Farah Oshaibi

Ms. Farah Oshaibi


Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
4 June 2021 in Applied Sciences
Verified
Journal Article
Open access
PDF file
NONuha Odeh
Nuha Odeh
ATAnas Toma
Anas Toma
FMFalah Mohammed
Falah Mohammed
Yousef DamaYousef Dama
Yousef Dama
FOFarah Oshaibi
Farah Oshaibi
MSMuna Shaar
Muna Shaar
This paper presents a fast and accurate system to determine the type of blood automatically based on image processing. Blood type determination is important in emergency situations, where there is a need for blood transfusion to save lives. The traditional blood determination techniques are performed manually by a specialist in medical labs, where the result requires a long time or may be affected by human error. This may cause serious consequences or even endanger people’s lives. The proposed approach performs blood determination in real-time with low cost using any available mobile device equipped with a camera. A total of 500 blood samples were processed in this study using different image matching techniques including oriented fast and rotated brief (ORB), scale invariant feature transform (SIFT), and speed-up robust feature (SURF). The evaluation results show that our proposed system, which adopts the ORB algorithm, is the fastest and the most accurate among the state-of-the-art systems. It can achieve an accuracy of 99.6% in an average time of 250 ms.

8 March 2024 in Preprints.org
Verified
Preprint
Open access
PDF file
FOFarah Oshaibi
Farah Oshaibi
Mohammed AlkhanafsehMohammed Alkhanafseh
Mohammed Alkhanafseh
OSOla Mohammad Surakhi
Ola Mohammad Surakhi
Software project estimating (SPE) is a powerful but necessary step in the production of projects for software. Software project estimating includes several components, estimating software time, software resources, software costs, and software effort estimation (SEE). SEE seeks to estimate the number of "hours-person" and "months-person" of work required for developing or managing a software program. During the initial phase of the development of software, future efforts are impossible to predict. To estimate effort, many deep learning (DL) and machine learning (ML) models were previously created. For estimate, single-model techniques and ensemble methods were investigated in this research. Ensemble methods involve a combination of multiple separate models. Bagging, boosting, and voting were the ensemble methods looked into for estimation. Datasets considered for estimation were COCOMO81, COCOMONasa I, COCOMONasa II, Albrecht, Maxwell, China, Desharnais, Desharnais_1_1, Kitchenham, Boehm, and Belady. The evaluation criteria used MAE, RAE, RMSE, RRSE, and CC. The result from previous studies is that the total size of the set of data utilized is small in predicting the effort, as the largest size of the set of data used is the China dataset containing only 499 projects. So, in this study, the dataset has been merged to increase the total size of the set of data and increase the accuracy of prediction. The results indicated that the suggested merged dataset increased effort estimation accuracy.