This paper proposes a frequency security constrained unit commitment (FSC-UC) model for sufficient deployment of diversified frequency support resources. Specifically, the diversities in generators' inertial response capability, primary frequency response (PFR) ramping capability, and quasi-steady-state (QSS) PFR power capability are integrated into FSCs to ensure post-contingency frequency security. Moreover, we analyze the opposite impacts of upper/lower variable renewable energy (VRE) deviation, brought by the VRE uncertainties, on frequency security. Hence, an asymmetric robust re-dispatch strategy (ARRS) is proposed to handle the power balance and ensure frequency security robustness in all stochastic VRE scenarios. Case studies on a modified IEEE 6-bus system and a real provincial power system in Northwest China validate the effectiveness and scalability of the proposed FSCs and ARRS.
With the increasing amounts of terminal equipment with higher requirements of communication quality in the emerging fifth generation mobile communication network (5G), the energy consumption of 5G base stations (BSs) is increasing significantly, which not only raises the operating expenses of telecom operators but also imposes a burden on the environment. To solve this problem, a two-step energy management method that coordinates 5G macro BSs for 5G networks with user clustering is proposed. The coordination among the communication equipment and the standard equipment in 5G macro BSs is developed to reduce both the energy consumption and the electricity costs. A novel user clustering method is proposed together with Benders decomposition to accelerate the solving process. Simulation results show that the proposed method is computationally efficient and can ensure near-optimal performance, effectively reducing the energy consumption and electricity costs compared with the conventional dispatching scheme.