Construction projects are becoming much more complex and difficult to manage, reciprocal interdependence between stakeholders is one of the causes, such as architects, civil engineers and mechanical. Building Information Modelling (BIM) not only allows the geometrical modelling butalso useful for management of construction project especially in communication between stakeholders. The aims of this papers is to find out the project benefit of BIM as a media communication. Data collection is done by distributing questionnaires to large companies both contractor or engineering consultants in DKI Jakarta who have used BIM in communication process. The data is processed by using the structural equation modeling (SEM) method and It was found that the use of BIM could facilitate stakeholders involved in the construction project work team in communicating and coordinating.
Value-based decision making is the consideration of function and cost in the decision to select the highest possible option. Reviews to previous studies showed that there is a lack of consideration of the criteria of value in the decision-making process. Hence, this research aims to identify the criteria for redeveloping transportation facilities based on function and cost. The ultimate goal of this research is to select the best value alternative for project redevelopment. An abandoned airport was chosen as the case study to evaluate the decision made by the government to invest in the project of transforming the abandoned airport into a hospital that aims to cater to the increasing demand for healthcare. A quantitative and qualitative approach was applied through literature review, survey, and interview to experts in the area of transportation facilities development. Statistical descriptive analysis was used to analyse the first survey, which was to investigate the critical factors under the category of function. The second survey was conducted to select the most valuable alternative for the redevelopment by utilising the Analytical Hierarchy Process (AHP), and it was found that the transportation hub is the most valuable alternative for redeveloping the abandoned airport. The result was then validated by an expert from the industry, and it can be concluded that the value-based decision-making model can be used in enhancing the decision of the redevelopment of transportation facilities by considering both function and cost.
1 May 2021 in IOP Conference Series: Earth and Environmental Science
The construction project has a high complexity of work due to the many parties involved in it. In project construction the parties who involved must be able to manage and distribute construction materials properly, it can be realized if the parties who involved can establish good coordination and communication to complete the work. In the flow of information contained in supply chain management must also pay attention to the types of communication media that used so that coordination and communication run effectively. This study aims to determine the pattern of information flow that occurs and the role of communication media in the information flow. This research was conducted by interview method, followed by the distribution of questionnaires using the Delphi method to obtain consensus on what types of communication media have the potential to become an effective communication media in project supply chain management. In this study, information flow patterns formed in 3 projects carried out by state-owned corporation and the communication media used were very diverse and the telephone became the highest ranked communication media and included 3 types of information flow namely general information flow, material information flow, and financial information flow.
30 June 2022 in Indonesian Journal of Construction Engineering and Sustainable Development (CESD)