Ehsan Rezazadeh Azar

Dr. Ehsan Rezazadeh Azar


Research Focus & Metrics

Academic Career Length

10Years (2017-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 March 2018 in Journal of Computing in Civil Engineering
Verified
Journal Article
Closed access
HHHesam Hamledari
Hesam Hamledari
EAEhsan Rezazadeh Azar
Ehsan Rezazadeh Azar
BMBrenda McCabe
Brenda McCabe
Accurate and proactive inspection of constructed objects and identification of their defects and design conformity is vital to both facility management and construction projects. A project’s building information model (BIM) needs to be regularly updated to more accurately reflect the actual site conditions. However, conventional practices lack site-data integration with models and rely on manual, error-prone, and costly updates. This paper proposes and demonstrates a robust technique that uses the industry foundation classes (IFC) schema to automatically update an as-designed BIM based on site observations for inspected building elements. It receives as input an inspected object’s actual type and inspection details including the detected defects/changes, responsible actors, as-built/as-is type, captured images, and time and the date of the inspection. The algorithm automatically analyzes the IFC data model to retrieve the element’s semantics and identifies discrepancies between the as-built/as-is and as-designed object conditions. Based on the results of the discrepancy analysis, the IFC data model is populated with new semantics, resulting in the update of object types, properties, and three-dimensional (3D) shape representations. Inspection details and user entries are automatically documented in the BIM and assigned to objects to enable potential diagnostics and tractability. This automates site-to-BIM data transfer and supports reality-capture techniques.

1 February 2021 in Journal of Performance of Constructed Facilities
Verified
Journal Article
Closed access
PDF file
Sandra PozzerSandra Pozzer
Sandra Pozzer
EAEhsan Rezazadeh Azar
Ehsan Rezazadeh Azar
FRFrancisco Dalla Rosa
Francisco Dalla Rosa
ZPZacarias MARTIN CHAMBERLAIN Pravia
Zacarias MARTIN CHAMBERLAIN Pravia
There is a global research trend to enhance condition assessment of the concrete infrastructure by the development of advanced nondestructive testing (NDT) methods. Computer vision–based systems have been developed to detect different types of defects in both regular and thermographic images because these systems could offer a timely and cost-effective solution and are able to tackle the inconsistency issues of manual assessment. This paper investigates the performance of different deep neural network models to detect main concrete anomalies, including delamination, cracks, spalling, and patches in thermographic and regular images captured from a variety of distances and viewpoints. These models were trained and tested using images taken from a century-old buttress dam and validated in images captured from the decks of two concrete bridges. The results showed that the MobileNetV2 had promising performance in the identification of multiclass damages in the thermal images, identifying 79.7% of the total delamination, cracks, spalling, and patches on the test images of highly damaged concrete areas. The VGG 16 model showed better precision by reducing the number of false detections.

1 August 2022 in NDT & E International
Verified
Journal Article
Closed access
Sandra PozzerSandra Pozzer
Sandra Pozzer
MSMarcos Paulo Vieira De Souza
Marcos Paulo Vieira De Souza
BHBata Hena
Bata Hena
SHSetayesh Hesam
Setayesh Hesam
RRReza Khoshkbary Rezayiye
Reza Khoshkbary Rezayiye
XMXavier Maldague
Xavier Maldague

5 April 2019 in Construction Innovation
Verified
Journal Article
Closed access
ZWZiwei Wang
Ziwei Wang
EAEhsan Rezazadeh Azar
Ehsan Rezazadeh Azar
Purpose: Project schedules have a vital role in the effective management of time, cost, scope and resources in construction projects, and creating schedules requires schedulers with construction knowledge and experience. The increase in the complexity of building projects and the emergence of building information modeling (BIM) in the architecture, engineering and construction industry have encouraged researchers to explore BIM capabilities for automated schedule generation. The scope and capabilities of the developed systems, however, are limited and the link between design and scheduling is still underdeveloped. This paper aims to investigate methods to develop a BIM-based framework to automatically generate schedules for concrete-framed buildings. Design/methodology/approach: This system first extracts the required data from the building information model, including elements’ dimensions, quantities, spatial information, materials and other related attributes. It then applies construction rules, prior knowledge and production rate data to create project work-packages, calculate their durations and determine their relationships. Finally, it organizes these results into a schedule using project management software. Findings: This system provides an automated and easy-to-use approach to generate schedules for concrete-framed buildings that are modeled in a BIM platform. It provides two schedules for each project, both a sequential and an overlapped solution, which the schedulers can modify into a practical schedule based on conditions and available resources. Originality/value: This research project presents an innovative approach to use BIM-based attributes of structural elements to develop list of work-packages and estimate their durations, and then it uses a combination of rule-based and case-based reasoning to generate the schedules.

13 June 2017
Verified
Conference Paper
Closed access
BMBrenda McCabe
Brenda McCabe
HHH. Hamledari
H. Hamledari
ASA. Shahi
A. Shahi
PZPouya Zangeneh
Pouya Zangeneh
EAEhsan Rezazadeh Azar
Ehsan Rezazadeh Azar
Although construction is often seen as an outdoor activity, much of the work is completed indoors. The indoor environment presents many challenges for the automatic capture of data during progress monitoring, quality control, quantity verification, and overall project documentation. This paper examines the potential of using robots, and more specifically, unmanned aerial vehicles (UAV) and unmanned aerial systems (UAS), to monitor indoor construction sites. UAVs have become ubiquitous due to their commercialization as an off-the-shelf tool. However, their potential to facilitate the automation of many mundane and challenging activities in indoor construction is very high. Unfortunately, they also come with some important challenges. This paper explores the potential applications for UAV in indoor construction sites, their benefits, and their challenges. A sample of the benefits of this technology include their in-flight agility, capacity to hold an array of sensors, and automation potential. Challenges include potential safety risks if they distract or interfere with workers, navigation within ever changing surroundings, battery capacity limits, and impacts of automation. Finally, challenges of a multi-sensory smart UAS with respect to emerging technologies such as internet of things (IoT) and possible solutions are discussed.

23 May 2020 in Journal of Civil Structural Health Monitoring
Verified
Journal Article
Closed access
PDF file
Sandra PozzerSandra Pozzer
Sandra Pozzer
ZPZacarias MARTIN CHAMBERLAIN Pravia
Zacarias MARTIN CHAMBERLAIN Pravia
EAEhsan Rezazadeh Azar
Ehsan Rezazadeh Azar
FRFrancisco Dalla Rosa
Francisco Dalla Rosa