time-evolving dynamic behaviour patterns of large-scale bridges.
In this paper, dynamic analyses of two untypical, modern footbridges made of glued-laminated timber are presented. One of them is among the longest cable-stayed bridges for pedestrians in the world, made of such a structural material. Both structures are qualified as having low sensitivity to vibrations. The results of numerical modal analysis using FEM and non-destructive experimental dynamic tests of investigated footbridges are compared. Important differences in obtained results are captured, which are identified as the positive effect in relation to design aspects. Moreover, the same in situ measurements confirm the high level of damping in footbridges made of glued-laminated wood, which is a very significant and distinguishing feature not commonly recognized. The study also calls attention to the choice of timber as an advisable material for footbridges. This is not only because of environmentally friendly and aesthetic reasons, but also due to providing highly satisfying vibration comfort for pedestrians.
The vibration serviceability of footbridges has evolved from the adoption of a single pedestrian crossing in the resonance condition to load cases in which several pedestrians cross the structure simultaneously. However, in spite of this improvement, pedestrians continue to be considered as applied loads in codes of practice. Recent research has pointed out that modeling pedestrians as dynamic systems is a step further in the search for a more realistic design approach. This is explored in this paper, focusing on the case of vertical vibration. A two-span cable-stayed test structure was selected, and accelerations were measured from single and group crossings, both at the structure and at a pedestrian’s waist. Numerical simulations considering the pedestrians modeled as loads only and also as dynamic systems were implemented, and numerical and experimental time response vibration signatures were compared. Reductions of up to 25% and 20% in peak and RMS acceleration, respectively, were obtained when pedestrians were modeled as dynamic systems, in comparison with the less realistic model of pedestrians as loads only. Such reductions were shown to depend on the number of pedestrians involved in the group. The results, thus, highlight that pedestrian–structure interaction is an asset for the vibration serviceability design of footbridges.
The City of Wrocław has been surrounded by the highway bypass since the year 2011. There is a large cable-stayed bridge along that way across the Odra River including two main spans each 256 m long. The height of the pylon is 122 m. The deck is supported from 160 stays Freyssinet HD2000 type. Total quantity of steel in stays reached about 1500 tons. The installation of stay cables was arranged according to Freyssinet Isotension procedure, as well as the specialized equipment supplied by Freyssinet was widely used. Time period consumed for installation was extremely short, it lasted about two months. As the result a modern elegant bridge appeared enriching the landscape of Wrocław peripheries.