guoping hu

Prof. guoping hu

Henan University of Urban Construction

Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
31 August 2022 in Engineering Reports
Verified
Journal Article
Open access
GHguoping hu
guoping hu
YXYingzhi Xia
Yingzhi Xia
XRXiaoxue Ruan
Xiaoxue Ruan
MZMingxin Zheng
Mingxin Zheng
Arch‐chord coupled anti‐sliding structure is a new type of anti‐sliding structure composed of multiple single piles in a specific form. The coupling effect of pile and soil is the most important key point. In this article, the factors that affect the coupling bearing capacity and load sharing ratio of the arch‐chord coupled anti‐sliding structure are screened out, and the rule that the evaluation index is affected by each factor is analyzed. The results show that, with the increase of pile diameter, the value of structural coupling ultimate bearing capacity increases exponentially, but the growth rate slows down gradually. With the increase of pile spacing, the value of structural coupling ultimate bearing capacity decreases. With the increase of soil cohesion around the pile, the value of structural coupling ultimate bearing capacity increases linearly. The coupling ultimate bearing capacity and load sharing ratio of the anti‐sliding structure are the most sensitive to the change of the internal friction angle of the soil around the pile, and the pile diameter has little effect on the evaluation indexes.

11 January 2022 in Advances in Civil Engineering
Verified
Journal Article
Open access
PDF file
JLJiawei Liu
Jiawei Liu
YXYingzhi Xia
Yingzhi Xia
HLHui Li
Hui Li
GHguoping hu
guoping hu
MHMingming Hu
Mingming Hu
Embankment soil affected by saline can not only cause roadbed settlement, frosting, and road cracks but also cause corrosion and cracking of roadbed pipelines, which seriously affects the stability of the road. Water evaporation and dry cracking of the saline soil mainly cause soil swelling, poor water stability, and corrosive characteristics of the embankment soil. In this study, the evaporative cracking characteristics of soil with different saline concentrations were investigated. The results showed that the moisture content decreased linearly with the drying time in the early evaporation process, subsequently decreased slow down in the mid‐term evaporation, and finally become got and remain a residual moisture content, which are 46.39%, 44.05%, 42.70%, and 40.27% with the increase of the saline concentration. The evaporation process with different saline concentrations in the soil can be divided into three stages: uniform evaporation stage, slow down evaporation stage, and equilibrium evaporation stage, which was consistent with the moisture content change. With the development of the drying time, the cracks gradually appeared on the soil surface, gradually deepened in the soil, and expanded the crack network. The development of cracks can be divided into three stages: the cracking preparation stage, the crack development stage, and the crack stable stage. The cracking began at high evaporation rate under high saline concentration, and the fractal dimension remained stable under similar saline concentration. The fractal dimension was gradually increased with the decrease of the moisture content and the increase of the saline concentration, respectively. The soil began to crack with larger moisture under high saline concentration. The drying cracks in the nature were consistent with the configuration of the cracks formed in the experimental results.

26 August 2021 in Engineering Reports
Verified
Journal Article
Open access
PDF file
GHguoping hu
guoping hu
YXYingzhi Xia
Yingzhi Xia
XRXiaoxue Ruan
Xiaoxue Ruan
MZMingxin Zheng
Mingxin Zheng
With the increase in the mileage of high‐speed railways around the world, subgrade problems related to the same have been emerging in large numbers. In view of the shortcomings of slow construction speed and large disturbance caused by conventional anti‐slide piles during emergency reinforcement of subgrades, an “arch–chord coupled anti‐slide structure” is proposed in this study, based on the three‐dimensional characteristics of the subgrade creep, and its anti‐slide mechanism is analyzed; furthermore, a theoretical calculation method for the same is proposed. The results show that the arch–chord coupled anti‐sliding structure can form a coupled body containing multiple surrounded piles when subjected to thrust, thus offering a pile–soil composite structure similar to a retaining wall. This results in a large anti‐sliding force. By setting a virtual pile to regularize the layout of the structural pile, the pile internal force can be accurately computed. The findings of this study provide a theoretical basis for the analysis and design of coupled anti‐sliding structures in future.

1 February 2022 in Research Square
Verified
Preprint
Open access
PDF file
GHguoping hu
guoping hu
YXYingzhi Xia
Yingzhi Xia
LZLianggen Zhong
Lianggen Zhong
XRXiaoxue Ruan
Xiaoxue Ruan
QWQingguo Wang
Qingguo Wang
The slope of an open cut tunnel is located above the exit of the Leijia tunnel on the Changgan high-speed railway. During the excavation of the open cut tunnel foundation pit, the slope slipped twice, a large landslide of 92500 m³ formed. The landslide body and unstable slope body not only caused the foundation pit of the open cut tunnel to be buried and the anchor piles to be damaged but also directly threatened the operational safety of the later high-speed railway. Therefore, to study the stability change in the slope of the open cut tunnel under heavy rain and excavation conditions, a 3D numerical calculation model of the slope is carried out by Midas GTS software, the deformation mechanism is analyzed, anti-sliding measures are proposed, and the effectiveness of the anti-sliding measures is analyzed according to the field monitoring results. The results show that when rainfall occurs, rainwater collects in the open cut tunnel area, resulting in a transient saturation zone on the slope on the right side of the open cut tunnel, which reduces the shear strength of the slope soil; the excavation at the slope toe reduces the anti-sliding capacity of the slope toe. Under the combined action of excavation and rainfall, when the soil above the top of the anchor pile is excavated, two potential sliding surfaces are bounded by the top of the excavation area, and the shear outlet is located at the top of the anchor pile. After the excavation of the open cut tunnel, the potential sliding surface is mainly concentrated at the lower part of the downhill area, and the shear outlet moves down to the bottom of the open cut tunnel. Based on the deformation characteristics and the failure mechanism of the landslides, comprehensive control measures, including interim emergency mitigation measures and long-term mitigation measures, are proposed. The field monitoring results further verify the accuracy of the anti-sliding mechanism analysis and the effectiveness of anti-sliding measures.

12 January 2022 in Polish Journal of Environmental Studies
Verified
Journal Article
Closed access
JPJunkui Pan
Junkui Pan
JLJiawei Liu
Jiawei Liu
GHguoping hu
guoping hu
JSJiamei Su
Jiamei Su
GQGuangyi Qin
Guangyi Qin
Taking an expressway service area as the study object, based on the SWMM and VADOSE/W models, the long-term water balance of exfiltration type bioretention (ZR) and anti-seepage type bioretention (ZF) were quantified, and the performance of bioretention on the long-term hydrological effects of the service area was studied. The results show that the ZR can significantly increase the annual underground discharge ratio compared with ZF, thereby reducing the underdrain outflow ratio, but has little effect on the overflow ratio and evapotranspiration ratio. ZR can significantly improve the hydrological balance of the service area, and increase the annual runoff control rate by 48.21%, and the utilization rate of rainwater resources in the service area can reach 73.47% by the combination of ZF and reservoir. For typical annual rainfall events, the average values of runoff reduction rate, runoff peak reduction rate and runoff delay of traditional service area were 59.45%, 57.17% and 5.19 h respectively, those of service area with ZR were 91.56%, 95.22% and 20.55 h respectively, and those of service area with ZF were 68.59%, 86.67% and 15.22 h respectively. ZR and ZF can both effectively improve the rainfall regulation ability of the service area, and the performance of ZR is relatively better. Furthermore, the correlation between runoff characteristics and rainfall characteristics for three types of service areas was analyzed, which can provide a reference for forecasting and controlling rainwater runoff in the service area.

11 October 2022 in Geofluids
Verified
Journal Article
Open access
PDF file
YXYingzhi Xia
Yingzhi Xia
JLJiawei Liu
Jiawei Liu
HLHui Li
Hui Li
GHguoping hu
guoping hu
In this study, the damage mechanism due to near-fault ground motions on large-span arch bridges with concrete-filled steel tubes was investigated based on a case study. A tied-arch bridge with concrete-filled steel tubes with a span of 460m has been examined using the numerical simulation method. The performance of the bridge was analyzed in terms of displacement, overall response, internal force changes, and damage probability considering the various near-fault and non-near-fault ground motions when imposing load onto the bridge. Then, the relationship between the bridge damage and the design parameters of ground motion intensities, near-fault velocity pulse, and excitation angle was obtained. The results indicated that the probability of damage caused by near-fault earthquakes is significantly higher than that by non-near-fault ground motions, and velocity pulses may cause more severe damages to certain components of the bridge during lower-intensity ground motions at certain excitation angles. And the damage furtherly resulted in the weakening of the bridge structure and decrease in its load-carrying capacity. Therefore, the near-fault ground motion should be fully considered in the design of large-span arch bridges with concrete-filled steel tubes in practical engineering.