Lirong Wan

Prof. Dr. Lirong Wan


Research Focus & Metrics

Academic Career Length

14Years (2013-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
15 February 2024 in Sensors
Verified
Journal Article
Open access
PDF file
QZQingliang Zeng
Qingliang Zeng
GZGuangyu Zhou
Guangyu Zhou
LWLirong Wan
Lirong Wan
LWLiang Wang
Liang Wang
GXGuantao Xuan
Guantao Xuan
YSYuanyuan Shao
Yuanyuan Shao
To address the lightweight and real-time issues of coal sorting detection, an intelligent detection method for coal and gangue, Our-v8, was proposed based on improved YOLOv8. Images of coal and gangue with different densities under two diverse lighting environments were collected. Then the Laplacian image enhancement algorithm was proposed to improve the training data quality, sharpening contours and boosting feature extraction; the CBAM attention mechanism was introduced to prioritize crucial features, enhancing more accurate feature extraction ability; and the EIOU loss function was added to refine box regression, further improving detection accuracy. The experimental results showed that Our-v8 for detecting coal and gangue in a halogen lamp lighting environment achieved excellent performance with a mean average precision (mAP) of 99.5%, was lightweight with FLOPs of 29.7, Param of 12.8, and a size of only 22.1 MB. Additionally, Our-v8 can provide accurate location information for coal and gangue, making it ideal for real-time coal sorting applications.

1 August 2018 in Tehnicki vjesnik - Technical Gazette
Verified
Journal Article
Open access
PDF file
ZMZhaosheng Meng
Zhaosheng Meng
QZQingliang Zeng
Qingliang Zeng
LWLirong Wan
Lirong Wan
PLPeng Liu
Peng Liu
The pose variations of the hydraulic support have significant influence on its performance. And the pose adjusting operations are required to be fast and precise, while they have typical mechanical-electric-hydraulic coordination...


12 July 2026 in Sensors
Verified
Journal Article
Open access
PDF file
RTRan Tao
Ran Tao
XLXIAOWAN LEI
XIAOWAN LEI
LWLirong Wan
Lirong Wan
YWYan Wang
Yan Wang
NXNan Xu
Nan Xu
Accurate mine pressure prediction is essential for understanding roof–support interaction and supporting intelligent monitoring in fully mechanized longwall mining. In underground production, hydraulic-support pressure sensors provide continuous pressure sequences that reflect the mechanical response of the support–roof system. However, these sequences are affected by local mining disturbances, missing records, abnormal zero-value segments, nonstationary fluctuations, and periodic weighting, which make future pressure forecasting challenging. To address this issue, an LSTM–Transformer hybrid model is proposed for hydraulic-support pressure forecasting. The LSTM module extracts local nonlinear pressure-evolution features from recent historical windows, whereas the Transformer module captures temporal dependencies and periodic pressure patterns through global sequence modeling. Support-wise experiments were conducted using field monitoring data from Yili No. 1 Mine, and the pressure sequence of each support was processed independently to avoid mixing information from different support locations. In the representative test case, the proposed model achieved an R2 of 0.971 and reduced the MAE to 0.471 MPa, while improving the phase consistency of predicted pressure peaks. Further analysis indicates that sufficient historical data coverage is necessary to capture complete pressure-evolution cycles, and that the 25-step forecasting case maintains stable accuracy for short-term mine pressure estimation. These findings demonstrate the feasibility of the proposed approach for hydraulic-support pressure prediction under the monitored conditions of the studied working face.


1 January 2015
Verified
Conference Paper
Open access
PDF file
LWLirong Wan
Lirong Wan
ZWZehua Wang
Zehua Wang
ZMZhaosheng Meng
Zhaosheng Meng
YZYawei Zong
Yawei Zong
Shell of the shearer ranging arm;force analysis of the drum;static analysis;the improvement of the shell Abstract: In order to optimize the shell structure of the shearer ranging arm, the force of the shearer drum is analyzed, and it used three-dimensional software Solidworks to establish the shell entity model. The structural static analysis of the shell is implemented by ANSYS software. Then it attained the static stress and deformed state of the shell. According to analysis results,the design of the shell structure was optimized.It concluded that the maximum deformation of the ranging arm is at the drum shaft, and it also corresponds to the maximum stress, and mechanical properties and the reliability of the shell were significantly improved.