The short-term unit commitment (UC) problem in hydrothermal power generation is a large-scale, mixed-integer nonlinear program, which is difficult to solve efficiently, especially for large-scale instances. It is possible to approximate the nonlinear objective function of the problem by means of piecewise-linear functions, so that UC can be approximated by an mixed-integer linear program (MILP); applying the available efficient general-purpose MILP solvers to the resulting formulations, good quality solutions can be obtained in a relatively short amount of time. We build on this approach, presenting a novel way to approximating the nonlinear objective function based on a recently developed class of valid inequalities for the problem, called ldquoperspective cuts.rdquo At least for many realistic instances of a general basic formulation of UC, an MILP-based heuristic obtains comparable or slightly better solutions in less time when employing the new approach rather than the standard piecewise linearizations, while being not more difficult to implement and use. Furthermore, ldquodynamicrdquo formulations, whereby the approximation is iteratively improved, provide even better results if the approximation is appropriately controlled.
We study a class of generalized bundle methods for which the stabilizing term can be any closed convex function satisfying certain properties. This setting covers several algorithms from the literature that have been so far regarded as distinct. Under a different hypothesis on the stabilizing term and/or the function to be minimized, we prove finite termination, asymptotic convergence, and finite convergence to an optimal point, with or without limits on the number of serious steps and/or requiring the proximal parameter to go to infinity. The convergence proofs leave a high degree of freedom in the crucial implementative features of the algorithm, i.e., the management of the bundle of subgradients ($\beta$-strategy) and of the proximal parameter (t-strategy). We extensively exploit a dual view of bundle methods, which are shown to be a dual ascent approach to one nonlinear problem in an appropriate dual space, where nonlinear subproblems are approximately solved at each step with an inner linearization approach. This allows us to precisely characterize the changes in the subproblems during the serious steps, since the dual problem is not tied to the local concept of $\varepsilon$-subdifferential. For some of the proofs, a generalization of inf-compactness, called * -compactness, is required; this concept is related to that of asymptotically well-behaved functions.
The Unit Commitment problem in energy management aims at finding the optimal productions schedule of a set of generation units while meeting various system-wide constraints. It has always been a large-scale, non-convex difficult problem, especially in view of the fact that operational requirements imply that it has to be solved in an unreasonably small time for its size. Recently, the ever increasing capacity for renewable generation has strongly increased the level of uncertainty in the system, making the (ideal) Unit Commitment model a large-scale, non-convex, uncertain (stochastic, robust, chance-constrained) program. We provide a survey of the literature on methods for the Uncertain Unit Commitment problem, in all its variants. We start with a review of the main contributions on solution methods for the deterministic versions of the problem, focusing on those based on mathematical programming techniques that are more relevant for the uncertain versions of the problem. We then present and categorize the approaches to the latter, also providing entry points to the relevant literature on optimization under uncertainty.