Chien-Liang Lin

Chien-Liang Lin


Research Focus & Metrics

Academic Career Length

10Years (2017-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
16 May 2017 in Sustainability
Verified
Journal Article
Open access
PDF file
CLChien-Liang Lin
Chien-Liang Lin
CJChen-Huu Jeng
Chen-Huu Jeng
Construction projects are complex systems that inherently contain complex interface problems. This study explored the root causes of interface problems in construction projects using structural equation modeling. This technique is a systematic approach that combines factor analysis and path analysis to investigate the causal relationships among multidimensional factors. The literature on construction interface problems was reviewed, and a questionnaire survey was conducted in Taiwan to identify 27 initial factors that cause interface problems in three dimensions: owner, design, and construction. Then, a series of structural equation models (SEMs) was developed to further explore the root causes of the interface problems and their causal relationships. This study has three main findings: (1) poor design causes interface problems; (2) ineffective communication and coordination among the owner, design, and construction dimensions are the main factors that cause construction interface problems; and (3) a lack of communication and coordination has a greater influence on the construction dimension than on the owner and design dimensions. The above findings can be used as important references and sustainable management strategies for academia and decision-makers in the construction industry.

13 February 2021 in Sustainability
Verified
Journal Article
Open access
PDF file
CLChien-Liang Lin
Chien-Liang Lin
BCBey-Kun Chen
Bey-Kun Chen
Risks inevitably exist in all stages of a project. In a construction project, which is highly dynamic and complex, risk factors affect the expected achievement rates of the three main performance goals, namely schedule, cost, and quality. A comprehensive risk management procedure requires three crucial steps: risk confirmation, analysis, and treatment. Risk analysis is the core of risk management. Through structural equation modeling, this study developed a risk analysis model that takes a different perspective and considered the occurrence probability of risk events and the extent to which these events affect a project. The contractor dimension was discovered to exert the strongest influence on an overall project, followed by the subcontractor and design dimensions. This paper proposes a novel construction project risk analysis model, which considers the entire project. The proposed model can be used as a reference for risk managers to make decisions about project risks, so as to achieve the ultimate goal of saving resources and the sustainable operation of the construction project.

1 February 2019 in International Journal of Materials, Mechanics and Manufacturing
Verified
Journal Article
Closed access
CLChien-Liang Lin
Chien-Liang Lin