The penetration of distributed renewable energy sources in the distribution grid is increasing considerably in the last years. This is one of the main causes that contributed to the growth of technical problems in both transmission and distribution systems. An effective solution to improve system security is to exploit the flexibility that can be provided by distributed energy resources (DER), which are mostly located at the distribution grids. Their location combined with the lack of power flow coordination at the system operators interface creates difficulties in taking advantage of these flexible resources. This paper presents a methodology based on the solution of a set of optimization problems that estimate the flexibility ranges at the distribution and transmission system operators (TSO-DSO) boundary nodes. The estimation is performed while considering the grid technical constraints and a maximum cost that the user is willing to pay. The novelty behind this approach comes from the development of flexibility cost maps, which allow the visualization of the impact of DER flexibility on the operating point at the TSO-DSO interface. The results are compared with a sampling method and suggest that a higher accuracy in the TSO-DSO information exchange process can be achieved through this approach.
This paper presents two contributions developed in the framework of evolvDSO Project to support TSO-DSO cooperation. The Interval Constrained Interval Power Flow (ICPF) tool estimates the flexibility range at primary substations by aggregating the distribution network flexibility. The Sequential Optimal Power Flow (SOPF) tool defines a set of control actions that keep the active and reactive power flow within pre-agreed limits at primary substations level, by integrating different types of flexibility levers. Several study test cases were simulated using data of four real distribution networks from France and Portugal, with different demand / generation profiles and several degrees of flexibility.
The evolution of the electrical power sector due to the advances in digitalization, decarbonization and decentralization has led to the increase in challenges within the current distribution network. Therefore, there is an increased need to analyze the impact of the smart grid and its implemented solutions in order to address these challenges at the earliest stage, i.e., during the pilot phase and before large-scale deployment and mass adoption. Therefore, this paper presents the scalability and replicability analysis conducted within the European project InteGrid. Within the project, innovative solutions are proposed and tested in real demonstration sites (Portugal, Slovenia, and Sweden) to enable the DSO as a market facilitator and to assess the impact of the scalability and replicability of these solutions when integrated into the network. The analysis presents a total of three clusters where the impact of several integrated smart tools is analyzed alongside future large scale scenarios. These large scale scenarios envision significant penetration of distributed energy resources, increased network dimensions, large pools of flexibility, and prosumers. The replicability is analyzed through different types of networks, locations (country-wise), or time (daily). In addition, a simple replication path based on a step by step approach is proposed as a guideline to replicate the smart functions associated with each of the clusters.
Vertical load is the power flow between electrical transmission and distribution networks. In the past, large-scale generators connected to transmission systems supplied consumers connected to lower voltage levels across distribution grids. Thus, vertical loads tended to be downward-oriented. This paper presents a spatiotemporal distributed energy resources (DER) diffusion model to analyze vertical load uncertainty resulting from different DER diffusion process representations currently used in the industry and academia. Network planners and operators can use such model to understand the long-term evolution of load at the T/D boundary. The proposal is applied to the Portuguese power system, combining, as first of its kind, highly granulated population census with georeferenced transmission and distribution network datasets. This application analyzes the 20-year evolution of such vertical load flows at the transmission-distribution boundary under a strong uptake of DER embodied in lower voltage levels in Portugal.
This paper evaluates the flexibility provided by distributed energy resources (DER) in a real electricity distribution network in Germany. Using the Interval Constrained Power Flow (ICPF) tool, the maximum range of flexibility available at the primary substation was obtained for different operation scenarios. Three test cases were simulated, differing mainly in the considered level of renewable energy sources (RES) production. For each test case, the obtained results enabled the construction of flexibility areas that define, for a given operating point, the limits of feasible values for the active and reactive power that can be exchanged between the TSO and the DSO. Furthermore, the tool can also be used to evaluate the contribution from each type of DER to the overall distribution network flexibility.