Damian Kasza

Dr. Damian Kasza

Wrocław University of Science and Technology (Poland)
orcid

Research Focus & Metrics

Academic Career Length

13Years (2014-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
19 October 2021 in Energies
Verified
Journal Article
Open access
PDF file
JWJaroslaw Wajs
Jaroslaw Wajs
PTPaweł Trybała
Paweł Trybała
JGJustyna Górniak-Zimroz
Justyna Górniak-Zimroz
JKJoanna Krupa-Kurzynowska
Joanna Krupa-Kurzynowska
Damian KaszaDamian Kasza
Damian Kasza
Mining industry faces new technological and economic challenges which need to be overcome in order to raise it to a new technological level in accordance with the ideas of Industry 4.0. Mining companies are searching for new possibilities of optimizing and automating processes, as well as for using digital technology and modern computer software to aid technological processes. Every stage of deposit management requires mining engineers, geologists, surveyors, and environment protection specialists who are involved in acquiring, storing, processing, and sharing data related to the parameters describing the deposit, its exploitation and the environment. These data include inter alia: geometries of the deposit, of the excavations, of the overburden and of the mined mineral, borders of the support pillars and of the buffer zones, mining advancements with respect to the set borders, effects of mining activities on the ground surface, documentation of landslide hazards and of the impact of mining operations on the selected elements of the environment. Therefore, over the life cycle of a deposit, modern digital technological solutions should be implemented in order to automate the processes of acquiring, sharing, processing and analyzing data related to deposit management. In accordance with this idea, the article describes the results of a measurement experiment performed in the Mikoszów open-pit granite mine (Lower Silesia, SW Poland) with the use of mobile LiDAR systems. The technology combines active sensors with automatic and global navigation system synchronized on a mobile platform in order to generate an accurate and precise geospatial 3D cloud of points.


1 September 2020 in Applied Radiation and Isotopes
Verified
Journal Article
Closed access
TPTadeusz Andrzej Przylibski
Tadeusz Andrzej Przylibski
MKMarek Kaczorowski
Marek Kaczorowski
LFLidia Fijałkowska-Lichwa
Lidia Fijałkowska-Lichwa
Damian KaszaDamian Kasza
Damian Kasza
RZRyszard Zdunek
Ryszard Zdunek
RWRoman Wronowski
Roman Wronowski

31 January 2018 in E3S Web of Conferences
Verified
Conference Paper
Open access
Damian KaszaDamian Kasza
Damian Kasza
AKAleksander Kowalski
Aleksander Kowalski
JWJurand Wojewoda
Jurand Wojewoda
MKMarek Kaczorowski
Marek Kaczorowski
Indicators of recent geodynamic activity in the Książ Castle area are registered by the measuring instruments of the SRC PAS (Space Research Centre of Polish Academy of Sciences) Geodynamic Laboratory at Książ. Over 40 years of continuous observations from quartz horizontal pendulums (since 1974) and over 10 years of observations from water-tube tiltmeters (since 2002) have documented irregularly repeatable strong signals related to the relative displacement of blocks in the rock substrate, on which Książ Castle is located. These signals have dip (rotational) and vertical strike-slip components. Also, the presence of a horizontal strike-slip component is evidenced by geometric anomalies (deformations) of the shape of the Pelcznica river valley, which directly correspond to the orientation of the main faults in the area. Recent geodynamic activity is documented by destruction of (the construction elements in the castle complex. Instrumental indicators of movement, geodetic measurements and structural analysis of the rock massif have allowed for constructing a model showing the main unconformity surfaces in the analysed rock massif. Sinistral, NE–SW and ENE–WSW-oriented strike-slip faults prevail in the laboratory corridors, along with perpendicular WNW–ESE and NW–SSE-oriented clextral and normal faults. Most dislocations are accompanied by zones of intense cataclasys, secondary silification, and Fe and Mn mineralization. Generally, the faults were formed due to reactivation of joint fractures cutting the steeply N-and S-dipping (at 75-90°) deposits of the Książ Conglomerate Formation.

31 January 2018 in E3S Web of Conferences
Verified
Conference Paper
Open access
WCWojciech Ciężkowski
Wojciech Ciężkowski
TGTadeusz Głowacki
Tadeusz Głowacki
KGKatarzyna K. Grudzińska
Katarzyna K. Grudzińska
Damian KaszaDamian Kasza
Damian Kasza
PZPaweł P. Zagożdżon
Paweł P. Zagożdżon
Werenskiold Glacier in the Isle of Spitsbergen is one of the polygons on which evaluation of the rate of glacier recession is performed. Location of the glacier front is precisely presented in the specialist literature since the mid. 30. of 20th century. Article presents results of studies about changes in the position of Werenskiold Glacier based on selected archival data and own research conducted in 2012-2013. The initial location of the glacier front was described by the topographical map in the scale 1:5000 elaborated in the year 1961 on the basis of data from the years 1957-1959 by the Polish Army Topographic Service. Moreover, as comparative data on location of glacier front in the later years there were applied results of photogrammetrical images from the year 1973 and a orthophotomap from 1990. These data together with the author's GPS measurements were transformed into the uniform coordinate system. Thus, prepared data made it possible to evaluate the rate of recession of Werenskiold Glacier front in the three epochs from the years 1957-2013. It was found that during the 56 years the glacier front was moved by ca. 1200 m, which gives the mean recession value of 25 m/year as well as the mean yearly loss of the glacier surface of the order of 5 ha.

8 March 2024 in Civil and Environmental Engineering Reports
Verified
Journal Article
Open access
MSMartyna Siejek
Martyna Siejek
Damian KaszaDamian Kasza
Damian Kasza
JWJaroslaw Wajs
Jaroslaw Wajs
Autonomous drive systems are a dynamically developed sector of the automotive industry. The key problem in such technological solutions is to provide a reliable navigation system, which is typically based on high-definition (HD) maps supporting the identification of the position of a maneuvering vehicle. HD maps should include possibly up-to-date and detailed information on traffic lanes and on the traffic rules and regulations on such lanes. An effective development of an HD map should be based on the geodetic measurement methods, which ensure efficient and accurate acquisition of spatial data. This article presents the results of an experiment consisting in the manipulation of data obtained with the use of the mobile laser scanning method and further in employing this data in the development of an HD map in an open-source environment. The applied measurement technology and the processing method allowed data of high resolution (frequently above 1000 points per m2) and of high accuracy (3D accuracy down to less than 5 cm). The obtained data were processed in the Vector Map Builder environment (which is accessible from the level of an internet browser) and the final product - HD map was created in the Lanelet2 open-source environment. The above-described experiments allowed two main conclusions. Most importantly, they demonstrate the importance of planning and performing in-field mobile laser scanning measurements. They also point to the important role of the human analyst who needs to manually vectorize the key elements of road infrastructure and to define traffic rules.