With recent technology advances and price drop, battery energy storage systems (BESSs) are considered as a promising storage technology in power systems. In this paper, a stochastic BESS planning model is introduced, which determines optimal capacity and durations of BESSs to co-locate utility-scale solar photovoltaic (PV) systems in a high-voltage power system under the uncertainties of renewable resources and electric load. The optimization model minimizing total costs aims to obtain at least 20% electric energy from renewable sources, while satisfying all the physical constraints. Furthermore, two-stage stochastic programming is applied to formulate mathematical optimization problem to find out optimal durations and capacity of BESSs. In scheduling BESSs, chronology needs to be considered to represent temporal changes of BESS states; therefore, a scenario generation method to generate random sample paths with 1-h time step is adopted to explicitly represent uncertainty and temporal changes. The proposed mathematical model is applied to a modified IEEE 300-bus system that comprises 300 electric buses and 411 transmission lines. Optimal BESS durations and capacity are compared when different numbers of scenarios are employed to see the sensitivity to the number of scenarios in the model, and “value of stochastic solution” (VSS) is calculated to verify the impacts of inclusion of stochastic parameters. The results show that the building costs and capacity of BESSs increase when the number of scenarios increases from 10 to 30. By inspecting VSSs, it is observed that an explicit representation of stochastic parameters affects the optimal value, and the impacts become larger when the larger number of scenarios are applied.
As more generation capacity using renewable sources is accommodated in the power system, methods to represent the uncertainty of renewable sources become more important, and stochastic models with different methods for uncertainty representation are introduced. This paper investigates the impacts of hourly variability representation of random variables on a stochastic generation capacity expansion planning model. In order to represent the hourly variability as well as uncertainty of the random parameters such as wind power availability, solar irradiance, and load, AutoRegressive-To-Anything (ARTA) stochastic process is applied. By using autocorrelations and marginal distributions of the random parameters, a stochastic process with hourly intervals is generated, where generated random sample paths are used for scenarios. A mathematical formulation using stochastic programming is presented, and a modified IEEE 300-bus system with transmission line constraints is employed to the mathematical model as a test system. Optimal generation capacity solutions obtained using GAMS/CPLEX are compared to the ones from the model only capturing the uncertainty and seasonal variability of the random parameters. The comparison results indicate that the economic value of solar photovoltaic (PV) generation may be overestimated in the case where the hourly variability is not reflected; thus, ignoring the hourly variability may lead to higher building costs and higher capacity of solar PV systems.
Grid integration of renewable resources such as solar and wind energy can significantly raise the level of uncertainty in power systems, making the scheduled operation of generating units difficult. Therefore, the importance of operating reserves is more emphasized to prevent disruption by sudden changes in outputs of generators. In this paper, a stochastic unit commitment (UC) model to reflect uncertainty due to a large amount of renewable resources is proposed, in which upward and downward operating reserves are deployed simultaneously, and feasibility of the reserves is examined to make the deployed reserves supplied reliably. Uncertain parameters considered in the model are wind power availability, solar direct normal irradiance, and electric load. Two-stage stochastic programming is applied to the mathematical formulation, where UC decisions including dispatch are modeled as non-anticipative variables at the first stage, and redispatch decisions to serve realized electric demand are made at the second stage as recourse. By solving the UC problem, feasible and reliable stochastic UC and dispatch solutions can be provided to power system operators.
Benefits of energy storage systems (ESSs) are being investigated to figure out whether ESSs are worthwhile to install and operate. As ESSs are addressed as an effective tool to mitigate variability and uncertainty of renewable resources, measurements of their values are more emphasized. This paper examines benefits of ESSs, particularly for ESSs cooperating with solar photovoltaic (PV) or wind farms, using a stochastic unit commitment (UC) model co-optimizing energy and reserves by the ESSs with enhanced deliverability of the deployed reserves. For benefit measurements, cost savings, renewable energy generation improvements, and carbon dioxide emissions reduction are quantified and compared under different operational conditions of the ESSs. Optimal UC, energy, and upward&downward reserve schedules by the thermal generators and ESSs are provided by the proposed simulation model. The model is also designed to achieve environmental policy goals: 30% renewable energy generation and capped carbon dioxide emissions for low carbon electricity generation. The uncertainties of renewable resources–available wind and solar DNI–and electric load, are modeled as random variables, and two-stage stochastic mixed integer linear programming is applied to represent the given uncertainties in the formulation. Scenarios for random variables are generated using the autoregressive-to-anything (ARTA) process. The results show that operating the ESSs with providing downward reserves improves efficiency of UC by committing a small number of conventional generators and significantly increases benefits.
As the need for energy storage systems (ESSs) capacity is increasing due to high accommodation of renewable resources, it is crucial to analyze in which location and for what purpose the ESSs are required to achieve the highest efficiency. Investors and system operators can place and operate the ESSs as expected based on this analysis. Therefore, this study assesses the specific roles of ESSs in a grid system based on their optimal capacity needs, locations, and operations. A long-term simulation model using mixed-integer programming is proposed to obtain these optimal solutions, such as ESS capacity and operational schedules for energy and reserves. Four-week operational simulations are performed for each month using data from the California Independent System Operator. ESSs are placed at sites with solar photovoltaic (PV) systems or wind farms, at baseload generator buses, and at load buses to verify the role of ESSs, depending on the locational differences. The detailed roles are analyzed from the aspects of flexible capacity supply, reserve deployments, time-shifting renewable and thermal energy generation, and costs. The results show that the ESSs on the baseload generation side provide flexibility by time-shifting baseload generation and turn on baseload generators, even when the net load is small. For instance, the required capacity of the flexible thermal generators, such as natural gas turbine generators, is about 3004 MW without the ESS operations in May. When 450 MW ESSs colocated with solar PVs are operated, the required flexible capacity of the thermal generators is lowered to 2404 MW. Moreover, ESSs are highly utilized as a downward reserve provider, although their costs for reserves are higher than thermal generators.