Amy Lee

Prof. Amy Lee


Research Focus & Metrics

Academic Career Length

22Years (2005-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
19 August 2010 in Journal of Intelligent Manufacturing
Verified
Journal Article
Closed access
PDF file
HKHe-Yau Kang
He-Yau Kang
ALAmy Lee
Amy Lee
CYC.-Y. Yang
C.-Y. Yang

27 January 2017 in Sustainability
Verified
Journal Article
Open access
PDF file
ALAmy Lee
Amy Lee
HKHe-Yau Kang
He-Yau Kang
YLYou-Jyun Liou
You-Jyun Liou
Due to decaying fossil resource and increasing environmental consciousness, the demand of renewable energy resources is escalating these days. Photovoltaic solar energy is one of the most popular renewable energy resources in places where sunlight is abundant. The selection of a desirable location for constructing a photovoltaic solar plant is the first and one of the most important stages in the plant construction to provide a long-term energy production. In this paper, a comprehensive multiple-criteria decision-making model, which incorporates the interpretive structural modeling (ISM), fuzzy analytic network process (FANP) and VIKOR (VlseKriterijumska OptimizacijaI Kompromisno Resenje in Serbian,meaning multi-criteria optimization and compromise solution), is proposed to select the most suitable photovoltaic solar plant location. The ISM is applied first to determine the interrelationships among the criteria and among the sub-criteria,andtheresults are used to construct a decision-making network. The FANP is applied next to solve the network and to calculate the importance weights of the sub-criteria. Finally, the VIKOR is adopted to determine the ranking of the photovoltaic solar plant locations. The proposed model is applied in a case study in evaluating photovoltaic solar plant locations in Taiwan. By applying the proposed model, decision makers can have a better thinking process and make more appropriate decisions justifiably.

15 May 2009 in International Journal of Production Research
Verified
Journal Article
Closed access
ALAmy Lee
Amy Lee
With increasingly fierce global competition, firms in various industries need to build a cooperative buyer–supplier relationship to survive and to acquire reasonable profit. Even though the literature on various types of collaboration between firms is abundant and the works on supplier selection models are numerous, the research that provides a mathematical model for the selection of the most appropriate form of buyer–supplier relationship is very limited. Existing buyer–supplier evaluation models usually only consider the benefits from the relationship, but not the opportunities, costs and risks that may need to be confronted. The main objective of this study is to propose an analytical approach to evaluate the forms of buyer–supplier relationship between a manufacturer and its supplier. A fuzzy analytic hierarchy process (AHP) model, which applies fuzzy set theory and the benefits, opportunities, costs and risks (BOCR) concept, is constructed to deal with uncertainty and to consider various aspects of alternatives. Multiple factors that affect the success of the relationship are analysed by incorporating experts’ opinions on their priority of importance, and a performance ranking of the buyer–supplier forms is obtained. A case study of selecting the most appropriate buyer–supplier form between a TFT-LCD manufacturer and its colour filter supplier is presented, and the proposed model is applied to facilitate the decision process. The proposed model is a general form that can be tailored and applied by firms that are making decisions on buyer–supplier relationship.

1 February 2011 in Flexible Services and Manufacturing Journal
Verified
Journal Article
Closed access
PDF file
ALAmy Lee
Amy Lee
CLChun-Yu Lin
Chun-Yu Lin

20 April 2005 in The International Journal of Advanced Manufacturing Technology
Verified
Journal Article
Closed access
PDF file
ALAmy Lee
Amy Lee
HKHe-Yau Kang
He-Yau Kang
WWWen-Pai Wang
Wen-Pai Wang

21 November 2011 in Energies
Verified
Journal Article
Open access
PDF file
HKHe-Yau Kang
He-Yau Kang
MHMeng-Chan Hung
Meng-Chan Hung
WPW. L. Pearn
W. L. Pearn
ALAmy Lee
Amy Lee
MKMei-Sung Kang
Mei-Sung Kang
The demands for alternative energy resources have been increasing exponentially in the 21st century due to continuous industrial development, depletion of fossil fuels and emerging environmental consciousness. Renewable energy sources, including wind energy, hydropower energy, geothermal energy, solar energy, biomass energy and ocean power, have received increasing attention as alternative means of meeting global energy demands. After Japan's Fukushima nuclear plant disaster in March 2011, more and more countries are having doubt about the safety of nuclear plants. As a result, safe and renewable energy sources are attracting even more attention these days. Wind energy production, with its relatively safer and positive environmental characteristics, has evolved in the past few decades from a marginal activity into a multi-billion dollar industry. In this research, a comprehensive evaluation model is constructed to select a suitable location for developing a wind farm. The model incorporates interpretive structural modeling (ISM), benefits, opportunities, costs and risks (BOCR) and fuzzy analytic network process (FANP). Experts in the field are invited to contribute their expertise in evaluating the importance of the factors and various aspects of the wind farm evaluation problem, and the most suitable wind farm can finally be generated from the model. A case study is carried out in Taiwan in evaluating the expected performance of several potential wind farms, and a recommendation is provided for selecting the most appropriate wind farm for construction.