Fikile Poswa

Mr. Fikile Poswa

Tshwane University of Technology, Pretoria, Gauteng, South Africa
orcid

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
17 September 2022 in Processes
Verified
Journal Article
Open access
PDF file
FPFikile Poswa
Fikile Poswa
OAOlukorede Tijani Adenuga
Olukorede Tijani Adenuga
KMK Khumbulani Mpofu
K Khumbulani Mpofu
The accumulation of process waste in the production line causes fluctuations, bottlenecks, and increased inventory in workstations disrupting process flow. In this paper, the optimal process flow that will improve productivity using simulated value stream mapping (SVSM) for decision-making to provide consistency, minimise errors and non-value adding times in the implementation phase of VSM in the truck manufacturing industry. The proposed methodology applied a discrete event simulation for production process operations improvement to eliminate non-value adding times and provide good quality products at the lowest cost and highest efficiency. The results are the analysis of the current state of the production system in a South African truck manufacturing industry as a potential solution for the production system’s future state. The identified non-value adding times in the six most critical workstations were eliminated by SVSM resulting in a productivity improvement of 4%, most importantly bringing the productivity to 95% and total cycle time improvement to 451 for small units and 466 for large units. The results proposed combined VSM and simulation techniques based on empirical data from the observation during time measurement. The Yamazumi confirms the issues observed and the NVA recorded by showing how close the process cycle times are to the TAKT time, which enhance the LEAN application by DES to increase productivity and performance improvement to remain competitive in the global economy.

17 August 2022 in Preprints.org
Verified
Preprint
Open access
PDF file
FPFikile Poswa
Fikile Poswa
KMK Khumbulani Mpofu
K Khumbulani Mpofu
OAOlukorede Tijani Adenuga
Olukorede Tijani Adenuga
The accumulation of process waste in the production line causes fluctuations, bottlenecks, and increased inventory in workstations disrupting process flow. In this paper, the aim is the use a simulated value stream mapping (SVSM) as a lean assessment tool for decision-making in the continuous improvement process to influence and provide consideration and consistency on productivity improvement in the production system. The proposed methodology applied discrete event simulation for production process operations improvement to eliminate non-value adding times and provides good quality products at the lowest cost and highest efficiency. The results are the analysis of the current state of the production system in a South African truck manufacturing industry small and medium enterprise (SMEs) as a potential solution for the production system future state. The identified non-value adding times in the 6 most critical workstations was eliminated by SVSM which resulted in a productivity improvement of 4%, most importantly bringing the productivity to 95% and total cycle time improvement to 451 for small units and 466 for large units. The results proposed combined VSM and Simulation techniques which enhance the LEAN application by DES to increase productivity and performance improvement to remain competitive in the global economy.