Xinchao Kang

Dr. Xinchao Kang


Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 January 2021 in Shock and Vibration
Verified
Journal Article
Open access
PDF file
DGDongming Guo
Dongming Guo
XKXinchao Kang
Xinchao Kang
ZLZhiying Lu
Zhiying Lu
QCQiyu Chen
Qiyu Chen
According to the characteristics of rock burst of high horizontal stress roadway floor, the rock burst mechanism of roadway floor was studied with the background of south track roadway Xing’an mine. Based on the deflection theory and energy principle of the slab, the mechanical model of the floor of the roadway under high horizontal stress was established, the stress and energy criteria of rock burst occurred in the floor of the roadway were deduced, the prevention and control measures of the floor pressure relief with large diameter borehole and concrete‐filled steel tube pile support were put forward, and the key parameters were determined. By establishing a numerical model, the evolution law of plastic zone, horizontal stress, and elastic strain energy density of roadway floor with or without support is contrastively analyzed. The results show that the effective means to prevent and control the floor rock burst is to cut off the stress transfer path by weakening the hard floor to reduce floor energy accumulation so as to reduce the floor rock burst risk. Based on the above research, field tests were carried out, and the microseismic monitoring results showed that the floor pressure relief of large diameter boreholes and concrete‐filled steel tube pile support effectively relieved the floor rock burst and guaranteed the safety and efficiency of roadway excavation. This technology can provide a reference for the prevention and control of floor rock burst of similar roadways.

8 January 2020 in Shock and Vibration
Verified
Journal Article
Open access
PDF file
KLKang Liu
Kang Liu
DGDongming Guo
Dongming Guo
XKXinchao Kang
Xinchao Kang
JZJun Zhang
Jun Zhang
The surrounding rock damage of a tunnel under adjacent explosive load is often manifested as the growth of the original crack. In order to thoroughly understand the crack growth mechanism, in this study, the growth process of the original crack was investigated in detail by the dynamic caustics experiment. The experimental study shows that the growth of original crack is the result of the combined action of explosion stress wave and explosive gas. The quasi-static stress generated by the explosive gas was superimposed on the weakened stress field, resulting in the formation of the peak of the main stress difference in the surrounding rock, moving towards the adjacent tunnel in the form of an arc wave. With the arc wave moving towards the original crack, the growth rate of the original crack increases rapidly. During the period of 200 μs to 250 μs, the crack growth rate oscillates at the peak, and its size is approximately equal to the moving speed of the arc wave. Based on the experimental results and microscopic damage mechanics, the high stress concentration at the original crack tip under the stress wave first causes damage localization and the weakest chain is formed by the penetration of the damage localization zones by microcracks by special distribution law. Subsequently, the original crack starts to initiate and grow along the direction of the weakest chain.