Though flexible DC distribution system (FDCDS) is becoming a new hotspot in power systems lately because of the rapid development of power electronic devices and massive use of renewable energy, the failure to realize accurate fault location with high precision restricts its further application. Thus, a novel precise pole-to-ground fault location method of FDCDS based on wavelet transform (WT) and convolution neural network (CNN) is proposed in this paper for the limitation on the number of measuring points and high difficulty in extracting characteristics of FDCDS. The fault voltage signal is decomposed with multi-resolution by discrete wavelet transform (DWT), and then the transient energy function is constructed to select the frequency bands containing rich fault characteristics for signal reconstruction. The reconstructed signal forms two-dimensional time-frequency images through continuous wavelet transform (CWT), which are used as the input of CNN classifier after image enhancement to form the mapping relation between the fault feature and fault position using the powerful generalization ability of CNN, so as to complete fault location with high precision. The sample data on PSCAD/EMTDC verifies the accuracy and reliability of the proposed method, which can achieve fault location with positioning precision of 30 m. The proposed method overcomes the influence of the control strategy of the converter and the number of input capacitors of the bridge arm in the time-domain analysis, and still has strong robustness in the case that FDCDS is connected with many distributed generations (DGs) with output fluctuation. Furthermore, four other methods for fault location as comparisons are given to reflect the validity and anti-interference ability of proposed methods in various noises.
With increasing market competition and rapid development of service economy, more and more enterprises are shifting from providing products or services to providing product‐service systems (PSSs) that integrate products and services, in order to improve competitiveness and profitability. Meanwhile, consumers have strategic delayed purchasing behavior when purchasing the PSS and high requirements for service quality. This paper investigates the two‐period pricing and service quality decisions of product‐service supply chain (PSSC) considering consumers’ strategic behavior under decentralized and centralized scenarios. The equilibrium results are compared in two scenarios. In order to eliminate performance loss under the decentralized scenario, we design two‐period dynamic contracts to coordinate the PSSC. Furthermore, numerical simulation is provided to verify the feasibility of the contracts. The following conclusions can be drawn: (1) the higher the service input‐efficiency, the more beneficial for alleviating consumers’ strategic purchase behavior under two scenarios, but this mitigation effect is more obvious under the centralized scenario. (2) Compared with the centralized scenario, the service quality is lower, the two‐period PSS sales prices are higher, and the two‐period profit is lower under the decentralized scenario. The proportion of service valuation (accounts for the valuation of PSS) will promote the widening of the service quality gap under two scenarios, but in some cases, the service input‐efficiency will weaken the promotion effect of the proportion of service valuation. (3) The design of the two‐period combined contracts depends on the proportion of service valuation. When the proportion of service valuation is high, the “two‐period revenue sharing + service‐cost sharing” combined dynamic contract can achieve PSSC perfect coordination. However, when the proportion of service valuation is low, it is necessary to design complexity combined dynamic contract which can achieve PSSC perfect coordination.
1 January 2022 in Journal of Industrial and Management Optimization
Currently, the upstream software developer usually cooperates with the downstream service provider to sell software and related services to client enterprises. Furthermore, the quality of pre-sale services provided by the provider has significant impact on software sales and on the performance of IT service supply chain (ITSSC). However, the existing research on IT service supply chain management (ITSSCM) lacks attention to this issue. In this study, we consider an ITSSC with a software developer, a service provider and client enterprises. Two scenarios are discussed in this study. Our study finds that the quality of pre-sale services provided by the provider and the price of extended warranty service (EWS) provided by the developer (in centralized decision-making (CDM)) are both higher than those in decentralized decision-making (DDM); when the sensitivity of clients to the software price is lower than a certain critical value, the software sales price (in CDM) is unexpectedly higher than that in DDM; however, when it is higher than the certain value, the software sales price (in CDM) is lower than that in DDM. Due to the double marginal effect between the developer and the provider, the total profit of ITSSC (in DDM) is always lower than that in CDM. By providing a combined coordination contract based on "guiding price $ + $ service cost sharing $ + $ product revenue sharing", not only the total profit of ITSSC can be increased, but also the profit of ITSSC members can be Pareto improved.
1 January 2022 in Journal of Industrial and Management Optimization
Currently, many upstream software developers not only sell software through downstream service providers, but also directly sell it to clients. However, in the field of IT service supply chain management, there is a lack of research on the channel encroachment of software developers. In this study, we consider an IT service supply chain with a software developer, a service provider and client enterprises. Clients can either purchase the software (developed by the software developer) from the provider with a high price and additional pre-sale services, or directly purchase it from the developer with a low price but without pre-sale service. After purchasing the software, the clients can also purchase the extended warranty service from the developer. The study shows that the market size occupied by the developer and the intensity of competition between the two parties will neither affect the developer's product and service pricing decisions, nor influence the total demand for software products and extended warranty services, and thus will not impact his own profit. However, these factors will impact the provider's decisions for pre-sale service quality and software sales price, thereby affecting the provider's software demand and profit, and thus impact the performance of the supply chain. In addition, as the intensity of competition between both parties increases, the provider will simultaneously choose to reduce the pre-sales service quality and the software sales price to compete with the developer. Different from conclusions of the existing research on competition, we surprisingly observe that as the sensitivity of client enterprises to the extended warranty services price increases, both parties will increase the software price to compete. The encroachment of the developer will reduce the provider's software demand and profit, and thus lead to a decline in the performance of the supply chain. Therefore, the encroachment of the developer is an act of squeezing out partners by decreasing the profit of the provider, but without affecting his own profit.
1 January 2023 in Journal of Industrial and Management Optimization
This study examines an IT supply chain with two software developers, a service integrator, and client enterprises, where developer A directly sells its software to the clients and developer B authorizes its software to the integrator for sale. Our analysis shows that developer A will increase (decrease) its software sales price and decrease (increase) its extended warranty service (EWS) sales price to compete with the integrator when the unit EWS cost is low (high) and the intensity of software competition between them increases; while the integrator will compete with developer A by sacrificing (improving) the pre-sales services (Pr-SS) quality and reducing its software sales price. Especially, when they are engaged in software competition and service cooperation, the profit of developer A surprisingly increases with the intensity of competition; when they are only engaged in software competition, the profit of developer A may still increase with the competitive intensity. Moreover, when the unit EWS cost is higher than a certain threshold, the profit of integrator increases with the competitive intensity. Under certain conditions, both the profit of developer A and that of integrator surprisingly increase with the competitive intensity.