NOEMIE BALOUKA

Dr. NOEMIE BALOUKA

Technion - Israel Institute of Technology
+1
orcid

Research Focus & Metrics

Academic Career Length

13Years (2014-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 June 2021 in European Journal of Operational Research
Verified
Journal Article
Closed access
NOEMIE BALOUKANOEMIE BALOUKA
NOEMIE BALOUKA
Izack CohenIzack Cohen
Izack Cohen

15 February 2021 in Sustainability
Verified
Journal Article
Open access
PDF file
Leonardo Nudelman RosenbergLeonardo Nudelman Rosenberg
Leonardo Nudelman Rosenberg
NOEMIE BALOUKANOEMIE BALOUKA
NOEMIE BALOUKA
YHYale Herer
Yale Herer
Eglantina DaniEglantina Dani
Eglantina Dani
PGPaco Gasparin
Paco Gasparin
Sonja van UdenSonja van Uden
Sonja van Uden
Last-mile logistics is both a source and cause of problems in urban areas, especially problems related to traffic congestion, unsustainable delivery modes, and limited parking availability. In this context, multiple sustainable logistics solutions have been proposed. We focus on micro-depots (MDs), which can function as a consolidation center and a collection-and-delivery point for business-to-consumer (B2C) small parcels. This paper presents a new research idea that extends the existing MD solution by introducing the concept of a shared MD network with parcel lockers. Such networks enable multiple logistics service providers (LSPs) and/or business partners to use an MD while minimizing their individual costs and optimizing the use of urban space. We present case studies of such shared MD networks operating in the cities of Helsinki and Helmond. We provide a framework for auxiliary businesses that can exploit the existing MD structure to offer services to the surrounding population. Finally, we define metrics for evaluating the success of shared MD networks while considering social, environmental and economic objectives. The case studies highlight the complexity of implementing such a solution; it requires stakeholders’ involvement and collaboration. In particular, deciding on the location for a shared MD network is a critical phase, since local authorities have their own regulations, and residents’ preferences are usually different than LSPs’ ones. Nevertheless, if these challenges are overcome, this sustainable last-mile logistics solution has a promising future.

11 December 2015 in IEEE Transactions on Engineering Management
Verified
Journal Article
Closed access
NOEMIE BALOUKANOEMIE BALOUKA
NOEMIE BALOUKA
Izack CohenIzack Cohen
Izack Cohen
ASAvraham Shtub
Avraham Shtub
The current trend in modern project management methodologies is to maximize project values. We suggest a quantitative model that balances time, cost, and value. It generates detailed project plans, which are feasible with respect to time, cost, and resource-constraints, and considers interactions between technical performance, time, and cost. Such interactions, which existing project management models typically ignore or project managers deal with intuitively, are important for increasing projects' values. The model, which extends the multimode resource-constrained project scheduling problem by including value, generates an efficient frontier that includes the best project plans for varying project costs. We provide illustrative examples to demonstrate the suggested approach.

1 September 2014
Verified
Book Chapter
Closed access
ATA. Tzimerman
A. Tzimerman
LDL. Dery
L. Dery
NOEMIE BALOUKANOEMIE BALOUKA
NOEMIE BALOUKA
Izack CohenIzack Cohen
Izack Cohen
YHY. T. Herer
Y. T. Herer
ASA. Shtub
A. Shtub
TutORials in Operations Research is a collection of tutorials published annually and designed for students, faculty, and practitioners. The series provides in-depth instruction on significant operations research topics and methods. INFORMS has published the series, founded by Harvey J. Greenberg, since 2005.

1 June 2018
Verified
Conference Paper
Closed access
Izack CohenIzack Cohen
Izack Cohen
NOEMIE BALOUKANOEMIE BALOUKA
NOEMIE BALOUKA
This paper deals with the stochastic multimode resource constrained project scheduling problem (MRCPSP). Stochasticity is manifested by uncertain activity durations. The objective is to find a minimal duration robust project plan that determines activity modes and schedules. Robustness ensures that the plan is feasible for any activity duration realization within an uncertainty set. We formulate the robust MRCPSP and develop an analytical solution approach.