James Storey

Dr. James Storey


Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
24 September 2020 in Remote Sensing
Verified
Journal Article
Open access
PDF file
RRRajagopalan Rengarajan
Rajagopalan Rengarajan
JSJames Storey
James Storey
MCMike Choate
Mike Choate
There is an ever-increasing need to use an accurate and consistent geometric ground reference in the processing of remotely sensed data products, as this reduces the burden on the end-users to account for the differences between the data products from different missions. In this regard, the U.S. Geological Survey (USGS) initiated an effort to harmonize the Landsat ground reference with the Sentinel-2 Global Reference Image (GRI) to improve the co-registration between the data products of the two global medium-resolution missions. In this paper, we discuss the process, results, and the improvements expected from this harmonization of two ground references using space-triangulation-based bundle adjustment techniques. The ground coordinates of the Landsat reference library, consisting of five million Ground Control Points (GCPs) were adjusted in a series of four simultaneous bundle block adjustments using thousands of Landsat-8 (L8) scenes anchored with more than 300,000 control points extracted from the GRI dataset. The net adjustments to each of the four blocks, namely, Australia, Americas, Eurasia, and Islands, varied anywhere from 1 to 13 m, depending on the accuracy of the GCPs in these blocks. The use of the GRI dataset in our bundle adjustment not only improved the absolute accuracy of the Landsat ground reference, but will also improve the co-registration between Sentinel-2 and Landsat terrain corrected products, as the European Space Agency plans to process the Sentinel-2 products using the GRI dataset. Independent validation of the Landsat products processed using harmonized GCPs with the GRI dataset indicated a global misregistration error of less than 8 m Circular Error Probable at 90 % (CE90), an improvement from the 25 m prior to harmonization. The improvements to the Landsat products using the harmonized GCPs are expected to be available to the public as part of Landsat Collection-2 processing by the end of 2020.

28 November 2020 in Remote Sensing
Verified
Journal Article
Open access
PDF file
SFShannon Franks
Shannon Franks
JSJames Storey
James Storey
RRRajagopalan Rengarajan
Rajagopalan Rengarajan
The Landsat Collection-2 distribution introduces a new global Digital Elevation Model (DEM) for scene orthorectification. The new global DEM is a composite of the latest and most accurate freely available DEM sources and will include reprocessed Shuttle Radar Topographic Mission (SRTM) data (called NASADEM), high-resolution stereo optical data (ArcticDEM), a new National Elevation Dataset (NED) and various publicly available national datasets including the Canadian Digital Elevation Model (CDEM) and DEMs for Sweden, Norway and Finland (SNF). The new DEM will be available world-wide with few exceptions. It is anticipated that the transition from the Collection-1 DEM at 3 arcsecond to the new DEM will be seamless because processing methods to maintain a seamless transition were employed, void filling techniques were used, where persistent gaps were found, and the pixel spacing is the same between the two collections. Improvements to the vertical accuracy were realized by differencing accuracies of other elevation datasets to the new DEM. The greatest improvement occurred where ArcticDEM data were used, where an improvement of 35 m was measured. By using theses improved vertical values in a line of sight algorithm, horizontal improvements were noted in some of the most mountainous regions over multiple 30-m Landsat pixels. This new DEM will be used to process all of the scenes from Landsat 1-8 in Collection-2 processing and will be made available to the public by the end of 2020.

6 August 2022 in Remote Sensing
Verified
Journal Article
Open access
PDF file
MCMike Choate
Mike Choate
RRRajagopalan Rengarajan
Rajagopalan Rengarajan
JSJames Storey
James Storey
MLMark Lubke
Mark Lubke
The Landsat program has a long history of providing remotely sensed data to the user community. This history is being extended with the addition of the Landsat 9 satellite, which closely mimics the Landsat 8 satellite and its instruments. These satellites contain two instruments, the Operational Land Imager (OLI) and the Thermal Infrared Sensor (TIRS). OLI is a push-broom sensor that collects visible and near-infrared (VNIR) and short-wave infrared (SWIR) wavelengths at 30 m ground sample distance, along with a panchromatic 15 m band. The TIRS sensor contains two long-wave thermal spectral channels centered at 10.9 and 12 µm. The data from these two instruments, on both satellites, are combined into a single Landsat product. The Landsat 5–9 satellites follow a 16 day repeat cycle designated as the Worldwide Reference System (WRS-2), which provides a global notional gridded mapping for identifying individual Landsat scenes. The Landsat 8 and 9 satellites are flown such that their orbital tracks are separated by 8 days in this 16 day cycle. During the commissioning period of Landsat 9, and during its ascent to its operational WRS-2 orbit, the Landsat 9 satellite’s orbital track went under and crossed over the orbital track of the Landsat 8 satellite. This produced a unique situation where nearly time-coincident imagery could be obtained from the instruments of the two spacecrafts. From a radiometric standpoint, this allowed for near-time cross-calibration between the instruments to be performed. From a geometry perspective, calibration is achieved through high-resolution reference imagery over specific ground locations, thus ensuring calibration of the instruments and for the instruments to be well cross-calibrated geometrically. Although these underfly data do not provide calibration of the instruments between the platforms from a geometric perspective, they allow for the verification of the calibration steps involving the instruments and spacecraft. This paper discusses the co-registration of this unique set of data while also discussing other geometric aspects of these data by looking at and comparing the differences in sensor viewing and sun angles associated with the collections from the two platforms for imagery obtained over common geographic locations. The image-to-image comparisons between Landsat 8 and 9 coincident pairs, where both datasets are precision terrain products, are registered to within 2.2 m with respect to their root-mean-squared radial error (RMSEr). The 2.2 m represents less than 0.1 of a 30 m multispectral pixel in misregistration between the L9 and L8 underfly products that will be available to the user community. This unique dataset will provide well-registered, near-coincident image acquisitions between the two platforms that can be a key to any calibration or application comparisons. The paper also presents that, for images for which one of the image pairs failed precision corrections and became a terrain-corrected only product type, a range of 8–14 m RMSEr could be expected in co-registration, while, in cases where both image pairs failed the precision correction step and both images became a terrain-corrected only product type, a 14 m RMSEr could be expected for co-registration.

22 April 2021 in Remote Sensing
Verified
Journal Article
Open access
PDF file
MCMike Choate
Mike Choate
RRRajagopalan Rengarajan
Rajagopalan Rengarajan
JSJames Storey
James Storey
MLMark Lubke
Mark Lubke
The Landsat 7 (L7) spacecraft and its instrument, the enhanced thematic mapper plus (ETM+), have been consistently characterized and calibrated since its launch in April of 1999. These performance metrics and calibration updates are determined through the U. S. Geological Survey (USGS) Landsat image assessment system (IAS), which has been performing this function since launch. Starting in 2016, the USGS adopted a tiered collection management structure for its Landsat data products that ensures a consistent method of processing for the Landsat archive within a given collection while allowing a set of calibration updates to be performed between any two given collections. The time frame between 2016 and the end of 2020 was part of the Landsat data Collection 1, in the middle of 2020 was the start of the Landsat Collection 2 data products. The start of a given collection initiates the reprocessing of the Landsat archive, which may involve one or more of a set of updated calibration parameters, improvements in the support data needed for product generation, and improved algorithms used in both the processing flow of products along with the characterization and calibration of the Landsat instruments and spacecraft. This paper discusses only the ETM+ geometric spacecraft and instrument calibration improvements for Collection 2. Three ETM+ calibration updates were made for the ETM+; updates to the thermal band odd-to-even detector alignment, sensor to attitude control system (ACS) alignment, and a cold-to-warm focal plane alignment adjustment. The sensor alignment updates impact only the accuracy of the systematic terrain products (L1GT), which are the products generated before applying any corrections based on the ground control used in registration. The band alignment changes impacted only bands 5, 6, and 7 within the focal plane. Other geometric calibration updates, such as scan mirror alignment, are done on a routine basis and are not part of the Collection 2 updates due to their more dynamic characteristics.

12 July 2023 in Remote Sensing
Verified
Journal Article
Open access
PDF file
MCMike Choate
Mike Choate
RRRajagopalan Rengarajan
Rajagopalan Rengarajan
JSJames Storey
James Storey
MLMark Lubke
Mark Lubke
Starting with launch of Landsat 7 (L7) on 15 April 1999, the USGS Landsat Image Assessment System (IAS) has been performing calibration and characterization operations for over 20 years on the Landsat spacecrafts and their associated payloads. With the launch of Landsat 9 (L9) on 27 September 2021, that spacecraft and its payloads, the Operational Land Imager-2 (OLI-2) and Thermal Infrared Sensor-2 (TIRS-2), were added to the existing suite of missions supported by the IAS. This paper discusses the geometric characterizations, calibrations, and performance analyses conducted during the commissioning period of the L9 spacecraft and its instruments. During this time frame the following calibration refinements were performed; (1) alignment between the OLI-2 and TIRS-2 instruments and the spacecraft attitude control system, (2) within-instrument band alignment, (3) instrument-to-instrument alignment. These refinements, carried out during commissioning and discussed in this paper, were performed to provide an on-orbit update to the pre-launch calibration parameters that were determined through Ground System Element (GSE) testing and Thermal Vacuum Testing (TVAC) for the two instruments and the L9 spacecraft. The commissioning period calibration update captures the effects of launch shift and zero-G release, and typically represents the largest changes that are made to the on-orbit geometric calibration parameters during the mission. The geometric calibration parameter updates performed during commissioning were done prior to releasing any L9 products to the user community. This commissioning period also represents the time frame during which focus is more strictly placed on the spacecraft and instrument performance, ensuring that system and instrument requirements are met, as contrasted with the post commissioning time frame when a greater focus is placed on the products generated, their behavior and their impact on the user community. Along with the calibration updates discussed in this paper key geometric performance requirements with respect to geodetic accuracy, geometric accuracy, and swath width are presented, demonstrating that the geometric performance of the L9 spacecraft and its’ instruments with respect to these key performance requirements are being met. Within the paper it will be shown that the absolute geodetic accuracy is met for OLI-2 and TIRS-2 with a margin of approximately 79% and 65% respectively while the geometric accuracy is met for OLI-2 and TIRS-2 with a margin of approximately 68% and 43% respectively.

9 February 2021 in Remote Sensing
Verified
Journal Article
Open access
PDF file
MCMike Choate
Mike Choate
RRRajagopalan Rengarajan
Rajagopalan Rengarajan
JSJames Storey
James Storey
TBTim Beckmann
Tim Beckmann
The Landsat 8 (L8) spacecraft and its two instruments, the operational land imager (OLI) and thermal infrared sensor (TIRS), have been consistently characterized and calibrated since its launch in February 2013. These performance metrics and calibration updates are determined through the U.S. Geological Survey (USGS) Landsat image assessment system (IAS), which has been performing this function since its launch. The TIRS on-orbit geometric calibration procedures include TIRS-to-OLI alignment, TIRS sensor chip assembly (SCA) alignment, and TIRS band alignment. In December 2014, the TIRS instrument experienced an anomalous condition related to the instrument’s ability to accurately measure the location of the scene select mechanism (SSM). The SSM is a rotating mirror that allows the instrument’s field of view to be pointed at the Earth, for normal imaging, or at either deep space or an onboard black body, for radiometric calibration purposes. This anomalous condition in the SSM’s position sensor made it necessary to implement a new mode of operation for this mirror, termed mode-0. Mode-0 involves operating the mirror in an open-loop control state during normal mission operations when acquiring Earth data. Closed-loop mode-4 is needed for directing the mirror towards the radiometric calibration targets and is used approximately once every two weeks to collect radiometric calibration data. Mode-0 is used for most operational imaging because it does not require SSM encoder data, thereby allowing the SSM encoder electronics to remain unpowered most of the time, reducing its use throughout the lifetime of the TIRS instrument, thus helping to preserve its nominal behavior during it use. This paper discusses the geometric calibration of the SSM mirror during its current normal mode-0 set of image operations, as its open-loop control allows the mirror to drift over time in its uncontrolled state and its effects on products. The results shown in this paper demonstrate that the ability to have ongoing updates to the modeling of the TIRS SSM mirror model, in both an automated fashion and with a set of more manual operations, allows accuracy that approaches mode-4 results within days from the start of a mode-0 event.